Managing the well point dewatering department.
Installing the well point system, follow up the system
and solve any problem, follow up all maintenance works
of dewatering machines.
* I carried out general maintenance for all production lines in the factory and created a maintenance file for each line and wrote down everything related to the line from faults, problems or consumption of spare parts in its file.
* I made a comprehensive inventory of the spare parts store and encoded all the parts and recorded all the data in the Excel program, so as to monitor and control the exchange of spare parts and their consumption rates.
* I created a production schedule that includes the order of the weekly production plan for each line to be handed over to the supervisors.
* I reviewed the special formulas for all products and created a database for them within the Ax Dynamics program with the management of production operations from the request of raw materials from the warehouse to the delivery of the final product through the Ax Dynamics program and the work of all the reports associated with it.
* I created a weekly production plan for each production line, taking into account reducing wasted time and increasing the smoothness of work.
* I conducted a periodic evaluation of all employees in the factory and developed training plans for them to improve their efficiency.
* I was part of the team responsible for installing, adjusting and operating 100 new weaving looms and training workers to operate them.
* I worked as a shift engineer for 4 years and won the award for the best shift engineer during the 4 years.
* I worked as a production manager for the factory for 4 years and obtained a certificate of appreciation due to the high production efficiency in the factory while maintaining quality from 90% to 95%.
* I was responsible for the panel foam injection department, then I became responsible for the car trunk assembly department and the installation of refrigerator liners, in addition to the injection department.
* I worked as a production engineer in the factory and then an assistant factory manager after that.
* I worked as a technical officer for the selection of spare parts and their conformity to specifications.
I granted a bachelor's degree in mechanical engineering specialized in Textiles. With knowledge of various other fields such as production, testing and quality.