محمد Hosany, Senior Project Architect

محمد Hosany

Senior Project Architect

SSH International

البلد
قطر
التعليم
ماجستير,
الخبرات
15 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 5 أشهر

Senior Project Architect في SSH International
  • الجزائر
  • إلى ديسمبر 2014
Leader في BIM Lead
  • أغسطس 2011 إلى نوفمبر 2014

at the UK Office.
Stantec global Data Lead and on BIM expertise framework
BIM manager on Welsh Healthcare framework including Moriston Hospital -
a Pathfinding project.

Associate. CodeBook/ Revit Specialist في HOK
  • قطر
  • أكتوبر 2004 إلى أغسطس 2011

I have been principally involved with the development of management
application tools to manage the vast amounts of data associated with
Healthcare and other building types including commercial, aviation, education
and residential.

Database Manager/ Medical Planning Support في Anshen Dyer
  • المملكة المتحدة
  • أغسطس 2002 إلى أكتوبر 2004
RDS (Room Data Sheet) Specialist في Devereux Architects, Ltd
  • أبريل 2000 إلى أغسطس 2002

Duties:
Projects:
Worked on a number of PFI projects

في Vanbrugh Health Centre
  • يوليو 1998 إلى سبتمبر 1998

Looked at various design options to increase the usage and maximise
building use.

Architect Assistant في Reshamwalla Associates
  • المملكة المتحدة
  • فبراير 1997 إلى يوليو 1997
Architect
  • إلى

I have worked on several Healthcare PFI projects since being fully qualified as an

Design Coordinator, BID Manager, BIM Manager
  • إلى

Design Coordinator and BIM Manager on Dental and Dermatology Clinic
(Ashghal/ HMC). BID Manager on a small 1 year Proposal - HBN
Specification for Contractors
Selected to be Design Coordinator on Dental and Dermatology, relocated
from Kuwait to Qatar.
Specialist Centre for Dentistry, Dermatology, Diabetes Services

Design Coordinator
  • إلى

Design coordination between all disciplines and sub-contractors to meet
deadlines. Also local BIM Manager.
Al Wakarah Shopping Mall (South Mall

Project Manager في Stantec
  • المملكة المتحدة
  • إلى

Client coordination, weekly meetings and design coordination.

BIM manager في King Faisal Paediatric Tertiary Hospital
  • المملكة المتحدة
  • إلى
BIM manager في NCCCR Hospital
  • المملكة المتحدة
  • إلى
BIM manager في King Faisal Hospital
  • المملكة المتحدة
  • إلى

Provided CodeBook Training on international basis throughout the company
including following offices - Vancouver, San Francisco, Calgary and Toronto.
Developed a Room Datasheet and database tool/ strategy primarily for Stantec
Healthcare Projects.
Developed a Revit Healthcare Library which includes over 1400 components
(Revit Families). This was outsourced and produced by Atlas Industries.
Travelled to the India Office to help coordinate the Architectural BIM Model on

BIM Manager في King Faisal Paediatric Tertiary Hospital
  • إلى

Coordinate the Architectural Revit model with the India Architectural Team
and the Dubai Engineering Team. Project is at Design Development Stage.

BIM Manager في KHPCC
  • إلى

Coordinate the internal model with LOR and ARUP. The shell developed by
RSHP, coordinate the Revit model their Bentley Model
This project is recognised as Stantec first true BIM Revit project with article in
the Stantec BIMImpact newsletter. Project is at Stage F.

BIM Manager في Canadian Chancery Refurbishment Projec
  • المملكة المتحدة
  • إلى

Set Up and Coordinate the existing Canadian Embassy Project in Revit
including existing and proposed works. Project based in Trafalgar Square is
a prestigious building and icon to Central London.

BIM Manager في Moriston Hospital
  • إلى

Coordinate the Revit model including constructing the building from Point
Cloud Survey Information
Project is at Stage D.

BIM Manager في NCCCR
  • إلى
Associate LEED GA
  • إلى

CodeBook User of Year 2010
BIM HOK Test: 93%
Support Medical Planners with Key Database; Work Smart on Automated
Processes and Library Data. Also work on Revit contents and Room Data
Sheet Specialist on Healthcare, Justice and S&T Projects
Trained as Revit Specialist and qualified with Certificate at Excitech-
specialise in Content Development (October 2007)

Architect في Sir Francis Crick Centre
  • إلى
Revit Information Coordinator في BIM suppor
  • إلى

Codebook
1:50 Room Loading and generation of RDS. Support for Lab planners.

Revit Data Manager
  • إلى

Developed Room Data Sheets from Revit using the ODBC mechanism. Also
used schedule keys as Room Types to allow Data to be managed globally.
Room Data for 570 rooms was setup within a week using Revit Schedule
Keys.

