Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Mohamed Yussuf, Construction Manager

Mohamed Yussuf

Construction Manager·Orascom Construction Limited - Other Locations

Egypt

Bachelor's degree, Mechanical Power Engineering

Work experience

Total years of experience: 14 years, 0 months

Construction Manager

November 2019 - Present

Orascom Construction Limited - Other Locations

Cairo, Egypt

I found this job using Bayt.com

November 2019 - Present

 Schedule the project in logical steps and budget time required to meet deadlines.  Determine labor requirements and dispatch workers to construction sites  Record document concisely and clearly all project plan.  Identify prime risks and limitations within project plan.  Evaluate and determine plan variance from project performance. ... Conduct change throughout project inclusive of schedule, scope and team membership.

Company industry:
Construction & Building
Job role:
Construction and Building

October 2009 - March 2013

Orascom Construction Industries

United Arab Emirates

October 2009 - March 2013

Oct., 2009 till Now: Name of company: Orascom Construction Industries (OCI)
Engineering & Procurement: UHDE.
Client: Sorfert (Orascom 51% & Sonatrach 49%)
Project: Sorfert Fertilizer Complex.
• Train 1 for Ammonia 2200 Ton/Day and Urea 3400 Ton/Day.
• Train 2 for Ammonia 2200 Ton/Day.

Company industry:
Construction & Building
Job role:
Other

Senior Mechanical and Piping Engineer

March 2009 - October 2009

The Ministry of Electricity and Energy

March 2009 - October 2009

March, 2009 till Oct.2009: Name of company: Energya Construction Company
Engineering & Procurement: IBERDROLA
Client: The Ministry of Electricity and Energy
Project: ISCC- KUREIMAT Power plant
Site location: Kureimat, Bini Swif, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Ensuring Construction activities are carried out in accordance with the specification codes, site
procedures and specification for client.
2-Responsible for manufacturing, erecting, Testing, commissioning, maintenance and operating for all ferrous piping
(Carbon steel; st st.; High temp.; low temp) using P&ID'S, Isometrics and planes.
3-Installation for Steel structures (Fabrication and Erection)
\{Pipe Racks-Access platforms-Shelters- Pipe supports\}.
4-Review construction progress with the approved work schedule.
5-Manage and fallow up with client to solving the technical problems.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Senior Mechanical and Piping Engineer

December 2008 - March 2009

Olympic electric

Egypt

December 2008 - March 2009

DEC., 2008 till March2009: Name of company: Energya Construction Company
Engineering & Procurement: Olympic electric
Client: Olympic electric
Project: Construction of main bran factory
Site location: 10th from Ramadan Industrial Zone, Cairo, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1- Leading construction and service team
\{Installation, connecting, testing, commissioning and operating\}
2-Installation for Steel structures (Fabrication and Erection)
\{pipe shoes, U bolts and other special supports \}
3-Using international standards and regulations for mechanical.
4-Review finial documentation.

Company industry:
Industrial Production
Job role:
Engineering

June 2008 - December 2008

Energya cables

United Arab Emirates

June 2008 - December 2008

Oct., 2009 till Now: Name of company: Orascom Construction Industries (OCI)
Engineering & Procurement: UHDE.
Client: Sorfert (Orascom 51% & Sonatrach 49%)
Project: Sorfert Fertilizer Complex.
• Train 1 for Ammonia 2200 Ton/Day and Urea 3400 Ton/Day.
• Train 2 for Ammonia 2200 Ton/Day.

Company industry:
Industrial Production
Job role:
Other

September 2007 - June 2008

Energya Steel Solution

September 2007 - June 2008

Oct., 2009 till Now: Name of company: Orascom Construction Industries (OCI)
Engineering & Procurement: UHDE.
Client: Sorfert (Orascom 51% & Sonatrach 49%)
Project: Sorfert Fertilizer Complex.
• Train 1 for Ammonia 2200 Ton/Day and Urea 3400 Ton/Day.
• Train 2 for Ammonia 2200 Ton/Day.

