Mohamed Elkharashy, Production Planning Engineer

Mohamed Elkharashy

Production Planning Engineer

Amiantit

Location
Egypt
Education
Bachelor's degree, Production engineering
Experience
18 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 8 Months

Production Planning Engineer at Amiantit
  • Saudi Arabia - Dammam
  • My current job since May 2015

• Heading the planning team for GRE division Bondstrand® and Amipox (Amiantit’s group of companies).
• Oversaw the entire plants and provided recommendations to increase machine utilization.
• Established a planning scheme which allows manufacturing scheduling based on capacity and available resources.
• Enhanced Master Production Schedule for all manufacturing units
• Developed and implemented advanced spreadsheets models to enhance the production planning process and projects tracking.
• Conducted a training session for Amipox staff on “Applying Risk Management in GRE industry in accordance with API Standards” and participated in establishing risk management procedures in accordance with APl standards

Planning Engineer at Composite Pipes Industry LLC, Oman
  • Oman - Sohar
  • January 2012 to February 2015

Job Duties:
• Performing planning and scheduling activities for many large projects covering all domains (Initiating, Planning, Execution, Monitoring and Controlling, and Closing.
• Maintaining the Master production Schedule for produced items for running projects considering projects’ constrains, plant capacity and clients’ priorities.
• Resource allocation required for production, testing and transportation activities.
• Material requirements planning for raw material respecting awarded and forecasted orders.
• Initiating periodical progress reports for all individual projects.

Key Achievements:
• Successfully achieved planning and scheduling for many projects in all stages (Raw material qualifications, manufacturing, delivery and installation).
• Developed advanced and concise rules for estimating the process timing of pipes and fittings based on product parameters, machine parameters, and available resources, which help to facilitate the schedules creation and determine the time required for the completion of projects.
• Conducted a comprehensive study "Using PMP Initiatives to Enhance Organizational Performance”, aiming to the practical implementation of project management processes covering PMI's knowledge areas in all project process groups to enhance company's performance.

Maintenance H.O.D at Composite Pipes Industry LLC, Oman
  • Oman
  • July 2008 to December 2011

Job Duties:
• Maintaining preventive maintenance program as per machines criticality
• Developing detailed monthly maintenance reports based on maintenance records, including statistical analysis for preventive maintenance, breakdown maintenance and consumed spare parts.
• Illustrating good arbitrary and worthy forms that help providing an organized method of collecting and recording information for current analysis and future work, in addition to forms that are procedural in nature help technicians remember tasks steps, also data gathering forms to help gathering information, e.g. work order, crew work hours availability forecast, advance schedule worksheet, equipment history data sheet, parts information sheet.
• Controlling and monitoring the maintenance spare parts requirements based on the expected consumption and lead time, in order to avoid shortage as well as to keep the optimum stock.
• Scheduling and following-up for fabrication projects for in-house made machines and machine modifications.

Key Achievements:
• Introduced a preventive maintenance scheme based on machines criticality and production schedule, including periodic plans, maintenance checklists and spare parts management
• Illustrated good arbitrary and worthy forms that help providing an organized method of collecting and recording information for current analysis and future work, in addition to forms that are procedural in nature help technicians remember tasks steps, also data gathering forms to help gathering information, e.g. work order, crew work hours availability forecast, advance schedule worksheet, equipment history data sheet, parts information sheet.
• Managed many fabrication projects, which led to capacity increase, layout improvement and material handling enhancement.
- Installation of a fittings hydrotest machine DN50 -DN600 mm
- Upgrading two pipe production lines from single winder to double winder
- Upgrading a production line from 9 m to 12 m

Maintenance Planning Engineer at Alexandria Petroleum Maintenance Company
  • Egypt - Alexandria
  • October 2007 to June 2008

•Performing statistical analysis for maintenance activities, including performance indicators and their evaluations, using MS-Excel ®
•Generating fully detailed maintenance reports on weekly and monthly basis and submit them to MIDOM management.
•Creating of maintenance work orders using CMMS package (PEMAC).
•Planning and scheduling of shutdown activities using MS-Project.
•Attending meetings, and following up the maintenance activities.

Production Planning Engineer at Arab Cables Co. ,ELSEWEDY CABLES.
  • Egypt
  • July 2006 to October 2007

•Informing the sales department of the planned delivery time of order prior to acceptance and the time needed to produce the product.
•Producing a machine loading program for factory based upon production orders received from the sales department.
•Checking the progress of orders and the manufacturing processes,
•Modified the production plans for efficient use of the factory.
•Providing data to the production departments as needed.
•Notifying the purchasing department of the need for raw materials needed.
•Modified the MRP system to develop bill of material for individual work orders, as well as aggregate row materials needed.

Project Planning Engineer at Egyptian Transport & Commercial Services Co. (EGYTRANS)
  • Egypt - Alexandria
  • June 2005 to July 2006

•Training at the project of Cairo North Power Station.
•Performing route survey studies to determine the optimum transportation routes and methods to overcome any existing obstacles.
•Preparing transport arrangement drawings.
•Preparing reports include logistical studies and transportation engineering planning and design.
•Determination of the equipment and procedures required to transport cargo from the vessel to the final project delivery site.
•Supervision of the entire transport operation beginning with the offloading of heavy lifts onto hydraulic trailers and ending with the delivery and installation of the transported units on their foundations.

Education

Bachelor's degree, Production engineering
  • at Faculty of Engineering , Alexandria University.
  • July 2004

•Specialized in Industrial Engineering, Production Planning and Control, Engineering Economy, and Project Management. •Senior Project in “Computer Simulation Modeling and Analysis of Inventory System with Lost Sales and Backorders”.

Specialties & Skills

Project Management
Production Planning
Microsoft Excel
Scheduling
MS Excel (MOS Certified)
VBA for Excel
MS Word
SolidWorks
PowerPoint
MS Project
AutoCAD
Primavera P6

Languages

Arabic
Expert
English
Expert

Memberships

Project Management Institute
  • Member
  • March 2014

Training and Certifications

PMI-Scheduling Professional (Certificate)
Date Attended:
March 2015
Valid Until:
March 2021
Microsoft Office Specialist (MOS) Expert (Certificate)
Date Attended:
August 2007
Valid Until:
January 9999
Scrum Fundamentals Certified (SFC) (Certificate)
Date Attended:
September 2014
Valid Until:
January 9999
Six Sigma Green Belt Professional (Certificate)
Date Attended:
October 2014
Valid Until:
January 9999
Project Management Professional (Certificate)
Date Attended:
June 2014
Valid Until:
January 2020
Occupational Health and Safety Training Program (Certificate)
Date Attended:
November 2008
Valid Until:
November 2008
API 15 HR & API 15 LR Monogram , Internal Auditor (Certificate)
Date Attended:
December 2011
Valid Until:
December 2011

Hobbies

  • Reading
  • Gardening