Consultant in Solid waste Management and Wastewater Treatment
GREEN Environment Consultants for environmental consultancy
Total years of experience :21 years, 1 Months
1. Introduction solutions for different problems in wastewater for factories.
2. Proposing the appropriate wastewater treatment methods
3. Designing of treatment techniques.
4. Supervision on selection of wastewater treatment plant facilities
5. Carrying out feasibility studies for wastewater treatment
6. Cost analysis for wastewater treatment.
7. Environmental and social impact assessment
8. Carrying out of environmental auditing.
9. introduction option for Recycling of different wastes
Introduction solutions for different problems in wastewater for factories.
Proposing the appropriate wastewater treatment merthods
Designing of treatment techniques.
Supervision on selection of wastewater treatment plant facilities
Carrying out feasibility studies for wastewater treatment
Cost analysis for wastewater treatment
Projects related to wastewater management that participates in them: • Wastewater management for HELB Pesticides and Chemicals Co. project, New Damietta, Egypt (2003). Sponsored by Egypt Environmental Initiative Fund (EEIF) and CIDA Environmental Management. • Wastewater Management for SMC Metal Company Project (2003). Sponsored by Egypt Environmental Initiative Fund (EEIF) and CIDA Environmental Management. • Feasibility studies for El Nagar New industrial City in Syria. National Research Center in Association with Dr Ashamed Adel Warth Consulting Engineers (2004). • Feasibility Studies for El El Sadat industrial City, Egypt. National Research Center in Association with Dr Ashamed Adel Warth Consulting Engineers (2004). • Feasibility studies for Hysia (HOMS) industrial City, Syria. National Research Center in Association with Dr Ashamed Adel Warth Consulting Engineers (2004-2005). • Feasibility studies for Adra industrial City, Syria. National Research Center in Association with Dr Ashamed Adel Warth Consulting Engineers (2004-2005). • Treatment of Dairy wastewater. In a combined up- flows UASB- AS System. Case Study Arab Dairy Company. Sendebeese- Kanater Kalubia Governarate (2005). • Advanced Processes for Removing Non- Biodegradable Pollutants from water and wastewater Scientific and Technological Cooperation Programme between Italy and Egypt.-Project No.env.2 (2004-2006). • Treatability studies of the industrial effluents for Honey Well Sweets Company (2001). 10 th. Of Rmadan City (2005). • Treatability study of wastewater treatment of Unipharma Company of pharmaceutical industries, 2010. • Treatability study of wastewater of Royal Chemical Company for Cosmetics raw materials, 2010. • Treatability study of wastewater of Royal Cosmetic Company, 2010. • Treatability study of efficiency of Dream Land wastewater treatment plant, (WPRD) (2010). • Treatability study of wastewater from maceration of flax Company; (WPRD) (2011). Projects related to wastewater management that participates as PI: • Treatability study of wastewater treatment of AMOC Company for mineral oil manufacture, 2009. • Treatability study of SIDPEC Company wastewater treatment for petrochemical industries, 2009. • Treatability study of wastewater from EBIC Company for fritters manufacture; (2012). • Treatability study of wastewater from MAC Company for carpet manufacture, (2012). • Treatability study of wastewater from Gesma Company for Oil production, (2013). • Treatability study of produced water treatment from Quran Company for Oil production, designing of Treatment plant for treatment of 10,000 bbl/day, (2014). • Treatability study of produced water treatment from Quran Company for Oil production, designing of Treatment plant for treatment of 1000 bbl/day, (2015).