Company industry:
Industrial Production
Job role:
Other

April 2007 - September 2007

The Ministry of Electricity and Energy

April 2007 - September 2007

Oct., 2009 till Now: Name of company: Orascom Construction Industries (OCI)
Engineering & Procurement: UHDE.
Client: Sorfert (Orascom 51% & Sonatrach 49%)
Project: Sorfert Fertilizer Complex.
• Train 1 for Ammonia 2200 Ton/Day and Urea 3400 Ton/Day.
• Train 2 for Ammonia 2200 Ton/Day.

Company industry:
General Engineering Consultancy
Job role:
Other

May 2006 - April 2007

The Ministry of Electricity and Energy

May 2006 - April 2007

Oct., 2009 till Now: Name of company: Orascom Construction Industries (OCI)
Engineering & Procurement: UHDE.
Client: Sorfert (Orascom 51% & Sonatrach 49%)
Project: Sorfert Fertilizer Complex.
• Train 1 for Ammonia 2200 Ton/Day and Urea 3400 Ton/Day.
• Train 2 for Ammonia 2200 Ton/Day.

Company industry:
General Engineering Consultancy
Job role:
Other

Mechanical site engineer

December 2005 - April 2006

Arab contractors

Egypt

December 2005 - April 2006

DEC., 2005 till APRIL, 2006: Name of company: Vibrex for Tunnel and foundation
Client: Arab contractors
Project: construction of waste water tunnels
Job Title: Mechanical site engineer
Duties, Responsibilities: -
1-Able to handle the operations of mechanical engineering.
2-Leading workshops fabrication works.
3-Installing and maintaining variable kinds of machines and equipments.
4-Leading construction and service teams.
5- Review finial documentation.

Company industry:
Construction & Building
Job role:
Civil Engineering

Senior Mechanical and Piping Engineer

-

Arzew Industrial Zone

India

-

Site location: Arzew Industrial Zone, Oran, Algeria.
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Manufacturing, Erecting, Testing, Commissioning of Piping for services and process systems
\{natural gas, steam (high, medium and Low Pressure), co2, Ammonia Liquid & Ammonia Vapor,
Synthesis Gas, instrument air & service air, Chemical Dosing, Nitrogen, Solid Urea and Urea
Solution, Lubricating Oil systems, fire fighting systems, cooling systems, water treatment
Systems, Hydraulic systems, .etc\}
2-Installation For Pipe Supports
\{pipe shoe, U bolts and other special supports \}
3-Installation and connecting for Mechanical Equipments and components
\{valves, pumps, heat exchangers, filters, gages etc\}
4-Using most of Pipes Welding methods
\{SMAW, GMAW, GTAW\}.
5-Using International standards and Regulations for Mechanical and Piping work
\{API, ASME, DIN\}

