Mohamed Muneef, QA QC Inspector Civil

Mohamed Muneef

QA QC Inspector Civil

Al jaber Engineering

Lieu
Qatar - Doha
Éducation
Diplôme, Civil Engineering
Expérience
11 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :11 years, 9 Mois

QA QC Inspector Civil à Al jaber Engineering
  • Qatar - Doha
  • Je travaille ici depuis mars 2022

• Position: QC Inspector :(Period: March-2022-Present
Project: Central Doha & Corniche Beautification Project 2A (Roads & Attenuation Tank and Underpass )
Client: Ashghal Public Work Authority Qatar
Budget:450 M QAR. Doha Qatar


• Coordinates with the site construction team on all quality issues
and chairs quality meetings with QC Personal including project subcontractors.
• To coordinate with construction And Supplier and Sub contractor Submit to Material Submittal submission, Method Statement submission, ITP submission.
• To coordinate with construction crew for ongoing civil/structural
Façade including but not limited to excavation, back filling, compaction,
Reinforcement inspection, formwork inspection, Precast Inspection Curtain wall and Concrete pouring etc.
• Conduct inspection of incoming Precast/ Curtain wall materials
and check if it is comply with the required/ordered materials and
approved as per specification and standard prior to installation.
• Perform inspections and noting down the slumps, temperature of
the Concrete and checking the air content of the freshly taken concrete
samples as per ACI Standard.(Also QCS-2014)
• Perform Inspections at Curtain wall water penetration/ Torque
Pullout etc.
• To initiate the CWIR’s for Client’s witness of inspection points as per ITPs.
• To be more proactive to construction crew for advising to correct
the Activities this could lead to non‐conformance.
• Reporting any Site Observation or non-conformity to the QA/QC
Manager
• Be vigilant for upcoming scheduled activities in advance to
coordinate with 3rd parties in advance for the activities require testing
like FDT, Concreting, Material Frequency sample
• Submission of QA/QC Monthly Report and QA/QC Questionnaire
• Verifying the documentation for certification

Quality Inspector à AL JABER ENGINEERING
  • Qatar - Doha
  • novembre 2020 à mars 2022

• Position: QC Inspector :(Period: Nov-2020-March 2022
Project: AL-Thumama Stadium(B1+GF+4)
Client: Supreme Committee
Budget: $ 350 Million. Doha Qatar


Implement QC procedures and maintains quality standards applicable to on site construction work and ensures that all technical documents relative to site quality control are followed and up to date. Setting out, levelling and surveying the site.


• Coordinates with the site construction team on all quality issues
and chairs quality meetings with QC Personal including project subcontractors.
• To coordinate with construction And Supplier and Sub contractor Submit to Material Submittal submission, Method Statement submission, ITP submission.
• To coordinate with construction crew for ongoing civil/structural
Façade including but not limited to excavation, back filling, compaction,
Reinforcement inspection, formwork inspection, Precast Inspection Curtain wall and Concrete pouring etc.
• Conduct inspection of incoming Precast/ Curtain wall materials
and check if it is comply with the required/ordered materials and
approved as per specification and standard prior to installation.
• Perform inspections and noting down the slumps, temperature of
the Concrete and checking the air content of the freshly taken concrete
samples as per ACI Standard.(Also QCS-2014)
• Perform Inspections at Curtain wall water penetration/ Torque
Pullout etc.
• To initiate the CWIR’s for Client’s witness of inspection points as per ITPs.
• To be more proactive to construction crew for advising to correct
the Activities this could lead to non‐conformance.
• Reporting any Site Observation or non-conformity to the QA/QC
Manager
• Be vigilant for upcoming scheduled activities in advance to
coordinate with 3rd parties in advance for the activities require testing
like FDT, Concreting, Material Frequency sample
• Submission of QA/QC Monthly Report and QA/QC Questionnaire
• Verifying the documentation for certification

Qa/qc Civil Inspector à Al-Turki Enterprises,LLC,Oman
  • Oman - Muscat
  • décembre 2017 à août 2020

Position: QC-Inspector :(Period: Dec, 2017 - Aug 2020)
Project: Tasnim Towers (B+GF+8) - Muscat, Oman.
Client: Al-Turki Enterprises, LLC, Oman

