Projects Names:
1-Project: Al Rahmania Shopping Mall.
Budget: 250, 000, 000 AED
Project description: Shopping mall of built up area 60, 000 Mtr2, B +G + Mezz. +R+UR including various areas of experience such as:
• HVAC System (8 Nos. of air cold chiller, FAHU, AHU FCUs).
• Drainage and water supply system.
• FF system (2set of firefighting pumps and 1 fire hydrant pump).
• BMS System.
• Gas System (3 Water Meter rooms)
• Low current system such as (ACS, PMS, CCTV, PA).
• Conveying system (33 units).
• LV System.
• 33 KV substation.
2- Project: Hotel Apartment (2B+G+4P+20 TYPICAL+ROOF+UP-1 & 2)
PLOT NO: (4) - ALND-AL QASIMIYA (U.A.E)
Consultant: KHATIB & ALAMI Consolidated Engineering Company
Budget: 115, 000, 000 AED
3-Project: (B+G+Mez+6P+26 TYP. + Ser. Floor +H.C +Helipad)
PLOT NO: (578) - ALMAJAZ (U.A.E)
Consultant: KHATIB & ALAMI Consolidated Engineering Company
Budget: 120, 000, 000 AED
4-Project: PROPOSED HOTEL FOR AL SOOR INVESTMENTS ON
PLOT: 671 AL GHUWAIR (U.A.E)
Consultant: Al Emaar Engineering Consultant
Budget: 41, 000, 000 AED
Responsibilities:
Initiating Stage
• Assisting PM and planning engineer during preparation of baseline work program.
• liaising with authorities to get the required NOCs such as water, drainage, etisalat, electrical, ……etc., in order to get work permit
• Review MEP B.O.Q and make sure that it is matching with MEP tender drawings.
• Review the contract of MEP subcontractor and make sure that the MEP scope is identified and covered as per BOQ and tender drawings.
• Review tender documents /drawings of MEP system and compare it with the IFC drawings.
Execution Stage
• Review MEP material/equipment technical submittals, shop drawing and builders work prior to submitting to consultant in order to avoid resubmission.
• Follow up the log sheet of long lead item, authorities’ log, material submittal and shop drawings submittal.
• Studying any impact on MEP services caused by Architectural/structure changes or additional scope and raise variation order accordingly to consultant.
• Coordinating all MEP services with structure, architectural and ID elements.
• Monitoring of work progress and ensure that all works are done as per plan.
• Ensure that Company/ Authorities HSE policies are implemented at site in coordination with HSE department.
• Assist in the recovery/revised plan in case of any delay occurred to keep the project on track.
• Review and release the MEP subcontractor’s payments.
• Ensuring that all fixations of MEP services as per authorities’ requirements and project specifications.
• Review the method statements of MEP works respecting the installation works and logistics for equipment positioning.
• Ensuring that services provisions inspection and clearance are provided in time for structure.
• Provide technical advice to construction team
Closing stage
• Ensure that MEP site instruction/NCR is closed out.
• Follow up and review the As Built Drawings.
• Clearing all snag list as per consultant instructions.
• Follow up with authorities for project’s handing over and get final NOC.
• Ensure that all warranty, guaranty and operation manual are submitted prior to closing the project.