senior electrical engineer
audio technology
مجموع سنوات الخبرة :11 years, 9 أشهر
Responsible for the overall managing and coordination with subcontractors, consultants and other team members in projects
to make sure the proposed plan adheres to the timeline, budget and materials scope, and manufacture, deliver materials to
prepare delivery notes
• Prepare BOQ and Follow up suppliers and contractors, setting schedules for all stakeholders and executing each step of the
project.
• Responsible for mechanism, electrical and steel structure, and controlling warehouse materials and transportation for opera
project new capital and zewail university
• prepare MIRs, IRs and all technical drawings and materials submit to consultant as per duties scope.
• Electrical installation department for Audio visual, Public Address, Pro Audio & Lighting.
Electrical design technical office for light current security system special all fire alarm
and fire fighting systems, electrical power distribution
Quality control for site to make sure the design and panels and routing and contractors
doing well for projects path and minutes of delivery
Testing the networks start form fire pump (from the water tank) to the networks route,
and all electrical system
Data entry for orders supply, system quantities, plan schedule, issues for sites and
reporting
Site survey for electrical system design
Submittals for tenders like technical offer, technical drawing for electrical work like
distribution panels and lighting and light current system, technical specifications, data
sheets, bill of quantity (BOQ), design criteria, shop drawing, as build drawing,
Training for clients for how to system works
Responsible for Installation, & Troubleshooting of Light Current Systems as CCTV,
Fire Alarm, Audio & Visual Systems, Attendance Systems, and Sound Systems, where I
have worked in several projects such as the new administrative capital.
Collaborate with project managers to deliver detailed project plans and work breakdown.
Ensure the regular & proper verification, implementation, maintenance, and functionally
of the light current system.
Develop a timeline in accordance with the requested action plan.
Write the statement of Work to the consulting companies.
installations all cabinet of Ericsson, get link of site, make sure for safety on sites