Total Years of Experience: 21 Years, 10 Months
February 2021
To Present
Senior project manager
at Solid Constriction S.A.E.
Location :
Egypt - Cairo
Working with Solid Constriction S.A.E. in Egypt, since February -2021 up to present.
My recent project with Solid Constriction till present Senior Projects Manager for EMAAR projects as detailed below: -
• PKG, 131, Z5 Building, Construction of Golf Residence & Golf Vistas Buildings, Roads & Infrastructure Works (Z5), Emaar Misr.
o Contacts Admen Mace Egypt for Project Management LLC, Part of the Mace Group.
o RMC the project designer,
o EGEC supervision consultant
• PKG. 125R, Uptown Cairo Mosque, Emaar Misr.
o Contacts Admen Mace Egypt for Project Management LLC, Part of the Mace Group.
o AL ESTWSHAREYOON - Zuhair Fayez Partnership, the project designer,
o EGEC. supervision consultant
• PKG#165 Design and Build of Golf Plaza, Uptown Cairo, Emaar Misr- The project constitutes a commercial complex consisting of a group of banks, restaurants, coffee shops, a supermarket and a clinic with all related works.
o Contacts Admen Mace Egypt for Project Management LLC, Part of the Mace Group.
o AL ESTWSHAREYOON - Zuhair Fayez Partnership. supervision consultant
My recent project with Solid Constriction till present Senior Projects Manager for EMAAR projects as detailed below: -
• PKG, 131, Z5 Building, Construction of Golf Residence & Golf Vistas Buildings, Roads & Infrastructure Works (Z5), Emaar Misr.
o Contacts Admen Mace Egypt for Project Management LLC, Part of the Mace Group.
o RMC the project designer,
o EGEC supervision consultant
• PKG. 125R, Uptown Cairo Mosque, Emaar Misr.
o Contacts Admen Mace Egypt for Project Management LLC, Part of the Mace Group.
o AL ESTWSHAREYOON - Zuhair Fayez Partnership, the project designer,
o EGEC. supervision consultant
• PKG#165 Design and Build of Golf Plaza, Uptown Cairo, Emaar Misr- The project constitutes a commercial complex consisting of a group of banks, restaurants, coffee shops, a supermarket and a clinic with all related works.
o Contacts Admen Mace Egypt for Project Management LLC, Part of the Mace Group.
o AL ESTWSHAREYOON - Zuhair Fayez Partnership. supervision consultant
June 2015
To February 2021
Construction Project Manager
at El Gharably Engineering Co.
Location :
Egypt - Cairo
• Working with El Gharably Engineering Co. inWorking with Gharably Integrated Engineering Company in Egypt, since Jun -2015 up to February- 2021(Excluding 4 months in C.C.C.)
Employment history from most recent to oldest
• My recent project with GIECO tell present Project Manager for Ministries, Cabinet & Parliament Building - Governmental District at New Capital - Building on Plots 19B - 20B from 2020 till February- 2021.
• Project Manager for the new Ministry of Defense building called Kaian Project from March 2016 up to 2020
• Project Manager for Tow U-turn bridges located on Cairo- Ismailia Desert and one pedestrian bridge the project name El Asher Bridges. From Decampere 2015, up to November 2016
The general roll and responsibility on this position is simply to start the project from scratch up to the handing over including planning executing and coordinating.
• Project manager for El Qantara bridges Sinai from August 2015 up to Decampere 2015
Employment history from most recent to oldest
• My recent project with GIECO tell present Project Manager for Ministries, Cabinet & Parliament Building - Governmental District at New Capital - Building on Plots 19B - 20B from 2020 till February- 2021.
• Project Manager for the new Ministry of Defense building called Kaian Project from March 2016 up to 2020
• Project Manager for Tow U-turn bridges located on Cairo- Ismailia Desert and one pedestrian bridge the project name El Asher Bridges. From Decampere 2015, up to November 2016
The general roll and responsibility on this position is simply to start the project from scratch up to the handing over including planning executing and coordinating.