Job role:
Engineering

Senior Mechanical and Piping Engineer

-

Rabigh Industrial Zone

India

-

Site location: Arzew Industrial Zone, Oran, Algeria.
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Manufacturing, Erecting, Testing, Commissioning of Piping for services and process systems
\{natural gas, steam (high, medium and Low Pressure), co2, Ammonia Liquid & Ammonia Vapor,
Synthesis Gas, instrument air & service air, Chemical Dosing, Nitrogen, Solid Urea and Urea
Solution, Lubricating Oil systems, fire fighting systems, cooling systems, water treatment
Systems, Hydraulic systems, .etc\}
2-Installation For Pipe Supports
\{pipe shoe, U bolts and other special supports \}
3-Installation and connecting for Mechanical Equipments and components
\{valves, pumps, heat exchangers, filters, gages etc\}
4-Using most of Pipes Welding methods
\{SMAW, GMAW, GTAW\}.
5-Using International standards and Regulations for Mechanical and Piping work
\{API, ASME, DIN\}
March, 2009 till Oct.2009: Name of company: Energya Construction Company
Engineering & Procurement: IBERDROLA
Client: The Ministry of Electricity and Energy
Project: ISCC- KUREIMAT Power plant
Site location: Kureimat, Bini Swif, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Ensuring Construction activities are carried out in accordance with the specification codes, site
procedures and specification for client.
2-Responsible for manufacturing, erecting, Testing, commissioning, maintenance and operating for all ferrous piping
(Carbon steel; st st.; High temp.; low temp) using P&ID'S, Isometrics and planes.
3-Installation for Steel structures (Fabrication and Erection)
\{Pipe Racks-Access platforms-Shelters- Pipe supports\}.
4-Review construction progress with the approved work schedule.
5-Manage and fallow up with client to solving the technical problems.
DEC., 2008 till March2009: Name of company: Energya Construction Company
Engineering & Procurement: Olympic electric
Client: Olympic electric
Project: Construction of main bran factory
Site location: 10th from Ramadan Industrial Zone, Cairo, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1- Leading construction and service team
\{Installation, connecting, testing, commissioning and operating\}
2-Installation for Steel structures (Fabrication and Erection)
\{pipe shoes, U bolts and other special supports \}
3-Using international standards and regulations for mechanical.
4-Review finial documentation.

June, 2008 till DEC.2008: Name of company: Energya Construction Company
Engineering: DAR EL-HANDASA
Client: Energya cables
Project: Construction of Cables Factory
Site location: Rabigh Industrial Zone, Jeddah, (KSA)
Position: Senior Mechanical site manager
Duties, Responsibilities: -
1-Monitors and control the industrial building construction activities.
2- Prepare and monitor electromechanical works.
3-Organize the working procedures in the sites.

Job role:
Engineering

Senior Mechanical and Piping Engineer

-

Rabigh Industrial Zone

India

-

Site location: Arzew Industrial Zone, Oran, Algeria.
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Manufacturing, Erecting, Testing, Commissioning of Piping for services and process systems
\{natural gas, steam (high, medium and Low Pressure), co2, Ammonia Liquid & Ammonia Vapor,
Synthesis Gas, instrument air & service air, Chemical Dosing, Nitrogen, Solid Urea and Urea
Solution, Lubricating Oil systems, fire fighting systems, cooling systems, water treatment
Systems, Hydraulic systems, .etc\}
2-Installation For Pipe Supports
\{pipe shoe, U bolts and other special supports \}
3-Installation and connecting for Mechanical Equipments and components
\{valves, pumps, heat exchangers, filters, gages etc\}
4-Using most of Pipes Welding methods
\{SMAW, GMAW, GTAW\}.
5-Using International standards and Regulations for Mechanical and Piping work
\{API, ASME, DIN\}
March, 2009 till Oct.2009: Name of company: Energya Construction Company
Engineering & Procurement: IBERDROLA
Client: The Ministry of Electricity and Energy
Project: ISCC- KUREIMAT Power plant
Site location: Kureimat, Bini Swif, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Ensuring Construction activities are carried out in accordance with the specification codes, site
procedures and specification for client.
2-Responsible for manufacturing, erecting, Testing, commissioning, maintenance and operating for all ferrous piping
(Carbon steel; st st.; High temp.; low temp) using P&ID'S, Isometrics and planes.
3-Installation for Steel structures (Fabrication and Erection)
\{Pipe Racks-Access platforms-Shelters- Pipe supports\}.
4-Review construction progress with the approved work schedule.
5-Manage and fallow up with client to solving the technical problems.
DEC., 2008 till March2009: Name of company: Energya Construction Company
Engineering & Procurement: Olympic electric
Client: Olympic electric
Project: Construction of main bran factory
Site location: 10th from Ramadan Industrial Zone, Cairo, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1- Leading construction and service team
\{Installation, connecting, testing, commissioning and operating\}
2-Installation for Steel structures (Fabrication and Erection)
\{pipe shoes, U bolts and other special supports \}
3-Using international standards and regulations for mechanical.
4-Review finial documentation.

