mohamed zaghlool زغلول, site supervisor

mohamed zaghlool زغلول

site supervisor

Vodafone

البلد
مصر - القاهرة
التعليم
بكالوريوس, English
الخبرات
8 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :8 years, 11 أشهر

site supervisor في Vodafone
  • الهند
  • أكتوبر 2009 إلى مايو 2012

Working as a site supervisor with E/// project rollout
• Installation of microwave links and TN (2p-6p-20p) on site (installation, management, alignment to acceptance)
• Installation of 2G (6102-2111) on site (installation, integration, to acceptance)
• Installation of 3G (6601) on site (installation, integration, management to acceptance)
• Installation of (SSC 02 cabinet) on site (installation to acceptance)
WORKING AT Citex
(oct\2009) till (may\2012)
Working as a site supervisor with E///Project
• Rollout E/// Vodafone (in door-out door)
-Transmation (ML-TN 2P-6P-20P)
- 2G (RPS 2206-RPS 2106)
- 3G (RPS 3206-RPS 3106-3418-3518)
- BPS 6500
(installation, integration, acceptance)
• TX CLEAN UP
• DATA CONECTION
Working as a site supervisor with HUAWEI project rollout
• (installation, integration, acceptance)
• MECRO WAVE (0.3 - 0.6 - 1.2 - 2.4) alignment crous diversity Working as site supervisour. Installation, management and maintenance for SIAE microwave links
I'm gaining from this job the following: • Installation of microwave links on site (installation, standardization, management, alignment -cutover to acceptance)
Working in PDH (1+1 and 1+0)

Survey, installation, management and acceptance at (E//- SIAE)

team leader في Glextel
  • الهند
  • يناير 2004 إلى أكتوبر 2009

Working at Glextel
(Jan \2004) till (oct\2009)
Working as a team leader with E///Project
• 3G EXP (add E1)
Increasing capacity of 3G (installation, integration, acceptance)
• 2G EXP
Increasing capacity of 2G (installation, integration, acceptance)
• MODERNIZATION
BPS 2000I TO BPS 6500
• Rollout E/// Vodafone (in door-out door)
-Transmation (ML-E, ML-C, ML-MBH)
- 2G (RPS 2206-RPS 2106)
- 3G (RPS 3206-RPS 3106-3418-3518)
-BPS 6500
(installation, integration, acceptance, alignment)
• HUP CLEAN UP
• AUDIT ERICSSON
Working as a team leader with HUAWEI project rollout
(installation, integration, acceptance)
MECRO WAVE (0.3 - 0.6 - 1.2 - 2.4) alignment crous diversity

Working at Vodafone Egypt

team leader في ML-E & ML-C
  • يوليو 2003 إلى يناير 2004

(jul\2003) till (Jan\2004)
Training as a team leader with E/// project
Installation of microwave links on site (installation -management - cutover to acceptance)
• ML-E & ML-C
• Installation of 2G (2206-2106) on site (installation, integration, to acceptance)
• Installation of PPS (6500-PPS 02-ppS 2000-PPS 2000I) on site (installation, management to acceptance)
Survey, installation, management and acceptance at (E///)


❖ course


Management and soft skills course
• Workshop courses certified from Connex
• Communication.
• Negotiation.
• Time management.
• Problem solving and decision making.
• Team building.
• Organizational behavior.
• Report writing.
• Professional etiquette.
• Rise towers training course at Egypt electrical company
• Microwave links course at Armed forces
• Safety skills
• Risk Assessment course:

الخلفية التعليمية

بكالوريوس, English
  • نوفمبر 1996

Driver license: valid (November 1996) - Industrial Technical Diploma ❖ language • Arabic: Native • English: good

Specialties & Skills

E-CARRIER
ETIQUETTE
MAINTENANCE
MICROWAVE
PROBLEM SOLVING
REPORT WRITING