• Project manager for El Qantara bridges Sinai from August 2015 up to Decampere 2015
February 2015
To June 2015
Site Manager(PMP)
at Al Jaber Trading & Contracting Co. W.l.l.
Location :
Qatar - Doha
- Overall management of project from conception to completion.
- Ensure all operations are undertaken in safe manner in accordance with Qatar law and project/company H&s policy.
- Management of project team functions.
- Supervision and co-ordination of multiple contractors.
- Control and direction of a multi-disciplinary, multi-national workforce.
- Review project program and update on a regular basis.
- Review and agree project measurement, cost assessment and monthly valuations.
- Preparation of weekly and monthly report to the client and senior management.
- Possessed a good background on FIDIC contract and participated in arbitration before
- Ensure all operations are undertaken in safe manner in accordance with Qatar law and project/company H&s policy.
- Management of project team functions.
- Supervision and co-ordination of multiple contractors.
- Control and direction of a multi-disciplinary, multi-national workforce.
- Review project program and update on a regular basis.
- Review and agree project measurement, cost assessment and monthly valuations.
- Preparation of weekly and monthly report to the client and senior management.
- Possessed a good background on FIDIC contract and participated in arbitration before
November 2012
To January 2015
construction manager/ package manager
at Al Jaber Trading & Contracting Co. W.l.l
Location :
Qatar - Doha
Designation in that project: Package Manager for Package 2A&2B from 1st November 2012 up to 31Junuary 2015 Brief for my field experience and associated duties in this position.
applying a technical analyses for the project drawing and associated document prior to start execution
Determine the appropriate way for the work based on the analysis result and technical background
Identify the technical problem resulted from the technical analysis
Review all the associated stander for the planed work to elicit the mandatory and recommended technical issues to comply with it and consider it throughout the execution.
Calculate and computer rough magnitude estimate for the resource required for the execution and place order.
Creating a technical method of statement for the specific activity required special technical treatment (for instance dewatering system).
Housing project belong to QATAR PETROLEUM large scale project, constructing building and villas from excavation stage up to handing over to the Clint include civil, structural and finishing work
applying a technical analyses for the project drawing and associated document prior to start execution
Determine the appropriate way for the work based on the analysis result and technical background
Identify the technical problem resulted from the technical analysis
Review all the associated stander for the planed work to elicit the mandatory and recommended technical issues to comply with it and consider it throughout the execution.
Calculate and computer rough magnitude estimate for the resource required for the execution and place order.
Creating a technical method of statement for the specific activity required special technical treatment (for instance dewatering system).
Housing project belong to QATAR PETROLEUM large scale project, constructing building and villas from excavation stage up to handing over to the Clint include civil, structural and finishing work
February 2011
To October 2012
Project Engineer
at Al Jaber Trading & Contracting Co. W.l.l.
Location :
Qatar - Doha
Designation in that project: Project Engineer from 1st February 2011up to 31 October 2012 Brief for my field experience and associated duties in this position.
Field experience
Construct 2numbers of pump station medium size from the excavation stage up to testing commissioning stage
Good experience in the civil work infrastructure work (sewer line, rising main, potable water, TSE line, soak-away different types, asphalt work kerbston paving and landscape.
Dealing with underground utility Ht and Lt cables reroute and demolition
External work infrastructure and civil work along the project front and rear faces with approximately 16 kilometer length
Associated duties
Applying a technical analysis for the project document as in all and particularly for the piling design to stand by the design criteria and methodology for design for the pile design
Coordinate with the authority fulfill them requirement and discus the criteria and methodology for the pile design to obtain approval prior to get permit to work for each activity on the scope.
Establish the site setting up facilitate the mobilization.
Create Plane for the work execution documenting all the associated steps and documentation required to execute it.
Apply decomposition analysis for the scope to determine the required resource and estimate the cost and time to execute the work and place order for the requirement as a result from the analysis
Applying a technical review to the soil investigation to determine the appropriate way for drilling considering the existing assets and site condition and prepare the required method of statement and any associated document.