June, 2008 till DEC.2008: Name of company: Energya Construction Company
Engineering: DAR EL-HANDASA
Client: Energya cables
Project: Construction of Cables Factory
Site location: Rabigh Industrial Zone, Jeddah, (KSA)
Position: Senior Mechanical site manager
Duties, Responsibilities: -
1-Monitors and control the industrial building construction activities.
2- Prepare and monitor electromechanical works.
3-Organize the working procedures in the sites.

SEP., 2007 till June, 2008: Name of company: Energya Construction Company
Engineering & Procurement: Energya Steel Solution
Client: Energya Steel Solution
Project: Construction of Energya Factory
Site location: Rabigh Industrial Zone, Jeddah, (KSA)
Job Title: Senior Mechanical Site Engineer
Duties, Responsibilities: -
1-Erection of the Piping (above / under) ground.
2-Installation for Steel structures (Fabrication and Erection)
\{Pipe Racks-Access platforms-Shelters- Pipe supports\}.
3-Erection of All Equipment's
4-Reinstatment all tasks after testing and commissioning.

Job role:
Engineering

Senior Mechanical and Piping Engineer

-

Tema Industrial

India

-

Site location: Arzew Industrial Zone, Oran, Algeria.
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Manufacturing, Erecting, Testing, Commissioning of Piping for services and process systems
\{natural gas, steam (high, medium and Low Pressure), co2, Ammonia Liquid & Ammonia Vapor,
Synthesis Gas, instrument air & service air, Chemical Dosing, Nitrogen, Solid Urea and Urea
Solution, Lubricating Oil systems, fire fighting systems, cooling systems, water treatment
Systems, Hydraulic systems, .etc\}
2-Installation For Pipe Supports
\{pipe shoe, U bolts and other special supports \}
3-Installation and connecting for Mechanical Equipments and components
\{valves, pumps, heat exchangers, filters, gages etc\}
4-Using most of Pipes Welding methods
\{SMAW, GMAW, GTAW\}.
5-Using International standards and Regulations for Mechanical and Piping work
\{API, ASME, DIN\}
March, 2009 till Oct.2009: Name of company: Energya Construction Company
Engineering & Procurement: IBERDROLA
Client: The Ministry of Electricity and Energy
Project: ISCC- KUREIMAT Power plant
Site location: Kureimat, Bini Swif, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Ensuring Construction activities are carried out in accordance with the specification codes, site
procedures and specification for client.
2-Responsible for manufacturing, erecting, Testing, commissioning, maintenance and operating for all ferrous piping
(Carbon steel; st st.; High temp.; low temp) using P&ID'S, Isometrics and planes.
3-Installation for Steel structures (Fabrication and Erection)
\{Pipe Racks-Access platforms-Shelters- Pipe supports\}.
4-Review construction progress with the approved work schedule.
5-Manage and fallow up with client to solving the technical problems.
DEC., 2008 till March2009: Name of company: Energya Construction Company
Engineering & Procurement: Olympic electric
Client: Olympic electric
Project: Construction of main bran factory
Site location: 10th from Ramadan Industrial Zone, Cairo, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1- Leading construction and service team
\{Installation, connecting, testing, commissioning and operating\}
2-Installation for Steel structures (Fabrication and Erection)
\{pipe shoes, U bolts and other special supports \}
3-Using international standards and regulations for mechanical.
4-Review finial documentation.

June, 2008 till DEC.2008: Name of company: Energya Construction Company
Engineering: DAR EL-HANDASA
Client: Energya cables
Project: Construction of Cables Factory
Site location: Rabigh Industrial Zone, Jeddah, (KSA)
Position: Senior Mechanical site manager
Duties, Responsibilities: -
1-Monitors and control the industrial building construction activities.
2- Prepare and monitor electromechanical works.
3-Organize the working procedures in the sites.

