Technical Office Team Leader at Gama Construction
  • Egypt - Cairo
  • My current job since January 2018

- PROJECT: The Construction of 10 th of Ramadan City 200 Bed Hospital
- CLIENT:10 th of Ramadan City Development Authority
- Consultant: Gira Consult

Technical Office Team Leader at Bindayel Contracting EST
  • Saudi Arabia - Riyadh
  • October 2014 to December 2018

- Project: King Abdullah Ben Abd Al Aziz Development of Security Centers (KAP-01)
- CLIENT: Ministry of Interior
- Consultant: Khatib & Alami
- Projects:
 Technical College for Tourism & Hotels Management (Jeddah).
 Technical College for Advanced Technology (Riyadh).
 Technical Institute for Dairy Technologies (Riyadh).
 Technical Institute for Water Technology (Jeddah).
 Housing for Technical Institute of Plastic Technology (Riyadh).
 Technical College for Tourism & Hotels Management (Makkah).
CLIENT: Technical & Vocational Training Corporation (TVTC).
Responsibilities as a Technical Office Team Leader:
To Follow up my Team and to perform the below Tasks:
1- Projects Mechanical Works Planning using Primavera P6 Software
2- To Calculate the Fans and Air Handling Units Static Pressure using Elite Software,
Chilled Water Pumps and Cooling Tower Pumps Flow and Head and Chilled Water
Network Sizing According to Carrier Handbook.
3- To verify the Firefighting Pumps Head & Flow Calculations According to NFPA (13 & 14)
Standard, Using Elite Software.
4- To Verify the Domestic Water Pumps, Irrigation Pumps & Sewage Lifting Stations Head
& Flow Calculations According to Uniform Plumbing Code, International Plumbing Code
& ASPE Code.
5- To Verify the Central Water Heaters, Hot Water Circulations Pumps, Domestic Water
System Sizing Calculations According to Ashrae, Uniform Plumbing Code, International
Plumbing Code & ASPE Code.
6- To make and revise the HVAC Duct Works, Chilled Water Piping System Firefighting
System, Compressed Air Piping System, Steam Piping System & Plumbing Shop
Drawing.
7- To Follow up the Mechanical Procurement Process Starting from Sending the
Price Inquiries to the Suppliers, Making the Technical and Financial
Appraisals between the Different Manufacturers and Suppliers and to prepare
and revise the Material Submittals to ensure that it conform with The Project`s
Specifications and to follow up the approvals with the Consultant and Client,
Including Purchasing of Booster Pumps, Firefighting Pumps, HVAC
Equipment, .Reverse Osmosis Water Treatment Systems (RO), Plumbing and
Firefighting Equipment and Accessories.
8- Projects Tendering & Pricing

site engineer at Orascom Construction Limited - Other locations
  • Egypt - Cairo
  • June 2014 to October 2014

- PROJECT: Mall of Egypt
- CLIENT: Majid Al Futtaim Properties Egypt
- MEP CONSULTANT: Shaker Consultancy Group

Senior Site Engineer at Watania for Trading & Contracting
  • Egypt - Cairo
  • November 2012 to June 2014

- PROJECT: Chipsy Plant Phase 2 & Phase 3 at AL-Obour City, Egypt.
- CLIENT: Chipsy Food Industries.
- CONSULTANT: Egyptian Engineering Consultant Co (INFRA Group)

site engineer at Techno Cold for MEP Services
  • Qatar - Doha
  • September 2010 to November 2012

- PROJECT: SHK. Thani Bin Abduallah Al Thani3 Palaces At Al Gharafa.
- CLIENT: SHK. Thani Bin ABDULLAH Al Thani.
- CONSULTANT: DRA Engineering Consultants.
- PROJECT: Mazaya Residential Compound 72 villa & Club House.
- CLIENT: Mazaya Qatar Real Estate Development.
Responsibilities as a Site Engineer:
1- Perform a technical, organizational and supervisory role on the Project
2- The installation of Firefighting Sprinkler network and Firefighting Pump Room Equipment
3- The installation of Chilled Water Piping Network, Water Cooled and Air Cooled Chiller Plant
Equipment.
4- The installation of Water Supply Piping (PPR, Cpvc, HDPE Pipes), Drainage Piping (UPVC,
Clay Pipes), Main Site Water and Drainage Network, Water and Waste Water Pumping and
Treatment Stations.
5- The installation of Air Handling Units, Fan Coil Units, DX Split Ducted Units and Package
Units
6- The installation of Compressed air System Complete with (Rotary Screw, Oil Free, Air
Cooled Air Compressor), air receiver, Air dryer and Compressed air Pipe Line
7- The preparation of monthly invoice, Project Materials Take Off and Progress Daily Report

Education

Bachelor's degree, Mechanical Power Engineering
  • at Alexandria University
  • June 2010

GRADUATION PROJECT: “Design of an automated parking system” Complete design of an elevator parking system contains an elevator system, horizontal motion and turn table system. Supervised by:Prof. Dr. Wael A. crosby Grade: Excellent.

Specialties & Skills

Technical Office Engineering
Engineering
Installation
AUTOCAD
CAR DRIVER
COMMUNICATION SKILLS
CONSULTING
CUSTOMER RELATIONS
MECHANICAL

Languages

Arabic
Native Speaker
English
Intermediate