محمد عطية فياض فياض, Inspection General Manager

محمد عطية فياض فياض

Inspection General Manager

Belayim petroleum company

البلد
مصر
التعليم
بكالوريوس, engineering
الخبرات
26 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :26 years, 7 أشهر

Inspection General Manager في Belayim petroleum company
  • مصر - المنصورة
  • سبتمبر 2000 إلى يناير 2018

1. Perform annual inspection plan and supervise the implementation of El-Qara’a & LPG And
LTS static equipments as (tanks, heaters, heat exchangers, treatment towers, pressure vessel
and separators) .
2. Perform annual inspection plan and supervise the implementation of LPG And LTS rotating equipment’s as ( pumps, coolers and compressors ) . 3. Review corrosion monitoring and cathodic protection system report. 4. Inspect off shore platforms facilities . 5. Review non destructive testes activities including UT & RT. 6. Supervise painting and coating application. 7. Review material failure analysis studies. 8. Prepare required inspection reporting. 9. Participate in plane daily activity meeting. 10. Review and approve material request for the inspection department.
11. Perform the vibration measurements, analysis and diagnostic for all rotary machines vibration problems and put necessary action to solve problem .
12. Uses all condition monitoring devices of IRD, DLi and CSI companies
13. Inspection piping, piping coating and painting 14. Perform the cathodic protection measurements, analysis and diagnostic for all cathodic
protection systems and put necessary action to solve problem . 15. Inspection oil and water storage tanks . 16. Perform the approval testing of welders .
17. Checking fit up of the joint before start welding operation as per the detailed drawing (root
gap, bevel angle, surface mismatch) .
18. Checking fit up of the joint before start welding operation as per the detailed drawing (root
gap, bevel angle, surface mismatch) .
19. Checking welder facilities and tools needed for welding .
20. Checking electrode type, size & record of batch number .
21. Preliminary visual inspection of joints after welding .
22. Dimensional check during assembly and after completion of assembly .
23. Perform the in service inspection for tanks, heaters, vessels and pipelines (Visual inspection, thickness measurements, NDT, hydrostatic tests, leak test, vacuum box and painting) .
24. Follow up the inspection required of cranes and lifting gears .
25. Verify material (like Drilling tubes) Using positive Material Identification (PMI) XRF (X-Ray Fluorescence) .
26. Perform inspection of pressure vessels design and standard (ASME Code). 27. Perform inspection plan and supervise the implementation of El-Qara’a & LPG And LTS static equipment’s By RBI according to API 580 & 581 .

Mechanical Department Manager في Belayim petroleum company
  • مصر - المنصورة
  • يوليو 1991 إلى سبتمبر 2000

1 Gas turbines & Gas compressors & Air compressors & Turbo-Expander & Fans & Blowers And Air & Gas
Coolers & Pump & Mechanical seals and vibration condition
2 Perform the required corrective, predictive and preventive maintenance for turbo-compressors
for Nuovo Pignone gas turbines type PGT5, PGT10. Perform the required overhauling and inspection according to the manufacture instructions and specifications for Nouvo Pignone gas turbines. 3 Perform the required corrective, predictive and preventive maintenance for Gas Compressors perform the required overhauling
and inspection according to the manufacture instructions and specifications . 4
Perform the required corrective, predictive and preventive maintenance for air Compressors perform the required overhauling and
inspection according to the manufacture instructions and specifications . 5
Perform the required corrective, predictive and preventive maintenance for Turbo-Expander Perform the required overhauling and inspection according to
the manufacture instructions and specifications . 6 Perform the required corrective, predictive and preventive maintenance for pump perform the required
overhauling and inspection according to the manufacture instructions and specifications . 7 Diagnose & analysis all faults and malfunction trouble shooting and break downs problems
and put the recommended procedures and modification necessary to solve the problems. 8 Manufacture instructions and specifications for all centrifugal and reciprocating (single and
multi-stages) gas compressors
(September 2000 - 2017 present ) * Inspection sector manager, .
Work Summary 1. Perform annual inspection plan and supervise the implementation of El-Qara’a & LPG And
LTS static equipments as (tanks, heaters, heat exchangers, treatment towers, pressure vessel
and separators) .
2. Perform annual inspection plan and supervise the implementation of LPG And LTS rotating equipment’s as. 3. Review corrosion monitoring and cathodic protection system report. 4. Inspect off shore platforms facilities . 5. Review non destructive testes activities including UT & RT. 6. Supervise painting and coating application. 7
. Review material failure analysis studies. 8. Prepare required inspection reporting. 9. Participate in plane daily activity meeting. 10. Review and approve material request for the inspection department.
11. Perform the vibration measurements, analysis and diagnostic for all rotary machines vibration problems and put necessary action to solve problem .13. Inspection piping, piping coating and painting 14. Perform the cathodic protection measurements, analysis and diagnostic for all cathodic
protection systems and put necessary action to solve problem . 15. Inspection oil and water storage tanks . 16. Perform the approval testing of welders .
17. Checking fit up of the joint before start welding operation as per the detailed drawing (root
gap, bevel angle, surface mismatch) .
18. Checking fit up of the joint before start welding operation as per the detailed drawing (root
gap, bevel angle, surface mismatch) .
19. Checking welder facilities and tools needed for welding .
20. Checking electrode type, size & record of batch number .
21. Preliminary visual inspection of joints after welding
22. Dimensional check during assembly and after completion of assembly .
23. Perform the in service inspection for tanks, heaters, vessels and pipelines (Visual inspection, thickness measurements, NDT, hydrostatic tests, leak test, vacuum box and painting) .
24. Follow up the inspection required of cranes and lifting gears .
25. Verify material (like Drilling tubes) Using positive Material Identification (PMI) XRF (X-Ray Fluorescence)
26. Perform inspection of pressure vessels design and standard (ASME Code). 27. Perform inspection plan and supervise the implementation of El-Qara’a & LPG And LTS static equipment’s By RBI according to API 580 & 581 .

