Mohamed Khalaf, Electrical team leader  (maintenance dept.)

Mohamed Khalaf

Electrical team leader (maintenance dept.)

british petroleum (bp)

Location
Egypt - Alexandria
Education
Master's degree, Engineering
Experience
19 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 11 Months

Electrical team leader (maintenance dept.) at british petroleum (bp)
  • Egypt - Alexandria
  • My current job since February 2020

• Carry out supervision for all electrical work activities that done by electrical persons and/or contractors in a safe and environmentally conditions.
• Preparing and revising the maintenance procedures and work instruction for electrical equipment to enhance maintainability, alleviate operations anomalies and minimize maintenance cost of such equipment.
• Oversee daily plans & schedules and follow up routine and non-routine electrical maintenance activities with assigned persons and ensure that best and reliable maintenance practices of Electrical equipment executed in order to improve the process capabilities.
• Have the effective technical aspect coordination between Maintenance Division, Operation Division, Commercial Division, and the Engineering & Project Divisions during executing the periodic activities/tasks or scheduled plant shutdown.
• Supervising troubleshooting of routine or non-routine equipment failure with analyzing and reliability audit then providing technical advices to rectify the problems in futures then rising up failure investigation report for managers.
• Reviewing the daily/weekly reports in log book from different shifts and reporting all incident or near misses to manger and to QHSE dept.
• Management of Electrical Equipment in Hazardous areas (IEC and NEC standard) with great knowledge of electrical ATEX requirements.
• Liaising with subordinates and stores personnel on detailed stock set ups for electrical plant equipment and spare parts.
• Familiar with API-IES-NEMA-ISO-NFPA.

technical orginizer at international exibition service
  • Egypt - Alexandria
  • July 2004 to February 2020

• Carry out installation and maintenance for control boards.

• Carry out Electrical installation (PDB-LDB), HVAC system supervision, determining and Renting Diesels generators for the Exhibition also helping exhibitors in technically problems.

Senior Electrical Engineer at Alexandria Petroleum Company (A.P.C)
  • Egypt - Alexandria
  • February 2005 to February 2020

Alexandria Petroleum Company (A.P.C) 20/2/2005 up to date
Senior Electrical Engineer
Annual performance report Excellent

Job description
1- Technical study office.
• Preparing specification for tenders and the required requisitions.
• Carry out technically reports about offers from vendors.
• Inspection and witness for accepted equipments.
• Follow up for the received equipment.
2- Testing and installation department.
• Carry out the required tests for electrical equipments.
• Carry out electrical installation, commissioning, start up than handover for operation.
3- Automotive department.
• Carry out mounting and dismounting of bearing
• Carry out periodic greasing for motors.


Project achieved in (A.P.C): 1- Project name: South area tanks project.
Project cost: "20 million $"
Installing MV switch gear 11 and 6.6Kv (Schneider) feeding 6 MV pump -motors that transfer naphtha to four tanks, MCC, LDP, PDP and battery charger (chloride) and two transformers (ABB)
2- Project name: Rehabilitation of eastern area tanks.
Project cost: "2 million $"
Installing MV switch gear 11Kv and MCC (ABB) feeding asphalt export pumps
3- Project name: Rehabilitation of unite 3 in the distillation.
Project Cost: "2million $"
Installing MV switch gear 6.6Kv (Schneider)
4- Project name: Rehabilitation of main cooling substation.
Project Cost: 5 million $"
Installing MV switch gear 11Kv and MCC (ABB)
5- Project name: Participate in main substation 66/11
Project Cost: "20 million $"
Installing MV switch gear 11Kv and battery charger (chloride)

E&I inspector at BUREAU VERITAS
  • Egypt - Port Said
  • June 2019 to August 2019