Medical Planner/ CodeBook Manager في Bart's and The Royal London Hospital
  • إلى

1:50 Stage of The Royal London and Bart's Hospital
Used CodeBook as a tool for the CSheet process. 5000 Rooms to be
generated with wall and equipment elevations. Work outsourced to Atlas.
Managed Database and coordinated Medical Planning guidance (HBN and
HTM, Part M and BS8300)
Managed generic Rooms with Trust and contractors
Coordinated Data flow within Team.
Particular Team Focus was to develop work consistency of information
delivered.
Setup and Maintain the Central Project Database, which drives all data
including;
Interiors (finishes)
Architectural (doors and windows)
M&E (ventilation and lux level)
Medical Equipment
Study: PhD Study at HOK
Details: Modelling the Healthcare System, an Analysis of Spatial, Time Management
The aim of this study is to investigate the composition of today's healthcare
system and explore how it functions in terms of space time and management.
The study will question whether the healthcare service is efficient in providing
the required services to meet the community's requirement. My research will
explore the history to the present day of healthcare and investigate any shift
towards the future of our healthcare requirements specifically in the UK. Can
an ideal healthcare model be developed to achieve a perfect and dynamic
system?
To achieve an ideal healthcare model, I believe that the client brief should be
based upon a list of underlying criteria as to what makes a successful
healthcare system. I aim to formulate this equation and furthermore, believe
that this very same equation can be converted into and algorithm for a simple
software programme to find the best design configuration of a hospital based
upon the brief.
Research on primary design components will allow me to formulate answers
to my equation. These components will help me to unravel the spatial, time
and management impact of a healthcare system; these are as follows;
• Spatial Implications of Care
• Attitude in Healthcare
• E-health/ Telemedicine and the Paperless Hospital
• Personal Medicine and Expertise Patients
• Nursing Manpower
• Cost (including Life Cycle Cost)
• Relationship between departments (also networking without physical
links)
• Sustainability
• Outside Factors
To analyse my formula, I hope to compare it to future projects based on
models such as the “Hub and Spoke” model. The results may well be very
different but the question will be “does my formula work? “
I hope to test the result of my brief and the algorithm by perhaps comparing it
to real projects, such as the Dubai Medical City.

Medical Planner/ CodeBook في Manchester PFI Hospital
  • إلى

Gained experience in Medical Planning.
CodeBook & Database co-ordinator.
Implementing critical guidance to Project
Coordinating work which are outsourced
Coordinating 1:50 Medical Team
Involved in User Group Meetings with Trust
Establish Generic Rooms

Medical Planning/ CAD Technician في Herts and Essex Hospital
  • إلى

Involved with detail drawings such as cladding, stairs, wall and floors
Detail section, elevation and 1:50 plan drawings
Managed SoA
Managed Room Data using ADB

Medical Planner/ CAD Technician في Liskeard Community Hospital
  • إلى

Detail section, elevation and 1:50 plan drawings
Room loading using CodeBook
Managed Room Data using ADB

Architect Assistant في Farrow Siverton
  • المملكة المتحدة
  • إلى
Architect Assistant في Vanbrugh Health Centre
  • إلى

Looked at various schemes of how to increase the usage and maximise
building use.
CAD drawings drafted proposed options

Architect Assistant في Handsworth Health Centre
  • إلى

Project was to re-design the spaces within the Health Centre and to increase
doctor's facilities.

في Essen Projec
  • ألمانيا
  • إلى

The project involved preliminary concept designs for the Essen Ismaili
Community.

الخلفية التعليمية

ماجستير,
  • في Architecture University of GreenwichLondon's Royal Academy
  • يناير 2000

competition on a Living Bridge across the Thames at Southwark London

ماجستير,
  • في Architecture University of GreenwichLondon's Royal Academy
  • يناير 2000

competition on a Living Bridge across the Thames at Southwark London

الثانوية العامة أو ما يعادلها, Architecture
  • في University of Greenwich
  • يناير 1999

First year Diploma was based on urban planning. Masterplan Chatham Town in Medway. The study was based upon Jane Jacob's theories with reference to her book ‘The Life and Death of Great American Cities'. Second year Diploma involved research on sustainable design.

بكالوريوس, Architecture
  • في University of Greenwich
  • يناير 1999

First year Diploma was based on urban planning. Masterplan Chatham Town in Medway. The study was based upon Jane Jacob's theories with reference to her book ‘The Life and Death of Great American Cities'. Second year Diploma involved research on sustainable design.

Specialties & Skills

AUTOCAD
CONCEPT DEVELOPMENT
CONTENT MANAGEMENT
CUSTOMER RELATIONS
DATABASE ADMINISTRATION
FINANCE
MICROSOFT OFFICE