Field experience
Construct 2numbers of pump station medium size from the excavation stage up to testing commissioning stage
Good experience in the civil work infrastructure work (sewer line, rising main, potable water, TSE line, soak-away different types, asphalt work kerbston paving and landscape.
Dealing with underground utility Ht and Lt cables reroute and demolition
External work infrastructure and civil work along the project front and rear faces with approximately 16 kilometer length
Associated duties
Applying a technical analysis for the project document as in all and particularly for the piling design to stand by the design criteria and methodology for design for the pile design
Coordinate with the authority fulfill them requirement and discus the criteria and methodology for the pile design to obtain approval prior to get permit to work for each activity on the scope.
Establish the site setting up facilitate the mobilization.
Create Plane for the work execution documenting all the associated steps and documentation required to execute it.
Apply decomposition analysis for the scope to determine the required resource and estimate the cost and time to execute the work and place order for the requirement as a result from the analysis
Applying a technical review to the soil investigation to determine the appropriate way for drilling considering the existing assets and site condition and prepare the required method of statement and any associated document.
July 2007
To February 2011
project manager for enabling work
at National Emirates Piling Work-Lootah Group
Location :
United Arab Emirates - Dubai
Brief for my field experience
Good experience in the shoring work (secant pile, contiguous pile, solder I beam and sheet pile), in different type of soil and different depth till 3 basements.
Good experience in the foundation pile diameters between 600mm to 1500mm with different depth till 45m in different type of soil, aside from that I have a good experience in the pile test (static load test, dynamic, integrity, sonic cur test and caliper logging test).
Manage in this career more than 45 project in Dubai, Abu Dhabi and Sharja with different scope (shoring, piling and solder I beam)
Associated duties
Review the piling design and the design criteria prior to submitted to authority for final approval
Study the nature of work, determine the construction method and produce method statement for several types of works.
Coordinate with the authority fulfil them requirement and respond to all technical clarification related to design and execution till obtain permit for each activity prior to start.
Plane for the work execution based on the technical requirements and site condition and estimate the required recourses based on the plan.
Analysis the technical document and the site condition to creating a technical method of statement to define the most appropriate way for drilling to suit the machine capacity and the existing soil strata.
Organizes the manpower and the available resources to achieve the work according with the work plan
Good experience in the shoring work (secant pile, contiguous pile, solder I beam and sheet pile), in different type of soil and different depth till 3 basements.
Good experience in the foundation pile diameters between 600mm to 1500mm with different depth till 45m in different type of soil, aside from that I have a good experience in the pile test (static load test, dynamic, integrity, sonic cur test and caliper logging test).
Manage in this career more than 45 project in Dubai, Abu Dhabi and Sharja with different scope (shoring, piling and solder I beam)
Associated duties
Review the piling design and the design criteria prior to submitted to authority for final approval
Study the nature of work, determine the construction method and produce method statement for several types of works.
Coordinate with the authority fulfil them requirement and respond to all technical clarification related to design and execution till obtain permit for each activity prior to start.
Plane for the work execution based on the technical requirements and site condition and estimate the required recourses based on the plan.
Analysis the technical document and the site condition to creating a technical method of statement to define the most appropriate way for drilling to suit the machine capacity and the existing soil strata.
Organizes the manpower and the available resources to achieve the work according with the work plan
March 2007
To July 2007
Site Engineer
at Almont sir Contractor
Location :
United Arab Emirates - Sharjah
in piling and deep foundation scope
December 2005
To March 2007
supervision engineer
at The Egyptian Army crops of engineer
Location :
Egypt - Cairo
Supervision the main contractor and inspect the different activity and elements of the project
Insure the quality control for all the activity.
Project technical issues In brief supervision the contractors in the projects which it soldier’s camps and tank’s shades.
Insure the quality control for all the activity.
Project technical issues In brief supervision the contractors in the projects which it soldier’s camps and tank’s shades.
May 2004
To November 2005
Site Engineer
at Tarik Trading and contracting
Location :
Egypt - Alexandria
Share on Facebook
Share on Twitter
Share Via Email