SEP., 2007 till June, 2008: Name of company: Energya Construction Company
Engineering & Procurement: Energya Steel Solution
Client: Energya Steel Solution
Project: Construction of Energya Factory
Site location: Rabigh Industrial Zone, Jeddah, (KSA)
Job Title: Senior Mechanical Site Engineer
Duties, Responsibilities: -
1-Erection of the Piping (above / under) ground.
2-Installation for Steel structures (Fabrication and Erection)
\{Pipe Racks-Access platforms-Shelters- Pipe supports\}.
3-Erection of All Equipment's
4-Reinstatment all tasks after testing and commissioning.

APRIL, 2007till SEP., 2007: Name of company: SEA GULL for General Contracting and Supply
Engineering: GECAD GHANA, General Electric (GE France)
Client: The Ministry of Electricity and Energy (GHANA)
Project: Tema thermal Power plant
(GE Frame 9E GT 125 M.W Island and Balance of plant)
Site location: Tema Industrial zone, (GHANA)
Job Title: mechanical site engineer
Duties, Responsibilities: -
1-Installation for all ferrous Equipment's
\{Vessel - towers -Air coolers- stack-Oil heater- Pumps\}.
2-Installation, connecting, testing, commissioning and operating for mechanical
Equipment's and components
\{pumps, purifiers, boilers, gen. sets, heat exchangers, fuel modules, sewage treatment planets, filters,
valves, etc\}
3-Optimize operation in accordance with the production and work.
4-The ability to deal and convince the client.

Job role:
Engineering

Senior Mechanical and Piping Engineer

-

Stacks, Air

India

-

Site location: Arzew Industrial Zone, Oran, Algeria.
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Manufacturing, Erecting, Testing, Commissioning of Piping for services and process systems
\{natural gas, steam (high, medium and Low Pressure), co2, Ammonia Liquid & Ammonia Vapor,
Synthesis Gas, instrument air & service air, Chemical Dosing, Nitrogen, Solid Urea and Urea
Solution, Lubricating Oil systems, fire fighting systems, cooling systems, water treatment
Systems, Hydraulic systems, .etc\}
2-Installation For Pipe Supports
\{pipe shoe, U bolts and other special supports \}
3-Installation and connecting for Mechanical Equipments and components
\{valves, pumps, heat exchangers, filters, gages etc\}
4-Using most of Pipes Welding methods
\{SMAW, GMAW, GTAW\}.
5-Using International standards and Regulations for Mechanical and Piping work
\{API, ASME, DIN\}
March, 2009 till Oct.2009: Name of company: Energya Construction Company
Engineering & Procurement: IBERDROLA
Client: The Ministry of Electricity and Energy
Project: ISCC- KUREIMAT Power plant
Site location: Kureimat, Bini Swif, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1-Ensuring Construction activities are carried out in accordance with the specification codes, site
procedures and specification for client.
2-Responsible for manufacturing, erecting, Testing, commissioning, maintenance and operating for all ferrous piping
(Carbon steel; st st.; High temp.; low temp) using P&ID'S, Isometrics and planes.
3-Installation for Steel structures (Fabrication and Erection)
\{Pipe Racks-Access platforms-Shelters- Pipe supports\}.
4-Review construction progress with the approved work schedule.
5-Manage and fallow up with client to solving the technical problems.
DEC., 2008 till March2009: Name of company: Energya Construction Company
Engineering & Procurement: Olympic electric
Client: Olympic electric
Project: Construction of main bran factory
Site location: 10th from Ramadan Industrial Zone, Cairo, Egypt
Job Title: Senior Mechanical and Piping Engineer
Duties, Responsibilities: -
1- Leading construction and service team
\{Installation, connecting, testing, commissioning and operating\}
2-Installation for Steel structures (Fabrication and Erection)
\{pipe shoes, U bolts and other special supports \}
3-Using international standards and regulations for mechanical.
4-Review finial documentation.

