Senior Estimation Engineer
Sharqawi Co
Total years of experience :16 years, 2 Months
Manage the Estimating Engineers and Assistant Estimating Engineers, including completing performance evaluations.
Study project scope of work, specifications, drawings and other contract documents.
Ability to work on preliminary layout and design to generate conceptual and detailed pre-contract estimations.
Prepare detailed estimation of the job to be quoted, review estimation to ensure completeness and compliance with the defined scope of work as per the tender.
Prepare lump sum cost including materials, labor cost, equipment and consumables according to pricing format given by the client.
Prepare unit rates/cost for change order and variations.
Identify & prepare queries and clarifications regarding the project on bid and refer to client.
Implement all provisions and requirements of the Project Contract into the cost summary.
Responsible for the value engineering process during preconstruction for the assigned projects.
Ensure strict adherence to safety, Quality Assurance/Quality Control (QA/QC), ethics and compliance requirements at all times.
Communicate and collaborate with Operations and Purchasing during preconstruction efforts.
Assist Purchasing in evaluating and analyzing subcontractor proposals.
Handle up to four tenders per month with bidding duration of 2-8 weeks.
Coordinate with Project Department after a project is awarded.
Attend pre-bid meetings and site visits.
Prepare Material Take-off and Bill of Quantities from Issued for Bid drawings and documents.
Assign man-hours required to procure, fabricate, install, test and commission materials.
Prepare request for quotations of materials and sub-contracting works. Priority given to items that require lead-time to quote and bulk materials that affect the total value of the project.
Follow-up with sub-contractors, suppliers and manufacturers to obtain quotations on time.
Evaluate received quotations conformity with required specifications. Study and check all the conditions of quotations, included and excluded items that may affect the total cost of materials or services offered.
Prepare price comparison of quotations received.
Revise the pricing if applicable based on received addendum, answers to clarifications, revised drawings and specifications.
Keep a record of drawings, quotations, clarifications and all contract documents received during the bidding period for future reference.
Complete the pricing process ahead of schedules in order to have enough time to review and evaluate the tender to be submitted.
Discuss with superior the prepared summary of cost. Highlight major materials or services that will affect the over-all pricing. Study alternatives to reduce total cost whilst complying with the project’s requirements.
Familiar with Aramco Standards, Royal Commission Standards, NEC, IEC, and other international and local standards.
Able to implement quality management plan for big projects.
Achieve a detailed understanding of the contract documents (drawings and specifications), phasing plans, MEP systems interrelationships, construction sequencing and project schedule.
Prepare overall plan for electrical works.
Liaise with the project planner with respect to preparation of summarized and detailed programs for electrical works.
Liaise with engineering manager with respect to readiness of the electrical shop drawings before commencement of related activities with sufficient time.
Request electrical materials, tools and equipment as required.
Participate in preparing the subcontracts for electrical subcontractors and monitor the implementation of these subcontracts.
Participate in preparing the purchase orders for electrical materials and equipments and monitor the implementation of these orders until receiving the goods.
Monitor electrical activities and electrical subcontractors work with respect to quality, progress and participate in preparing their periodical valuations.
Participate in preparing project monthly valuations and reports.
Liaise and coordinate with the consultant and owner representatives with respect to project electrical.
Installations of MV switch gear system.
Arranging Cables (Power and Control) Pulling, Termination, and Scheduling and line test and insulation.
Electrical Systems under civil works: Lighting system, lighting panels installation, lighting network installation, MV and LV distribution panels' installation, MV transformers installation, Grounding system, and Fire Alarming system.
Installation of cables ducts bank and cable trays.
Installation of cathodic protection system for steel structures.
Familiar with the above systems testing and commissioning procedure.
تقدير جيد