Involved in all Civil Projects Handeld by our Departemnt.
Responsibilities and Achievements:
* Prepared plans and layouts for Manpower, Equipment and Materials as per Drawings and Client Requirement.
* Preparing Budget as per Total Costs and expected Benefits.
* Provided drafting support to a Civil Engineering Staff.
Project : Debottlenecking of GC-17 at West Kuwait
Project Information:
* Main Contractor : PETROFAC .
* Owner : Kuwait Oil Company (KOC).
Job Description:
* Project Scope of work: Demolishing of the existing plant with re-routing of the existing underground utilities, Construction of new Substation. Construction of new Control Room, Excavation of Pipeline/Cable Trenches including open cut and trenchless road crossings (HDD/MT), Concrete Culverts and Sectionalizing Valve Station, Dewatering System at Marshy Areas including Pre casting and installation of Marshy Blocks, Pipe Racks, Sleepers, Platforms, Equipment Foundations and Shelters, Concrete Grade Slabs, Culverts and Trenches, Structural Steel Works and Asphalt, Gatch Roads and Walkways.
Project Name : New Gathering Center GC-29 & LHFOD Project at North Kuwait
Project Information:
* Main Contractor: PETROFAC.
* Owner : Kuwait Oil Company (KOC).
* The main Civil Works of this Project was not awarded to our Department, so our scope was preparation and construction of subcontractor Machine Foundations and workshops at Project Construction Yards.
Job Description and Responsibilities:
* Study Drawings of the Subcontractor Structures (Workshops and Equipment Foundations), calculate of Bill of Quantities, Estimate the cost of required Material, Manpower and Equipment, Plan the period of Construction and Finalize the Quotations and obtain Manager's approval.
* Prepare Work Schedule and required resources as per the requirement of the Work Schedule.
* Handle procurement activities relating to contracts and sub contracts in accordance with Company Procedures and Procurement department activities.
* Monitor and assign work to Site Engineers / Supervisors about work scope, sequence of work, HSE requirements, Quality requirements and Material to be used.
* Executing work at site, pushing the progress as per Schedule and ensuring that work done as per drawings and as per Specification requirements.
* Undertake team briefings and inception activities to ensure all aspects of work are understood by all the concerned.
* Preparing of Progress Reports to finalize the Invoices on Monthly Basis.
* Find out and calculate the variations and additional works in order to prepare the required documents for claiming the extra works.
Project Name : Installation of New Fire Water Tank at GC-17, 27 & 28 in West Kuwait Area
Project Information:
Owner : Kuwait Oil Company (KOC).
Scope of Work : Construction of RCC Foundation for 6 Tanks with different
Diameters varying from 36 to 46 meters.
Job Description and Responsibilities:
Study Drawings of 6 Tanks, Workout Bill of Quantities, estimate the cost of required Material, Manpower and Equipment, plan the period of Construction and Finalize the Quotations and obtain Manager's approval.
Prepare work Schedule and required resources as per the requirement of the work schedule.
Project Name : New Gathering Center GC-30 at North Kuwait
Project Photographs:
Project Information: Main Contractor : Larsen & Toubro Kuwait Construction
PMC : AMEC Foster Wheeler.
Owner : Kuwait Oil Company (KOC).
Scope of Work : Construction of RCC Foundation for 12 Tanks with different
Diameters varying from 30 to 56 meters.
Job Description and Responsibilities:
Study Drawings of 12 Tanks, work out Bill of Quantities, Estimate the cost of required Material, Manpower and Equipment, Plan the period of Construction and Finalize the Quotation and obtain Manager's approval.
Prepare work Schedule and required resources as per the requirement of the work schedule.
Support Material Control Department and Procurement to reach to the proper supplier and subcontractor with the required documents and approval.
Handle procurement activities relating to contracts and sub contracts in accordance with Company Procedures and Procurement department activities.
Monitor and assign work to Site Engineers / Supervisors about work scope, sequence of work, HSE requirements, Quality requirements and Material to be used.
Providing required details to QC people to arrange the required documents to get Material and Subcontractor Approvals.
Undertake QC reporting interaction with other departments of Company and clients to assure production schedules and deliveries are met.
