مجموع سنوات الخبرة: 23 سنوات, 9 أشهر
نوفمبر 2020
إلى حتى الآن
BIM Coordinator - Architect Consultant
في Saudi Consulting Services - SAUD CONSULT
البلد :
المملكة العربية السعودية - الرياض
FIT-OUT & RENOVATION THE BUILDING OF MINISTERY OF TOURISM
نوفمبر 2018
إلى نوفمبر 2020
Consultant Architect
وجدت هذه الوظيفة عبر بيت.كوم
في Pace Consultant office.
البلد :
المملكة العربية السعودية - الرياض
Responsible the supervision of all executed Architect work
In Arar & Hassa & Madina Museums
Which contained :
*The approval of shop drawings comparing with tender drawings & Contract documents.
*The approval of all submitted Material matching with project specs and B.O.Q.
*Following up on the progress of executed work throwing the monthly time schedule and comparing it with the approved project time schedule.
In Arar & Hassa & Madina Museums
Which contained :
*The approval of shop drawings comparing with tender drawings & Contract documents.
*The approval of all submitted Material matching with project specs and B.O.Q.
*Following up on the progress of executed work throwing the monthly time schedule and comparing it with the approved project time schedule.
أبريل 2011
إلى أكتوبر 2018
Technical team leader (Senior Architect Engineer).
في Saudi-Binladin Groub.
البلد :
المملكة العربية السعودية - جدة
Last Projects:
***King Abdullaziz Airport
Project Control Department
Senior Architecture Supervision:
*Reviewing and comparing the Shop drawings with the executed work in site.
* Planning and dividing the work on site with all subcontractors and other trades.
*coordinating with consultant and subcontractors to overcome any obstacles hindering the implementation of the work.
*** Al-Marwa Bus Station:
Technical Office Site Architecture Engineer:
*Receiving the approved drawings from
project consultant and distributing it to the different departments.
*Matching architectural drawings with structural and electromechanical drawings.
*Operating the required modifications on drawings and get the approval from consultant on it.
*Making the quantity survey of architecture items as per drawings and match with required quantity in site to prepare the claims or payment certificates.
***Medical City
Housing Manger
*Guidance for the implementation of integrated studies of the project from all departments:
-The scope of work determined by studying the main contract and all its attachments throwing engineering drawings, quantities schedules, general specifications of the project materials, questions and answers in the tender stage.
-The actual time schedule of project
Throw the study of the one provided from consultant by planing department to get the detailed one based on the stages of project starting with the concept design stage ending to test and commissioning.
-Determine the actual costs of the project comparing with project budget by the cost control department and the technical office trades throw calculating the actual quantities in the engineering drawings.
-achieving integration and harmony between all stakeholders.
***Correction Facilities
Technical office
Architect coordinator dammam site.
*Architectural and internal Design review for all project design stages such as:
Concept Design. - Final Design. - Architectural shop drawings. - Coordinate architectural drawing with other trades. - As built).
** Material submittals: - Review all architectural submittal to make sure their conformity with the specifications required. - Follow up the all materials (Arch., Mech., Elec., etc) from approval until it’s installed in the site.
*** Site coordination: - Solve all the site problems with consultant core team.
***King Abdullaziz Airport
Project Control Department
Senior Architecture Supervision:
*Reviewing and comparing the Shop drawings with the executed work in site.
* Planning and dividing the work on site with all subcontractors and other trades.
*coordinating with consultant and subcontractors to overcome any obstacles hindering the implementation of the work.
*** Al-Marwa Bus Station:
Technical Office Site Architecture Engineer:
*Receiving the approved drawings from
project consultant and distributing it to the different departments.
*Matching architectural drawings with structural and electromechanical drawings.
*Operating the required modifications on drawings and get the approval from consultant on it.
*Making the quantity survey of architecture items as per drawings and match with required quantity in site to prepare the claims or payment certificates.
***Medical City
Housing Manger
*Guidance for the implementation of integrated studies of the project from all departments:
-The scope of work determined by studying the main contract and all its attachments throwing engineering drawings, quantities schedules, general specifications of the project materials, questions and answers in the tender stage.
-The actual time schedule of project
Throw the study of the one provided from consultant by planing department to get the detailed one based on the stages of project starting with the concept design stage ending to test and commissioning.
-Determine the actual costs of the project comparing with project budget by the cost control department and the technical office trades throw calculating the actual quantities in the engineering drawings.
-achieving integration and harmony between all stakeholders.
***Correction Facilities
Technical office
Architect coordinator dammam site.
*Architectural and internal Design review for all project design stages such as:
Concept Design. - Final Design. - Architectural shop drawings. - Coordinate architectural drawing with other trades. - As built).
** Material submittals: - Review all architectural submittal to make sure their conformity with the specifications required. - Follow up the all materials (Arch., Mech., Elec., etc) from approval until it’s installed in the site.
