Mechanical Site Engineer - METRO à Abantia Tempo
  • Qatar - Doha
  • Je travaille ici depuis octobre 2015

Project 1 : LRT Subway underground (Railway) stations, Qatar
Position : Mechanical Site Engineer
Company ` : Abantia Tempo
Client : Qatar Rail
Main contractor : QDVC (Qatar Diar & Vinci Construction)
Reports to : Project Engineer


Scope & Achievements:
The project scope is complete package of MEP supply and installation of 4 underground Railway stations and 8km of tunnel. I was working as a site engineer for Marina 01 & Marina 02 stations and 8km of tunnel for complete mechanical installation, pre commissioning, Testing & commissioning (Air conditioning & ventilation, plumping & drainage and Fire fighting). Around 30Km of pipes (CHW, PDS & FF), 10Km of Fire rated ducts & GI ducts, 4 no of Heat Exchangers, 26 no of Air Handling Units, 120 no of Fan Coil Units, 40 no of Pumps, 74 units of FM200 system, 210 no of hydrants and 60 no of axial fans were installed and pre commissioned under my execution.

Experienced with:

 Technical submittals and shop drawing coordination
 MAF, WMS, ITR, MIR, NCR, ITP & Risk Assessments
 Installation of AHUs, FCUs, Heat exchangers, Fire pumps, chill water pumps, dewatering & cold water supply pumps and exhaust fans
 Installation of Ducting, CHW pipes, fire fighting, Cold water supply, plumping & drainage system
 Installation of CHW plant room, fire pump room & dewatering pump room
 Pressure testing & Flushing of CHW system and fire fighting system
 Air leakage test for ducts
 Pressure test and puff test of FM 200 system
 Pre commissioning of fire Pumps, chill water pumps, submersible pumps, AHUs, FCUs
 TIG welding & Arc welding of CHW piping system
 Fire Proofing system
 Quality Assurance & Quality control


Responsibilities:

 Receive and review shop Drawings, specification, Materials Submittals and Bill of Quantities related to Mechanical works
 Manage and supervise around 250 project team members (Supervisors, foreman & Labours). and Ensure that all HVAC, Plumbing & Drainage, Fire Fighting Installations & Site activities are conducted under controlled conditions as per shop drawings, method statements, specification and work plan
 Drive the project on schedule
 Following the Standards such as NFPA, ASHREA, QCS & SMACNA in Technical Works.
 Inspect completed installations and observe operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards.
 Quality Assurance & Quality Control.
 Coordination & Technical support for site execution.
 Material take offs, material & Manpower utilization.
 Attend the ICE inspections
 Preparing the daily report and weekly report.
 Attending the site coordination meetings & progress meeting with client.
 Conduct the Task launch meeting.
 Site safety implementation.
 Technical Submittals & shop drawing coordination.

Fire Fighting Site Engineer à Aziz Manufacturing Advanced Products
  • Qatar - Doha
  • février 2015 à octobre 2015

Project 2 : Coca cola bottling plant, Qatar
Position : Fire fighting Engineer
Company ` : AZIZ Manufacturing Advanced Technologies Products
Client : Coca Cola - Al mana
Consultant : Tebodin - Bilfinger Middle East
Main contractor : Poullaides Construction Co W.L.L.
Reports to : Project Manager


Scope & Achievements:
The scope of the project is complete installation of fire fighting system for comprise of Plant building, Storage building & Administrative building. The fire fighting system consists of wet sprinkler & fire hydrant system, deluge system, foam system and FM 200 systems. Around 8Km of FF pipes, 2000 sprinklers, 22 hydrants, 5 no of FM 200 units, 2 no of 2500 GPM fire pumps & other fire fighting systems were completely installed and commissioned in just 5 months with very minimal manpower under my direct execution & supervision.

Junior Mechanical Engineer à Nazeeha Construction
  • Sri Lanka - Batticaloa
  • janvier 2014 à janvier 2015

Project 3 : Eastern University hostel building G+3, Sri Lanka
Position : Junior Mechanical Engineer
Company ` : Nazeeha Construction Company
Duration : Jan, 2014 - Jan, 2015

Scope & Description :
The project scope is to complete the civil and MEP installation of 6 buildings of G+3. I worked as a junior mechanical engineer for this project and handled the Mechanical installation which includes fire protection, plumping & drainage system for whole buildings & climate system for administration building.


Significant Responsibilities:
Design & selection MEP (HVAC) system for Low-Rise and Mid-Rise Buildings
Preparation of Material Take Offs (MTOs) and Estimation
Review contract scope of work and specifications.
Conduct on-site visits to make sure the site specifications compare to the design specifications
Review the shop drawings and make technical corrections
Attend the client meetings
Project coordination

Trainee QA/QC Mechanical Engineer à Hairu Engineering Consultancy (Pvt) Ltd
  • Sri Lanka - Ampara
  • mars 2012 à mars 2013

Project 4 : Biomass 2 MW Power plant, Attapaallam, Sri Lanka
Position : Trainee QA/QC Mechanical Engineer
Company ` : Hairu Engineering consultancy

Scope & Description :

The project scope is to build a 2MW biomass power plant. Lifting, Erection, welding of boiler, steam drums, coils, filters, chimney and conveyor belts were supervised. I worked as a QA/QC engineer for mechanical installation and reported to chief consultant directly.


Significant Responsibilities:
Supervised the construction of Biomass steam power plant (fabrication and erection)
Involved Commissioning and maintenance
experience of Working above 200 feet of height with safety cables in hazard places
Project coordination
Follow the project Planning timeline and Quality Assurance
Loading and unloading heavy machineries (above 15tons)
Made sure the Safety of the site

Draftsman à Nazeeha Construction
  • Sri Lanka
  • juin 2009 à juin 2010

Significant Responsibilities:
Preparing MEP drawings for given preferences
Preparing MEP coordination drawings & MTO list
Assisting the design engineer

Éducation

Baccalauréat, Mechanical Engineering
  • à University of Peradeniy
  • octobre 2014
Diplôme, MEP QS
  • à OCEAS college
  • septembre 2014
Diplôme, AutoCAD 2D
  • à ICM
  • mars 2011

Specialties & Skills

Computing
Primavera
CUSTOMER RELATIONS
ENGINEERING
MEETING FACILITATION
MICROSOFT POWERPOINT
PROJECT MANAGEMENT
PROJECT PLANNING
SUPERVISORY SKILLS
Site management
plumbing & Drainage
Auto CAD
fire fighting
Testing & Commissioning

Profils Sociaux

Site Web Personnel
Site Web Personnel

Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.

Langues

Anglais
Expert

Adhésions

ASHRAE
  • Affiliated member
  • January 2014
IMechE
  • Affiliated member
  • October 2013
Institution of Engineers Sri Lanka
  • Associate Menbership
  • March 2018
Ministry of Municipality & Environments (MMUP)
  • UPDA Grade C engineer
  • March 2017