Support Manager to Attend the Client/Manager meetings and discuss the work progress and schedule.
Assist the Project Manager in preparation of Sub Contract agreements and to recruit Manpower for his area of various disciplines.
Preparing Budget as per Total Costs and expected Benefits.
Executing the work at Site and push the progress as per Schedule and ensure that work done as per drawings., as per Specs. and requirement.
Instruct and Advise site Engineers and Supervisors with corrective and proper actions as per site conditions and to get satisfaction of the Client.
Undertake team briefings and inception activities to ensure all aspects of work are understood by all the concerned.
Preparing of Progress Reports to finalize the Invoices on Monthly Basis.
Monitor and control expenses related to Project Work and ensure organizational forecasts and budget are met for these expenses.
Ensure safety standards and procedures are implemented and followed in accordance with contract requirements and Client / Company guidelines.
Act as a Liaison with Contractors and Client managing any work interfaces and enhancements to project scope.
Find out and calculate the variations and additional works in order to prepare the required documents for claiming the extra works.
Review and evaluate technical submittals and shop drawings prior to submission to Consultant and Client according to required project standards.
Personal Achievements:
Adding more benefit to the project by finding out and calculate the variations and additional works in order to prepare the required documents for claiming the extra works.
Saved 8% on supply costs by working closely with the Shuttering Formwork System suppliers to plan 2 sets of material can be used for all of the 12 Tanks, which can save the time of formwork system fabrication for 10 Tanks as well as the manpower by avoiding re-assembly and directly installation of the formwork system after de-shuttering.
Saved the total cost of scaffolding erection by adding scaffolding bracket to the formwork system for concrete pouring purpose and fixing of embedded items.
Performed the key role with Client for planning and executing site works.
Project Name : Construction of Remote Header Manifold for Wara Producer Wells at
GC-7 South Kuwait Area.
Project Information:
Owner : Kuwait Oil Company (KOC).
Scope of Work : Construction of RCC Foundation for Remote Header Manifold,
Floor Concrete Slab and Concrete works of Pipe Rack Foundations,
Flow meter Foundation, Pig Launcher Foundation, Anchor Block,
Pig Launcher Drain Pit, Jib Crane and Operation Pad.
Project Photographs:
Job Description and Responsibilities:
Study Drawings, work out Bill of Quantities, Estimate the cost of required Material, Manpower and Equipment, Plan the period of Construction and Finalize the Quotation and obtain Manager's approval.
Prepare work Schedule and required resources as per the requirement of the work schedule.
Support Material Control Department and Procurement to reach to the proper supplier and subcontractor with the required documents and approval.
Handle procurement activities relating to contracts and sub contracts in accordance with Company Procedures and Procurement department activities.
Monitor and assign work to Site Engineers / Supervisors about work scope, sequence of work, HSE requirements, Quality requirements and Material to be used.
Providing required details to QC people to arrange the required documents to get Material and Subcontractor Approvals.
Undertake QC reporting interaction with other departments of Company and clients to assure production schedules and deliveries are met.
Support Manager to Attend the Client/Manager meetings and discuss the work progress and schedule.
Assist the Project Manager in preparation of Sub Contract agreements and to recruit Manpower for his area of various disciplines.
Preparing Budget as per Total Costs and expected Benefits.
Executing the work at Site and push the progress as per Schedule and ensure that work done as per drawings., as per Specs. and requirement.
Instruct and Advise site Engineers and Supervisors with corrective and proper actions as per site conditions and to get satisfaction of the Client.
Undertake team briefings and inception activities to ensure all aspects of work are understood by all the concerned.
Preparing of Progress Reports to finalize the Invoices on Monthly Basis.
Monitor and control expenses related to Project Work and ensure organizational forecasts and budget are met for these expenses.
Ensure safety standards and procedures are implemented and followed in accordance with contract requirements and Client / Company guidelines.
Act as a Liaison with Contractors and Client managing any work interfaces and enhancements to project scope.
Find out and calculate the variations and additional works in order to prepare the required documents for claiming the extra works.
Review and evaluate technical submittals and shop drawings prior to submission to Consultant and Client according to required project standards.