Lead Civil Design Coordinator
Ge Grid Solutions
مجموع سنوات الخبرة :17 years, 0 أشهر
400/132kV Canal Gardens Substation with Client - DEWA & Consultant - Energo (TED Code - 2004)
N-14324.1 Provision of New 500MVA, 400/220/33kV at Mussafah Grid station Client - Transco / Consultant - EDF
Responsible for Civil and Structural Design, Review & Coordination with Primary Engineering, Civil design Consultant & MEP discipline, internal cross-functional teams for substation projects
Balgaran Package (132/33kV 4nos Substations plus Remote end works with Client - NG (South) Saudi Arabia.
Jizan Aramco (132/33kV 2nos Substations Jizan region-14months) with Client - Aramco & NG (South) Saudi
Arabia.
• Avoided Stone Column recommendations in geotechnical report .
• Provided road base layers and gain 3 months for Soil investigation.
• Finalized the framing system in equipment layout to reduce further time consumption by design consultant.
• 400kV S/S plot Boundary wall depth reduced on 2 sides to enhance profit margin on civil works.
• On time delivery - Achieved Sales target for design and site execution.
Page 2 of 3
Key Achievements:
• Execution of structures in existing live substations.
• Challenging to fix arrangement of Gantry, GIB, outdoor foundations, trenches in existing live 380kV substations.
• Made special foundation arrangements for extension of Swgr bldg due to existing power cable / control cables on the
extension path.
• Successfully completed these critical works at site without time and cost impact
Lead Civil Design-
400/132/33kV BAB & 220kV ASAB with TRANSCO Abu Dhabi
Key Achievements:
• Water proofing membrane excluded for the basement wall.
110/13.8kV, 132/13.8kV - Power Factor Correction for 44nos Substations (Switchgear/GIS Building Extensions
and Capacitor foundations on existing substations) with National Grid (South) KSA
-