Production Manager
BIN DUBAIS READYMIX CONCRETE
Total years of experience :25 years, 3 Months
Production and logistics.
Plan, manage and supervises.
- The establishment of the company batch plant from the design phase to production phase.
-Production manager will to lead manufacturing operations with the objective of ensuring manufacturing excellence
- and define and cascade manufacturing unit metrics in line with company's business strategy
- Define budgets and cost structure for manufacturing unit, working capital, cash flows and product mix.
-Define and achieve financial metrics of profitability, productivity, cost optimization and capacity utilization
-Initialed and implement best practices angularity management and plant management. Create, define, oversee various committees and work group to enhance teamwork and coordination, Approve departmental budgets, plans, resource requirements and broad roles.
Redy Mix Concrete company
Makkah aria manager for three redy mix concrete factoryes
Planning.manager and supervises the following.
The establishment of the company batch plant from the design phase to the production phase.
Regular and the periodical maintenance programs of the electrical and Mechanical Equipments
The negotiations and the closing of the deals with the different suppliers
Provide immediate support and technical advice to manage emergency cases.
Production & Maintenance and Logistics .
Plan, manage and supervises the following:
- The establishment of the company batch plants from the design phase to the production phase.
- Batch plants shutdowns and start-up.
- Mobilization of the equipment from/to the different sites.
- Regular and the periodical maintenance programs of the plants equipment, and vehicles as per the set standard.
- The maintenance of the mechanical and hydraulic activities and tasks including history and performance.
- The negotiation and the closing of the deals with the different suppliers providing equipment vehicles and spare parts covering the maintenance requirements .
- Provide immediate support and technical advice to manage emergency cases including manpower and equipment reaction.
- Plan for the regular assessment of maintenance and installation resources and logistics requirements.
June 2009 to Present: Maintenance & Installation Manager
Square Integrated Building Industries SIBIC
http://www.sibic.net
SIBIC is company specialized in ready mix concrete manufacturing as well as providing experience through its engineers to other companies working in the construction, concrete or asphalt field concerning erection or maintenance of batch plant, asphalt plants, low voltage (380, 200 V) control panels, site mobilization & electrical supplies.
I work at SIBIC as a maintenance & installation manager responsible of: Installation & maintenance of batch plats, loaders, pumps, trucks, truck mixers, generators, chillers & electrical installations.
Equipment Types.
1- Concrete Batch Plant NFLG HZS150 (china).
2- Concrete Pumps PUTZMEISTER Mobil 38, 46m & Stationery 1409D (German).
3- Wheel Loader XCMG ZL50 (China).
4- Truck Mixer SINOTRUK 9m3 (China).
5- Generator & Aggregate Screen & Chiller.
1- Certificate Green Construction from German-Arab Chamber of Industry and Commerce. 2011
2- Certificate of Completion in Strategic Human Resources and 10 steps To Successful Project Management from American Chamber of Commerce in Egypt. 2009.
3- Certificate in Control By Contactors from SALESIAN INSTITUTE (DON BOSCO).2001.
Ready Mix Egypt by Orasco & Lafarge are industrial and construction
I participated in the following projects : Helwan el semad factory roject at 2005.
Sharm El sheikh air port. & El Katamya Genza and Madinaty resorts 2006-2007.
Abou Rawash Sun City, Smart Village and Tropy al Sokhna 2007-2008.
Alexandrai Sidi Krer Power Station, Borg el Arab international air Port, Sugar Factory, Eaamar Resort.
Managing People :
- Follow-up on the installation and the Maintenance team in terms of quality, quantity, and discipline.
- Provide his inputs in the process of employees' recruitment, training and development, performance evaluation and promotion as related to his team and direct reports.
EQUIPMENT TYPE.
1- Concrete Batch Plants.(ELBA & LIEBHERR & JHONSON ).
2- Concrete Pumps 42& 46 m (SCHWING & ELBA ). German
3- Wheel Loader ( CATERPILLAR- HITACHI- JONDAR ).
4- Generators VOLVO & Aggregate screen & Chiller L&T.
- March 2005 to June 2009: Area Plant manager
Ready Mix Egypt by ORASCOM & LAFARGE
www.lafarge.com.
www.orascom.com
Ready Mix Egypt & LAFARGE are industrial company specialized in road concrete and production.
I participated in the following projects: Helwan el semad factory project.
Sharm El sheikh air port.
El Katamya Genza, Palm hills & Madinaty resorts.
Abou Rawash Sun city, smart village.
Suez al ain al shokhna port, tropy al sokhna & other projects.
Alexandrai Sidi krer power staion, borg el arab international air port, sugar factory, Eaamar resort.
Responcible of production of all types of concrete such as: - Mass concrete.
- High durability concrete.
- Abrasion resistance concrete.
- High early strength concrete.
- Self compacting concrete.
Also the maintenance of different types of equipments such as: - Batch plants KABAG, ELBA, URO, LEBHEIR & JHONSON.
- Concrete pumps Putzmeistr, Shwing, CIFA.
Jan 1999 to March 2003: Technical maintenance Engineer
- I.D.P Company for Commercial Agency for POTAN (French) Tower Cranes,
- ALEMAK (Swedish) Elevators.
- KABAG (German) Concrete Patch planets.
- PUTZMASTER (German) concrete pumps.
- POTAN (France) Tower Crane.
Duties: - Responsible of maintenance & erection of all equipments & after sales service.
- Professional Knowledge analogue and digital and mixed circuts.
- Monitoring and controlling of the production from control room.
- Professional in diesel units for (generated - wielding- pumping)
I D P Company for Commercial Agency for .
- POTAN (French) Tower Cranes.
- KABAG (German) Batch Plant.
- PUTZMASTER (German) Concrete Pumps.
- ALEMAK (Swedish ) Elevators.
Duties:
- Responsible of maintenance & erection of all eguipments & after sales service.
May 2000: Awarded a BSe in Electric Machine and Power Engineering Helwan University Helwan. Egypt Subject studied included: Fundamentals of Electrical of Engineering, Electrical Machines, Electric Power Systems, High Voltage Engineering, Power Electronics, Protection& Switchgear Engineering, Electrical Measurements& Testing and Control of Power Systems. Graduation Project: Planning & Lighting of an industrial establishment and improve power factor. Award: GOOD.