الخلفية التعليمية

بكالوريوس, engineering
  • في El-Mansoura university
  • مايو 1987

Specialties & Skills

Painting
Materials
Welding Inspection
Vibration
AUTOCAD
GRAPHIC DESIGN
MICROSOFT WINDOWS 98
OIL PAINTING
PAINTING
REPORTS
WELDING

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

American Welding Society
  • Member
  • November 2011

التدريب و الشهادات

Radiographic Testing (RT Level II) (الشهادة)
تاريخ الدورة:
June 2009
صالحة لغاية:
November 2022
Dye Penetrant Testing (PT Level II) (الشهادة)
تاريخ الدورة:
August 2009
صالحة لغاية:
November 2022
Visual Testing (VT Level II) (الشهادة)
تاريخ الدورة:
November 2009
صالحة لغاية:
November 2022
Vibration Analyzer Master Trend for Windows І & Π + Nspector (Automatic Diagnostics) Course (تدريب)
معهد التدريب:
Natcom Nile Advanced Technology & Comm... Training Center – Cairo – Egypt
تاريخ الدورة:
June 1997
المدة:
60 ساعة
Vibration-Based Predictive Maintenance , Machine Monitoring And Diagnostic Systems Of The Gas Turbin (تدريب)
معهد التدريب:
American Universal – Cairo - Egypt
تاريخ الدورة:
April 1994
المدة:
60 ساعة
Characteristics And Performance Evaluation In The Field Of The Gas Turbines Course (تدريب)
معهد التدريب:
American Universal – Cairo - Egypt
تاريخ الدورة:
November 1993
المدة:
60 ساعة
H Gas Turbine Compressor Set Operation And Routine Maintenance Course (تدريب)
معهد التدريب:
USA of Solar Center
تاريخ الدورة:
May 1992
المدة:
100 ساعة
Centrifugal Compressor Course (تدريب)
معهد التدريب:
Eni – Agip. - Italy of
تاريخ الدورة:
February 1998
المدة:
100 ساعة
Gas Plant and Centrifugal Compressor Course. (تدريب)
معهد التدريب:
Nuovo Pignone – G.E. - Italy
تاريخ الدورة:
February 1998
المدة:
100 ساعة
iesel Engine and Electrical Generator Course. (تدريب)
معهد التدريب:
Nuovo Pignone – G.E. - Italy
تاريخ الدورة:
October 2001
المدة:
60 ساعة
Two Shaft Gas Turbine Course (تدريب)
معهد التدريب:
Nuovo Pignone – G.E. - Italy
تاريخ الدورة:
October 2001
المدة:
60 ساعة
Authorized Pressure Vessels API 510 Course (تدريب)
معهد التدريب:
Cairo Inspection Company
تاريخ الدورة:
April 2014
المدة:
160 ساعة
Authorized Piping Inspector API 570 Course (تدريب)
معهد التدريب:
Cairo Inspection Company
تاريخ الدورة:
January 2013
المدة:
160 ساعة
Risk Based Inspection RBi API 580 & 581 Course (تدريب)
معهد التدريب:
Cairo Inspection Company
تاريخ الدورة:
June 2013
المدة:
150 ساعة
Certified Welding Inspector Course (تدريب)
معهد التدريب:
Cairo Inspection Company
تاريخ الدورة:
July 2011
المدة:
180 ساعة
Machinery Vibration Analysis Category Tow Course (تدريب)
معهد التدريب:
Vibration Institued
تاريخ الدورة:
March 2006
المدة:
50 ساعة
Basic Machinery Vibration - Category Course (تدريب)
معهد التدريب:
Vibration Institued
تاريخ الدورة:
January 2008
المدة:
30 ساعة
Magnetic Testing (MT Level II) (الشهادة)
تاريخ الدورة:
May 2009
صالحة لغاية:
November 2022
Ultrasonic Testing (UT Level II) (الشهادة)
تاريخ الدورة:
January 2010
صالحة لغاية:
November 2022