Communicate the construction requirements to all contractors and staff ensuring compliance and conformance with the safety plan, quality plan and Client requirements
* Management and guidance of inspectors to ensure site quality and efficiency result in meeting contract targets and reduce punch items.
* Supervise and coordinate the activities of local inspectors
* Carry out audit against contractors ITPs
* Witness testing activities.
* Monitor the ATEX inspections carried out on site
* Raise NCRs when required and follow to close out
* Provide daily quality surveillance checks and records, ensuring that work is to sit specifications
* Routinely study, check, review and validate the discipline scope of work against the contractors ITPs
Where applicable verify and supervise test equipment calibration
* Produce toolbox talks and technical bulletins to educate the E&I contractors on site standards.
Project name: Mobilized offshore production unite (MOPU)
Project client: North Sinai petroleum company (NOSPCO)
Project location: MOSCO (1) platform - KAMOSE field -Mediterranean sea
Project cost and year: "20 million $-2019

Reliability Engineer at Middle east oil refinary
  • Egypt - Alexandria
  • September 2018 to January 2019

• Develop and implement an effective reliability management system for assigned areas to monitor performance of equipment and systems in order to improve reliability, availability of plant and facilities.
• Analyze equipment history and failure record, and determine dominant and repetitive failure modes of critical equipment in order to proactively manage downtime and ensure safety and continuity of operations.
• Conduct reliability and performance analysis, root cause failure analysis; provide troubleshooting and engineering support and facilitate equipment failure investigations.
• Optimize and develop preventive maintenance programs for plant equipment and incorporate applicable preventive maintenance tasks and effective maintenance intervals into the company's maintenance program and according to the defined policies and standards.

Electrical auditor at Egyptian methanex
  • Egypt - Damietta
  • July 2017 to August 2017

• Review all electrical activities pre-TAR and specially review Safety Critical Equipment List to ensure maintenance is being prioritized on all SCE during TAR.
• Confirm adequate spare parts during TAR.
• Confirm maintenance plans and procedures are being carried out and properly documented.
• Check Supervisors for job knowledge, competency, and understanding of major accident risks.
• Verify crew knowledge of Emergency Response, PTW and MOC Systems

Senior Electrical Engineer at rashed. pet. co
  • Egypt - Alexandria
  • January 2009 to July 2012

Job description
• Discussing and management the periodical planning with other departments.
• Carry out the PTW, daily report, Tool Box Talk (T.B.T) and risk assessment before jobs, and incident reports, S.T.D, F.I.R and E.I.R added to supervision for material files and the required spare parts requisitions.
• Carry out trouble shooting and preventive maintenance for L.V and M.V motors, diesel and gas generators, transformers, UPSs, battery chargers, cathodic protection, L.V and M.V SWG, lighting systems and power outlets circuits for onshore plant and off shore platforms.
• Certified competent Performing authorized and Electrical isolation person from British Gas Co.,

Education

Master's degree, Engineering
  • at Alexandria University
  • October 2009

hazard area classification in flammable atmosphier

Bachelor's degree, Electrical power and machine
  • at Engineering college of alexandria univercity
  • July 2004

Main courses were power electroinc,power analysis,power generation and transmission and distributiin, ac and dc machine

Specialties & Skills

Commisioning
Engineering
Project Management
Maintenance
Operation
AUTOMOTIVE
COOLING
ENGINEER
INSPECTION
WITNESS
SUBSTATION

Languages

English
Intermediate
French
Intermediate
Italian
Beginner
Russian
Beginner

Memberships

Engineering syndicate
  • Voulantanter member in trips
  • July 2004

Training and Certifications

Installation (Training)
Training Institute:
Electricity national company
Duration:
150 hours
Grounding (Training)
Training Institute:
Alexandria university
Electrical power protection (Training)
Training Institute:
ENPPI
Hazardous area classufication (Training)
Training Institute:
Alexandria university
UPS and battery chargers (Training)
Training Institute:
ENPPI
Date Attended:
March 2018
Duration:
40 hours
Planning shutdown and turn a round (Training)
Training Institute:
EPROM
Date Attended:
March 2019
Duration:
40 hours

Hobbies

  • Traverlling
    I like traveling surround historical places all over egypt and i like swimming