project manager
Adnoc
Total years of experience :11 years, 6 Months
Experienced project manager with a track record of successfully delivering complex projects aligned with company objectives
Led the feasibility study of a Derivative Park for a leading oil and gas company from cradle to grave. (~7 Billion USD)
Oversaw the study lifecycle, including business case development, tendering, market assessment, licensors engagement, techno-economic assessment, engineering design, HSE requirement, independent project review, project reporting, and presentation of the business case for Top Management Approval
Managed the concept selection, design, and tendering process for the EPC (Engineering, Procurement, and Construction) of a utility plant that included power, water with different quality, waste water, steam, cooling water, flare, and other components. (1 Billion USD)
Engaged and negotiated with EPC bidders, partners, and end-users to ensure successful completion of the project
Ensured interface with tenants and end-users to meet their
specific requirements
Equipped with skills and expertise necessary to manage
complex projects involving multiple stakeholders and ensure their successful completion within budget and timeline constraints
Overall, extensive experience in project management and successful delivery of complex projects makes a valuable asset to any organization.
Working as a Senior Specialist, strategic power planning in gas master planning department, Gas Business Function. Applying leadership experience across all Business line group companies (BLGC’s). Main responsibilities includes:
• Developing and updating ADNOC Group’s Power and water supply Strategy
• Generating ADNOC long term power and water forecast by consolidating all ADNOC group requirement
• Review Captive generation of new project and provide recommendation based on LCOE.
• Review and Coordinate power supply agreement between different Assets ( ADNOC assets).
• Focal point with the power sector (DoE, EWEC, Transco and ADDC) and different power consumers (such as GUP Plant and offshore power project).
• Project status update reports for high management
• Participation in power projects review and techno-economic evaluation
• Working toward Abu Dhabi 2050 strategy
• Carry data analysis and represent the outcome to high management.
• Carry techno-economic evaluation of in-house power generation by calculating fuel consumption, O&M cost and other plant requirement.
• Conferred with scientific, engineering and technical personnel to resolve design and operational issues.
• Reviewed electrical retirement plans by evaluating energy efficiency, economic value, environmental impact and engineering feasibility.
• Provided studies and cost/benefit analysis of solutions and determined appropriate optimization
• Performed data analysis and provided recommendations to achieve cooperate goal
• secure power supply to all project by coordination with Transco and EWEC
• Participating and supporting high management in negotiation, Business development and opportunity evaluation
• Project manager for offshore power project (during feasibility stage)
• Heavily participated in the development of Gas Strategy
• Business development, supporting M&A team is assessing opportunities.
• Power Feasibility studies to find the best and optimum power supply for ADNOC group's
• Represent the company for all power related studies with government such as DSM, Synergies etc.
• Support Gas Master Planning in BCM development.
• Support in developing the gas contract for the power sector and other customers.
Almost same responsibility of Sr. Specialist power planning.
Almost same responsibility of Sr. Specialist power planning.
4 year Experience in oil and gas fields as an electrical maintenance engineer. Carrying preventive, corrective and proactive maintenance. Possess the analytical abilities and technical skills necessary for engineering innovative design and solution. Also have experience in electrical equipment which installed in industrial areas. Gas Turbine Generators, Emergency Diesel Generator, Variable Speed Drive, Transformer, Induction motors, DC Motors, cables, Switchgears, capacitor bank, OHL, MOV’s, ESP, Cathodic Protection, Equipment Protection etc. participating and witnesses FAT/SAT for different equipment.
Including One year experience in EPC phase of a power upgrade project including review of electrical documents, construction activities and coordination as End User Focal point. Below are list of main activities
• Insuring 100% HSE by issuing permit to work (PTW) and carry HSE Risk assessment when necessary/applicable.
• Review technical drawings and electrical systems specifications that comply with company standards.
• Supervise installation and operations and maintenance of electrical equipment to consistently meet rigorous customer requirements.
• Collaborate successfully with cross-functional teams to operate and maintain the production plant.
• Troubleshot electrical equipment problems such as motors, switchgear, cables, VSD's, Transformers, Protection relays, etc.
• Assisted in engineering projects for power system upgrade and represented the end user during the EPC of the project.
• Generated PM schedules and follow vendor recommendation and company procedures.
• Maintained more than 3000 motors and starters and other electrical equipment.
• Oversaw development of two subdivision projects which included inspection of earthworks, underground facilities control, roads crossing, and safety walk-down.
• Ensured safety procedures were enforced in the project, and proactively employed safety measures as needed.
• Involved in the technical resolution of design problems.
• Managed plant shutdown activities and startup activities.
4 year Experience in oil and gas fields as an electrical maintenance engineer. Carrying preventive, corrective and proactive maintenance. Possess the analytical abilities and technical skills necessary for engineering innovative design and solution. Also have experience in electrical equipment which installed in industrial areas. Gas Turbine Generators, Emergency Diesel Generator, Variable Speed Drive, Transformer, Induction motors, DC Motors, cables, Switchgears, capacitor bank, OHL, MOV’s, ESP, Cathodic Protection, Equipment Protection etc. participating and witnesses FAT/SAT for different equipment.
Including One year experience in EPC phase of a power upgrade project including review of electrical documents, construction activities and coordination as End User Focal point. Below are list of main activities
• Insuring 100% HSE by issuing permit to work (PTW) and carry HSE Risk assessment when necessary/applicable.
• Review technical drawings and electrical systems specifications that comply with company standards.
• Supervise installation and operations and maintenance of electrical equipment to consistently meet rigorous customer requirements.
• Collaborate successfully with cross-functional teams to operate and maintain the production plant.
• Troubleshot electrical equipment problems such as motors, switchgear, cables, VSD's, Transformers, Protection relays, etc.
• Assisted in engineering projects for power system upgrade and represented the end user during the EPC of the project.
• Generated PM schedules and follow vendor recommendation and company procedures.
• Maintained more than 3000 motors and starters and other electrical equipment.
• Oversaw development of two subdivision projects which included inspection of earthworks, underground facilities control, roads crossing, and safety walk-down.
• Ensured safety procedures were enforced in the project, and proactively employed safety measures as needed.
• Involved in the technical resolution of design problems.
• Managed plant shutdown activities and startup activities.
Abu Dhabi University (ADU) 2016 - 2018 Master of Project Management from Engineering colleague with a GPA of 4 out of 4 (honor with distinction) below are some of courses I have completed: 1. project management 2. integrated planning 3. supply chain management 4 project cost control 5. project time management 6. Quality Control 7.contracts 8. Human Resource Management (HRM), etc.
Bachelor of Electrical engineering with 3.1 GPA, IEEE, Student Member Senior Design Project: Completed renewable-energy engineering project involving the design of Smart and efficient home with wireless control, Solar tracking system, Batteries Relevant Courses: Power Electronics, Circuit Theory, power flow analysis, Analog Electronics/Circuits, Logic Design, Signals & Systems, Digital control system, Modern Control System.