Gelil Structure design Founder
Gelil
مجموع سنوات الخبرة :31 years, 0 أشهر
صاحب ومؤسس مكتب Gelil للتصميمات الإنشائية
Redesign & shopdrawings for Kaust hotel at Jedda 6 floors
Redesign & shopdrawings for Masic hotel at Jedda 9 floors
Redesign & shopdrawings for Askut hotel at Abha 12 floors
Redesign & shopdrawings for Chamber of Commerce at Madina 5 floors
Redesign & shopdrawings for Park Inn Hotel at Riyadh 16 floors
Redesign & shopdrawings for Museum & Park at Madina 6 floors
Design & drawings for Pre-cast multistory car parking for MOC at Riyadh
Hilton Double Tree & Garden Inn 16 floors at Riyadh RC + PT 55 M SR
SFDA Administrative building 5 floors at Dammam 79 M SR
Taef & Baha 2 University Hospital 400 bed for each 122 M SR
Al Narges IPA Housing 43 M SR
M.O.E car parking 5 floors at Riyadh
M.O.E. IT Building
Rehabititation Construction of Jazan General Hospital on Piles 600
& Micropiles 300 150 M SR
Dongo Shizar (Al Bayan)
tanks, all outside network and landscape for Water Treated plants with MODON:
All 125 M SR
Participating in structrual design of Al kharj STP 200, 000 m3/day 225 M SR
Participating in structrual design of strategic reservoirs at Faysalia - Jeddah
Getco
Head ofStructural Design Dep. Mobco
including RO building, tanks, pump stations, infrastructure and landscape at:
Structural design, shop drawing, all buildings (concrete & steel),
Al Dawadmy - Riyadh Region
Works at Egypt
Staad Pro RAM Concept
Supervision on construction of hotel 5 stars ( 22 floors )
Al Dilam - Riyadh Region
Structural design and shop drawing for S.T.P (25000 m3/day) at :
Al Dawadmy - Riyadh Region
Supervision on construction of Al Laith earth dam
Maintenance of all civil works of governor hospital .
Al Rass - Qassim Region
Unaiza - Qassim Region
Al Aflag - Riyadh Region
Supervision on construction of house building ( 14 floors )
& 2 villas at Kafer Abdo - Alex. By Arab contactors .
7 house buildings of engineering syndicate at Borg Alarab 2 years
4 star resort at Sharm Elshaikh ( Napq ) 3 years
Construction of electrical power station 11\22 KV ( Sadat city ) 1 year
Concrete piles & foundation for pipes rack at A.P.C. 1 year
Construction of 36 house buildings at Mobark city - Alex . 1 year
All constructions, finishing & utilities of 112 villas at North C. 2 years
Executive & supervision of deferent housing projects
Executive of 1000 housing units with low coast at Noparia.
Executive of water supply & drainage nets with its options at
.