June, 2008 till DEC.2008: Name of company: Energya Construction Company
Engineering: DAR EL-HANDASA
Client: Energya cables
Project: Construction of Cables Factory
Site location: Rabigh Industrial Zone, Jeddah, (KSA)
Position: Senior Mechanical site manager
Duties, Responsibilities: -
1-Monitors and control the industrial building construction activities.
2- Prepare and monitor electromechanical works.
3-Organize the working procedures in the sites.

SEP., 2007 till June, 2008: Name of company: Energya Construction Company
Engineering & Procurement: Energya Steel Solution
Client: Energya Steel Solution
Project: Construction of Energya Factory
Site location: Rabigh Industrial Zone, Jeddah, (KSA)
Job Title: Senior Mechanical Site Engineer
Duties, Responsibilities: -
1-Erection of the Piping (above / under) ground.
2-Installation for Steel structures (Fabrication and Erection)
\{Pipe Racks-Access platforms-Shelters- Pipe supports\}.
3-Erection of All Equipment's
4-Reinstatment all tasks after testing and commissioning.

APRIL, 2007till SEP., 2007: Name of company: SEA GULL for General Contracting and Supply
Engineering: GECAD GHANA, General Electric (GE France)
Client: The Ministry of Electricity and Energy (GHANA)
Project: Tema thermal Power plant
(GE Frame 9E GT 125 M.W Island and Balance of plant)
Site location: Tema Industrial zone, (GHANA)
Job Title: mechanical site engineer
Duties, Responsibilities: -
1-Installation for all ferrous Equipment's
\{Vessel - towers -Air coolers- stack-Oil heater- Pumps\}.
2-Installation, connecting, testing, commissioning and operating for mechanical
Equipment's and components
\{pumps, purifiers, boilers, gen. sets, heat exchangers, fuel modules, sewage treatment planets, filters,
valves, etc\}
3-Optimize operation in accordance with the production and work.
4-The ability to deal and convince the client.

MAY, 2006 till APRIL, 2007: Name of company: SEA GULL for General Contracting and Supply
Engineering: NEM Netherlands
Client: The Ministry of Electricity and Energy
Project: Cairo North II power plant (Two Boilers250 MW)
Site location: Cairo North II Power Plant Cairo, Egypt.
Job Title: Mechanical Site Engineer.
Duties, Responsibilities: -
1-Coordinate Boilers erections
\{two heat recovery steam boiler) (Combine cycle\}.
2- Managing constructions activities in field erection.
(Steel structure, Stacks, Air filter, Piping, Mechanical alignment, Pumps, Eectromechanically, Boiler panels, Baffles and Equipment's)
3-Preparation of weekly progress report to record usage of material, equipment's, construction
activities carried out manpower, etc

Job role:
Engineering

Education

Helwan University

May 2003

May 2003

Bachelor's degree, Mechanical Power Engineering

Egypt

GPA (percentage): 75%

GPA (percentage): 75%

• B.Sc. in Mechanical Power Engineering 2003. • Helwan University - Faculty of Engineering - EL- Matarya. • Project Subject: Design and construction of wind tunnel. • Project Grade: very good

Skills

ACCESS
Intermediate
ACCESS
Intermediate
CERAMIC
Expert
CERAMIC
Expert
DOCUMENTATION
Intermediate
DOCUMENTATION
Intermediate
ENGINEER
Expert
ENGINEER
Expert
FABRICATION
Intermediate
FABRICATION
Intermediate
HYDRAULICS
Expert
HYDRAULICS
Expert
MAINTENANCE
Expert
MAINTENANCE
Expert
PIPING
Intermediate
PIPING
Intermediate
TESTING
Intermediate
TESTING
Intermediate
TRAINING
Expert
TRAINING
Expert

Languages

Arabic

Beginner

English

Beginner

Memberships

Organization Role

Member

Hobbies and interests

Reading and watch football