Total Years of Experience: 31 Years, 5 Months
March 2020
To Present
Gelil Structure design Founder
at Gelil
Location :
Egypt - Alexandria
صاحب ومؤسس مكتب Gelil للتصميمات الإنشائية
July 2018
To February 2020
Senior Structural Design Engineer
I found this job using Bayt.com
at Mobco
Location :
Egypt - Cairo
Redesign & shopdrawings for Kaust hotel at Jedda 6 floors
Redesign & shopdrawings for Masic hotel at Jedda 9 floors
Redesign & shopdrawings for Askut hotel at Abha 12 floors
Redesign & shopdrawings for Chamber of Commerce at Madina 5 floors
Redesign & shopdrawings for Park Inn Hotel at Riyadh 16 floors
Redesign & shopdrawings for Museum & Park at Madina 6 floors
Design & drawings for Pre-cast multistory car parking for MOC at Riyadh
Hilton Double Tree & Garden Inn 16 floors at Riyadh RC + PT 55 M SR
SFDA Administrative building 5 floors at Dammam 79 M SR
Taef & Baha 2 University Hospital 400 bed for each 122 M SR
Al Narges IPA Housing 43 M SR
M.O.E car parking 5 floors at Riyadh
M.O.E. IT Building
Rehabititation Construction of Jazan General Hospital on Piles 600
& Micropiles 300 150 M SR
Dongo Shizar (Al Bayan)
tanks, all outside network and landscape for Water Treated plants with MODON:
All 125 M SR
Participating in structrual design of Al kharj STP 200, 000 m3/day 225 M SR
Participating in structrual design of strategic reservoirs at Faysalia - Jeddah
Getco
Head ofStructural Design Dep. Mobco
including RO building, tanks, pump stations, infrastructure and landscape at:
Redesign & shopdrawings for Masic hotel at Jedda 9 floors
Redesign & shopdrawings for Askut hotel at Abha 12 floors
Redesign & shopdrawings for Chamber of Commerce at Madina 5 floors
Redesign & shopdrawings for Park Inn Hotel at Riyadh 16 floors
Redesign & shopdrawings for Museum & Park at Madina 6 floors
Design & drawings for Pre-cast multistory car parking for MOC at Riyadh
Hilton Double Tree & Garden Inn 16 floors at Riyadh RC + PT 55 M SR
SFDA Administrative building 5 floors at Dammam 79 M SR
Taef & Baha 2 University Hospital 400 bed for each 122 M SR
Al Narges IPA Housing 43 M SR
M.O.E car parking 5 floors at Riyadh
M.O.E. IT Building
Rehabititation Construction of Jazan General Hospital on Piles 600
& Micropiles 300 150 M SR
Dongo Shizar (Al Bayan)
tanks, all outside network and landscape for Water Treated plants with MODON:
All 125 M SR
Participating in structrual design of Al kharj STP 200, 000 m3/day 225 M SR
Participating in structrual design of strategic reservoirs at Faysalia - Jeddah
Getco
Head ofStructural Design Dep. Mobco
including RO building, tanks, pump stations, infrastructure and landscape at:
May 2015
To June 2018
at Al Kharj industerial city
Structural design, shop drawing, all buildings (concrete & steel),
March 2014
To May 2015
October 2005
To October 2007
Maintenance engineer
at K.S.A.
Al Dawadmy - Riyadh Region
Works at Egypt
Staad Pro RAM Concept
Supervision on construction of hotel 5 stars ( 22 floors )
Al Dilam - Riyadh Region
Structural design and shop drawing for S.T.P (25000 m3/day) at :
Al Dawadmy - Riyadh Region
Supervision on construction of Al Laith earth dam
Maintenance of all civil works of governor hospital .
Al Rass - Qassim Region
Unaiza - Qassim Region
Al Aflag - Riyadh Region
Works at Egypt
Staad Pro RAM Concept
Supervision on construction of hotel 5 stars ( 22 floors )
Al Dilam - Riyadh Region
Structural design and shop drawing for S.T.P (25000 m3/day) at :
Al Dawadmy - Riyadh Region
Supervision on construction of Al Laith earth dam
Maintenance of all civil works of governor hospital .
Al Rass - Qassim Region
Unaiza - Qassim Region
Al Aflag - Riyadh Region
January 2005
To October 2005
Project manager
Supervision on construction of house building ( 14 floors )
& 2 villas at Kafer Abdo - Alex. By Arab contactors .
& 2 villas at Kafer Abdo - Alex. By Arab contactors .
March 2000
To January 2005
Project manager
7 house buildings of engineering syndicate at Borg Alarab 2 years
4 star resort at Sharm Elshaikh ( Napq ) 3 years
4 star resort at Sharm Elshaikh ( Napq ) 3 years
March 1998
To March 2000
Project manager
Construction of electrical power station 11\22 KV ( Sadat city ) 1 year
Concrete piles & foundation for pipes rack at A.P.C. 1 year
Concrete piles & foundation for pipes rack at A.P.C. 1 year
August 1991
To March 1998
Executive manager
Construction of 36 house buildings at Mobark city - Alex . 1 year
All constructions, finishing & utilities of 112 villas at North C. 2 years
All constructions, finishing & utilities of 112 villas at North C. 2 years
September 1989
To July 1991
Executive engineer
Executive & supervision of deferent housing projects
January 1990
To October 1990
Executive engineer
Executive of 1000 housing units with low coast at Noparia.
January 1987
To January 1990
Executive engineer
at Air Force
Location :
Egypt
Executive of water supply & drainage nets with its options at
Share on Facebook
Share on Twitter
Share Via Email