• Coordinates with the site construction team on all quality issues
and chairs quality meetings with QC Personal including project subcontractors.
• To coordinate with construction And Supplier and Sub contractor Submit to RFI submission, Material Inspection.
• To coordinate with construction crew for ongoing civil/structural
Façade including but not limited to excavation, back filling, compaction,
Reinforcement inspection, formwork inspection, Precast Inspection Curtain wall and Concrete pouring etc.
• Conduct inspection of incoming Precast/ Curtain wall materials
and check if it is comply with the required/ordered materials and
approved as per specification and standard prior to installation.
• Perform inspections and noting down the slumps, temperature of
the Concrete and checking the air content of the freshly taken concrete
samples as per ACI Standard.
• Perform Inspections at Curtain wall water penetration/ Torque
Pullout etc.
• To initiate the CWIR’s for Client’s witness of inspection points as per ITPs.
• To be more proactive to construction crew for advising to correct
the Activities this could lead to non‐conformance.
• Reporting any Site Observation or non-conformity to the QA/QC
Manager
• Be vigilant for upcoming scheduled activities in advance to
coordinate with 3rd parties in advance for the activities require testing
like FDT, Concreting, Material Frequency sample
• Submission of QA/QC Monthly Report and QA/QC Questionnaire
• Verifying the documentation for certification

Assistant Engineer Civil à LOKAA DEVELOPERS PVT LTD
  • Inde - Chennai
  • avril 2016 à octobre 2017

Position: Assistant Engineer (Period:Apr, 2016 - Oct, 2017)
Project: LOKKA M -ONE Tower, Chennai (B+GF+27)

• Setting out the works in accordance with the drawings and specification
• Liaising with the project planning engineer regarding construction programs
• Checking materials and work in progress for compliance with the specified requirements
• Observance of safety requirements
• Resolving technical issues with employer’s representatives, suppliers, subcontractors and statutory authorities
• Quality control in accordance with ISs/procedures method statements, quality plans and inspection and test plans, all prepared by the project management team and by subcontractors
• Liaising with company or project purchasing department to ensure that purchase orders adequately define the specified requirements
• Supervising and counseling trainee engineers
• Measurement and valuation (in collaboration with the project quantity surveyor where appropriate)
• Preparing record drawings, technical reports, site diary
• Job review of subordinate staff

JUNIOUR ENGINEER à East Coast Construction and Industries Ltd
  • Inde - Chennai
  • juin 2014 à mars 2016

Position: Junior Engineer (Period: June, 2014 - Mar, 2016)
Project: Syntel Global Development, Chennai


• Maintaining records, work programs and reports.
• Working closely with the client to ensure satisfaction
• Forecast and identify possible distribution to the regular activities
• To ensure works are completed as per quality standards jointly agreed between clients.
• Material required Vs quantities of material used-reconciliation statement.
• Co-ordinate and schedule inspections with clients
• Collection of data regarding daily works to prepare progress reports.
• Co-ordinate and Inspection with Surveyor
• Daily Reporting to Construction Manager.

Site Supervisor à GVP Builders - Chennai
  • Inde - Chennai
  • mai 2012 à mai 2014

Position: Site Supervisor :(Period: May, 2012 - May, 2014)
Project: Nell Kamal Apartments, Chennai


• To ensure that all execution and inspection are carried out as per plan
• Estimation and preparation of BOQ.
• Preparing sub-contractor bills, documentation of reports.
• Liaising with clients and consultants to ensure the timely completion.
• Collecting the detailed plan and preparing the detailed check list.
• Executing the work as per Drawings with quality and safety.

Éducation

Diplôme, Civil Engineering
  • à sree Krishna polytechnic college
  • mai 2012

Specialties & Skills

Event Hosting
Quick Learning
quality auditing
ms project
project execution
on site
quality assurance
quantity surveying

Langues

Anglais
Moyen
Hindi
Expert
Tamil
Langue Maternelle
Arabe
Débutant

Formation et Diplômes

auto cad (Certificat)
Date de la formation:
June 2015

Loisirs

  • volley ball
    I am interested in shutter position