Site location: Arzew Industrial Zone, Oran, Algeria.
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Manufacturing, Erecting, Testing, Commissioning of Piping for services and process systems
\{natural gas, steam (high, medium and Low Pressure), co2, Ammonia Liquid & Ammonia Vapor,
Synthesis Gas, instrument air & service air, Chemical Dosing, Nitrogen, Solid Urea and Urea
Solution, Lubricating Oil systems, fire fighting systems, cooling systems, water treatment
Systems, Hydraulic systems, .etc\}
2-Installation For Pipe Supports
\{pipe shoe, U bolts and other special supports \}
3-Installation and connecting for Mechanical Equipments and components
\{valves, pumps, heat exchangers, filters, gages etc\}
4-Using most of Pipes Welding methods
\{SMAW, GMAW, GTAW\}.
5-Using International standards and Regulations for Mechanical and Piping work
\{API, ASME, DIN\}
March, 2009 till Oct.2009: Name of company: Energya Construction Company
Engineering & Procurement: IBERDROLA
Client: The Ministry of Electricity and Energy
Project: ISCC- KUREIMAT Power plant
Site location: Kureimat, Bini Swif, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Ensuring Construction activities are carried out in accordance with the specification codes, site
procedures and specification for client.
2-Responsible for manufacturing, erecting, Testing, commissioning, maintenance and operating for all ferrous piping
(Carbon steel; st st.; High temp.; low temp) using P&ID'S, Isometrics and planes.
3-Installation for Steel structures (Fabrication and Erection)
\{Pipe Racks-Access platforms-Shelters- Pipe supports\}.
4-Review construction progress with the approved work schedule.
5-Manage and fallow up with client to solving the technical problems.
DEC., 2008 till March2009: Name of company: Energya Construction Company
Engineering & Procurement: Olympic electric
Client: Olympic electric
Project: Construction of main bran factory
Site location: 10th from Ramadan Industrial Zone, Cairo, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1- Leading construction and service team
\{Installation, connecting, testing, commissioning and operating\}
2-Installation for Steel structures (Fabrication and Erection)
\{pipe shoes, U bolts and other special supports \}
3-Using international standards and regulations for mechanical.
4-Review finial documentation.
June, 2008 till DEC.2008: Name of company: Energya Construction Company
Engineering: DAR EL-HANDASA
Client: Energya cables
Project: Construction of Cables Factory
Site location: Rabigh Industrial Zone, Jeddah, (KSA)
Position: Senior Mechanical site manager
Duties, Responsibilities: -
1-Monitors and control the industrial building construction activities.
2- Prepare and monitor electromechanical works.
3-Organize the working procedures in the sites.
SEP., 2007 till June, 2008: Name of company: Energya Construction Company
Engineering & Procurement: Energya Steel Solution
Client: Energya Steel Solution
Project: Construction of Energya Factory
Site location: Rabigh Industrial Zone, Jeddah, (KSA)
Job Title: Senior Mechanical Site Engineer
Duties, Responsibilities: -
1-Erection of the Piping (above / under) ground.
2-Installation for Steel structures (Fabrication and Erection)
\{Pipe Racks-Access platforms-Shelters- Pipe supports\}.
3-Erection of All Equipment's
4-Reinstatment all tasks after testing and commissioning.
APRIL, 2007till SEP., 2007: Name of company: SEA GULL for General Contracting and Supply
Engineering: GECAD GHANA, General Electric (GE France)
Client: The Ministry of Electricity and Energy (GHANA)
Project: Tema thermal Power plant
(GE Frame 9E GT 125 M.W Island and Balance of plant)
Site location: Tema Industrial zone, (GHANA)
Job Title: mechanical site engineer
Duties, Responsibilities: -
1-Installation for all ferrous Equipment's
\{Vessel - towers -Air coolers- stack-Oil heater- Pumps\}.
2-Installation, connecting, testing, commissioning and operating for mechanical
Equipment's and components
\{pumps, purifiers, boilers, gen. sets, heat exchangers, fuel modules, sewage treatment planets, filters,
valves, etc\}
3-Optimize operation in accordance with the production and work.
4-The ability to deal and convince the client.
MAY, 2006 till APRIL, 2007: Name of company: SEA GULL for General Contracting and Supply
Engineering: NEM Netherlands
Client: The Ministry of Electricity and Energy
Project: Cairo North II power plant (Two Boilers250 MW)
Site location: Cairo North II Power Plant Cairo, Egypt.
Job Title: Mechanical Site Engineer.
Duties, Responsibilities: -
1-Coordinate Boilers erections
\{two heat recovery steam boiler) (Combine cycle\}.
2- Managing constructions activities in field erection.
(Steel structure, Stacks, Air filter, Piping, Mechanical alignment, Pumps, Eectromechanically, Boiler panels, Baffles and Equipment's)
3-Preparation of weekly progress report to record usage of material, equipment's, construction
activities carried out manpower, etc
- Job role:
-
Engineering