West Damietta Power Plant
This Plant is based on an EPC Contract for design and construction of a Simple Cycle Power Plant of 500 MW with
dual fuel. The project duration was 7 months including: Engineering Design Phase, Design Approval and Construction.
Therefore this project is considered a Fast Track Project. Engineering Design activities include: Geotechnical study,
Structural & Electrical & Mechanical designs, and 3D modelling, instrumentation, and control activities.
Leading Multidiscipline team (Geotechnical, Structure, Electrical, Mechanical, PDMS, Instrumentation and
control) to deliver the design and construction engineering packages for west Damietta EPC power plant.
Directing Design and Construction phase engineering activities for an EPC simple cycle power plant 500 MW.
Directing development of all engineering outputs (conceptual design, detailed design, construction drawing,
BOQs).
Providing Procurement Support activities and developing Value Engineering (VE) Proposal(s).
Improve Design Engineering Department capabilities by continues hiring and cross training.
Mohamed Gayar, PMP
EPC Corporate Engineering Manager
4
Control the flow of work to adhere to KN procedures and manual of operation.
Develop and updating engineering design schedule and engineering department budget.
Liaise with Client for solving any technical issues.
Develop design work priorities to meet construction priorities as to meet needs in a Fast Track Project.
Consult with KN’s Contracts Department to highlight any technical additional design requirement that is not
part of the contracted scope of work and/or may be outside the boundary of the project site(s).
Manage integration between Vendor engineering, civil design and MEP design.
Manage addressing all technical quires coming from site(s).
Participated in restructure the engineering department to match the EPC projects.
Supervise special engineering deliverables for the power plants as 3-D modeling, Isometric drawings, process
flow Diagrams, short circuit study, load flow, grounding Calculation, motor starting analysis, and Duct bank heat
rise calculation.
Reporting about Project Engineering and Procurement Status to Operations Manager.
Supervising the closing of any design open documents either done in-house or at external Vendor/consultant.
Managing Produced site document/feedback regarding design discrepancies and apply needed corrective
action.
Manage interface point with the vendor engineering and integrated design process.
SHABABA & DAMIETTE Power Plants (1500 MW)
Leading the final phases of the two emergency power plans for 2010 summer, the plants are consisting of 12 GE frame 9E
Turbines, the scope include design management and coordination between OEM, PGESCo, Civil consultant, MEICA design
, Geotechnical Consultant and in-house MEP In-house site utilities Engineering .
Leading the close out engineering activities including As Built, Final approval of the design deliverables and final engineering
Documentations.
Central Utility plant at Kuwait University
The project is three district cooling plant with a total capacity (72000) TR, the project is the central utility plant which serves
the new Kuwait University, the scope of the project comprise the three District cooling plants, each of them include 12
cooling systems, four ancillary Buildings, three substations and E/M works for the service tunnels
Service Tunnel coordination sections.
Disciplines layouts/sections for the service tunnel.
Lighting level check.
Substation equipment layouts.
Cabling Route/schedule.
Service Tunnel interface points coordination.
Marrassi Infrastructure Project (Emaar)
340 Million EGP Infrastructure Project Located at North Coast/Egypt. The scope include Roads, Eight Electrical
Substations, two Lifting stations, Water supply Pumping station, Wastewater Facility, Storm Control, Irrigation,
Landscaping, Fire Fighting, MV Cables, LV cables and Telecommunication networks covering ring main networks and
house connections .
Manage Development of the schedules for designs, shop drawings and submittal of materials for the project
elements.
Direct the design of coordination sections and Network layouts.