*** Site coordination: - Solve all the site problems with consultant core team.
يونيو 2010
إلى مارس 2011
Site engineer
في Global Designs
البلد :
المملكة العربية السعودية - جدة
I have been managing all the construction work of (2) Spa projects:
1- Saudi German Hospital Spa (Jeddah)
2- Toni & guy Spa (Jeddah)
Managing the construction project.
Overseeing building work
Undertaking surveys
Setting out sites
Checking technical designs and drawings to ensure that they are followed correctly
Supervising contracted staff
Ensuring project packages meet agreed specifications, budgets and timescales
Liaising with clients, subcontractors, and other professional staff, especially quantity surveyors and the overall project manager.
Providing technical advice and solving problems on-site.
Preparing site reports and filling in other paperwork.
Liaising with quantity surveyors about the ordering and the pricing of materials.
Ensuring that health and safety and sustainability policies and legislation are adhered to.
1- Saudi German Hospital Spa (Jeddah)
2- Toni & guy Spa (Jeddah)
Managing the construction project.
Overseeing building work
Undertaking surveys
Setting out sites
Checking technical designs and drawings to ensure that they are followed correctly
Supervising contracted staff
Ensuring project packages meet agreed specifications, budgets and timescales
Liaising with clients, subcontractors, and other professional staff, especially quantity surveyors and the overall project manager.
Providing technical advice and solving problems on-site.
Preparing site reports and filling in other paperwork.
Liaising with quantity surveyors about the ordering and the pricing of materials.
Ensuring that health and safety and sustainability policies and legislation are adhered to.
ديسمبر 2007
إلى يونيو 2010
Consultant Interior Architecture Designer
في FAEC) Fahd Alireza Engineering Consultants)
البلد :
المملكة العربية السعودية - جدة
• Review and approval of Contractors' Shop Drawings.
• Review and timely response to Associate Architect 'Design Queries.
• Review and approve submittals including mock-up and samples.
• Review and approve quality of materials and workmanship in Mock-up Room.
• Liaise with Head Office on any major design related matters - assess on a case-by-case basis those
• Manage staff (Architects, Material Specialists, and Procurement Team).
• Providing Interior Design Consulting Services to the Buildings Package as a Senior Interior Designer with Project Management responsibilities as one of The Project Management Team (PMT).
• Monitoring the contractor to get the job done as per scope on time.
• Provide design resolution for interior fit-out items where coordination is required between disciplines.
- managing and handling design assignments for turn key fit out projects to design, detailing, specifying materials & finishing and coordination with project team during execution.
- preparation necessary shop drawings, detail drawing packages and design documentation & technical packages for tenders as necessary for submission & obtaining work permits, approvals from end users and relative local authoritiessee less
• Review and timely response to Associate Architect 'Design Queries.
• Review and approve submittals including mock-up and samples.
• Review and approve quality of materials and workmanship in Mock-up Room.
• Liaise with Head Office on any major design related matters - assess on a case-by-case basis those
• Manage staff (Architects, Material Specialists, and Procurement Team).
• Providing Interior Design Consulting Services to the Buildings Package as a Senior Interior Designer with Project Management responsibilities as one of The Project Management Team (PMT).
• Monitoring the contractor to get the job done as per scope on time.
• Provide design resolution for interior fit-out items where coordination is required between disciplines.
- managing and handling design assignments for turn key fit out projects to design, detailing, specifying materials & finishing and coordination with project team during execution.
- preparation necessary shop drawings, detail drawing packages and design documentation & technical packages for tenders as necessary for submission & obtaining work permits, approvals from end users and relative local authoritiessee less
يناير 2005
إلى ديسمبر 2007
INTERIOR DESIGNER, CHIEF OF DESIGNING DEPARTMENT
في DECO MOON
البلد :
المملكة العربية السعودية - جدة
we handle over with project after architect work has finished
rearranging zones according to customer needs and study that with the requirements of each zone, make the architect modifications and make the furniture layout, modifying the electrical work according to furniture lay out and reflected ceiling plans
make the perspective designing proposal for each zone
discuss with customer
make the ceiling plan, flooring plan elevations, sections, details for each zone
supervision for executive work in sites
rearranging zones according to customer needs and study that with the requirements of each zone, make the architect modifications and make the furniture layout, modifying the electrical work according to furniture lay out and reflected ceiling plans
make the perspective designing proposal for each zone
discuss with customer
make the ceiling plan, flooring plan elevations, sections, details for each zone
supervision for executive work in sites
مارس 2004
إلى يناير 2005
sales engineer
في Muhaidab company
البلد :
المملكة العربية السعودية - الرياض
support the sales department in big wooden projects (doors, windows, furniture) to communicate with the consultant or main contractor in technical data that must be provided to make the price list correctly
after that making the price list.
after that making the price list.
سبتمبر 2003
إلى مارس 2004
Site engineer
في arabian paints
البلد :
المملكة العربية السعودية - الرياض
Designing and supervising for two villas for the owner of the arabian paint company
يونيو 2000
إلى سبتمبر 2003
Technical Engineer
في Emileo Interiors
البلد :
مصر - القاهرة
Responsible for following out the technical specification for the consultant and be sure that this specification be done at site
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني