Procurement Engineer
Diversified Lines Petroleum Services Est (DLPS
Total years of experience :9 years, 0 Months
Float the enquiry for all Construction, Mechanical and Electrical Packages.
•Collect the quotation and make the Technical Bid Evaluation document and submit to the Design Contractor.
•Get the clarification from the Design Contractor and discussed with the vendor close all the points.
•Then discuss with the vendor for the price and delivery to place the Purchase order.
•Arrange the sub-contracting as per the site requirement.
•Once PO is place get the NMR’s, MTC and other technical document and get approval from client.
•Material follow up from vendor till materials clear from VID
Procurement, Logistic and expediating of following:
•Gas & Oil Modular Skids
•Gas & Oil Modular Skids (45 Skids) - Haradh/ khurais location, Saudi Aramco.
•Gas & Oil Modular skids (73 Skids)- Haradh / Khurais / Aindar Location, Saudi Aramco.
•Corrosion Inhibitor Injector packages
•Gas Oil separation plant, Tanajib Offshore, Saudi Aramco (3 Nos).
•Injection Skid (1 No) Petro Rabigh, Saudi Aramco.
•Corrosion injection system complete package (2 Nos) -Uthmaniya Stores, Saudi Aramco.
•Chemical injection skid (1 No)-Tanajib Offshore Platform, Saudi Aramco.
•Corrosion inhibitor units (80 Nos).
•Metering Skid
•Metering Skid (3 x 6 streams) along with Bi -directional Prover for Rehabilitation of AMT Project. (Replacement of 6 crude Streams and prover pipe spools).
•Up gradation of Metering Control System at Site -Saudi Aramco, Jeddah Refinery.
•Up gradation of Metering Control System at Site -Saudi Aramco, Ras Tanura Refinery.
• Surge Relief Skid
•Surge Relief Skids for Wasea Bulk Plant -Saudi Aramco.
•Surge Relief Skids - BR. CAT International - Abqaiq Pipeline capacity Project.
•Surge Relief Skids - BR. CAT International - Abqaiq Pipeline capacity Project.
•Truck Loading Skids (Diesel /Fuel Oil /LPG/ Asphalt loading in truck)
•Diesel Loading Skids (2 Nos) - Ras Tanura Refinery, Saudi Aramco, Saudi Arabia
•16.Diesel /Fuel oil /LPG/ Asphalt (7 Nos) -Jeddah Refinery, Petrofac, Saudi Arabia
• Pre-conditioner Skid & Release Agent skid
•Includes Heat Exchangers /Pressure vessels /release agent tanks Jazan, SANDVIK
•Cladding of Pipes and Fittings:
•Cladding Piping for Haradh & Hawiyah Field Gas Comperssion.
•Cladded Fitting for Free Flow Abqaiq Store.
•Cladded Fitting & Spectacle Plates for Hawiyah Unayzah gas reservoir storage plant.
•Cladded Fitting & Spectacle Plates for Uthmaniyah Maintain Potentian Plant.
•Shell & Tube Heat Exchangers
•18.Shell & tube Exchangers (Lean rich methanol) (60 Nos) - Jazan IGCC project, Saudi Aramco Shell & tube Exchangers (Lean Amine trim Chillers) (04 Nos)-UTE TR Fadhili Project, Saudi Aramco
•Shell & tube Exchangers (Light Slop Vaporizer) (10 Nos)-Jazan IGCC project, Saudi Aramco
•Pre-conditioner Skid.
•Exchangers - MEG Re-Boilers, UTE TR Fadhili Project, Saudi Arabia
•Scraper Trap
•Fabrication & supply of scraper traps (Pig launcher & receiver for sour crude) for Tanajib refinery.
•Scraper launcher, SBCL-2 pipeline Project, Saudi Aramco
•Scraper launcher, HRML -A Remote Header Project, Saudi Aramco
•Pressure Vessel & Site Construction Tanks
•HTF Expansion tanks (8.3 X 3 M)-Saudi Electric Company
•Scrapper receiver drain Vessel (28M X 4.5 M)-Abqaiq, Saudi Aramco
•Desander vessels (12M X 5M)- Harmaliyah, Saudi Aramco
•Pressure vessels (52 M X18 M)- L &T, Saudi Arabia (On Going)
Job Responsibilities:
•Procure all material and consumables as per the project requirement.
•Ordering of materials as per technical data sheet, SAMSS and ASME standards.
•Negotiate with supplier to match the price within the budget.
•Making of price comparison chart between the supplier and negotiate with them for the best possible delivery and payment terms.
•Get the technical quotation for engineering review to select the best suitable product.
•Monitoring the consumable inventory and re-fill on time.
•After placing the order follow up with the supplier for the material and other technical documents.
•Once the material is ready arrange for freight forwarder, collection, custom clearance and delivery till store.
•Follow up for the NMR document and SPDP document.
•Organize the meeting between Supplier, Engineering team and project engineers for the clear understanding of required components.
•Before shipping the material get the soft copies of shipping documents from vendor to avoid delays.
•Act quick and responsible to procure missed out MTO materials on time.
•Expediting of LC and other advance payment with finance to avoid delays.
•Maintain good relationship with the vendor.
•Evaluate vendor performance in annual basis.
Study the detail drawing and arrange the raw material as per the requirement.
•Make the Cutting layout to avoid the wastage.
•Plan the production schedule to match the delivery.
•Check the quality of the fit up and welding.
•Check the final dimension for Tanks, Chimneys, bunkers, Structure, and Pipelines.
•Painting, packing and Loading will be monitored.
Study the detail drawing and monitor the production as per the provided drawing.
•Check the quality of production as per the given standard.
•Check the final dimensions of tanks, bunkers chimneys, ducts and pipelines.
•Painting, packing and loading will be supervised.
•Maintain the production as plan to achieve the delivery date.
Arrange films for the radiography testing.
•Shoot the RT spots.
•Develop the film and record the flaws in the joint and casting materials.
•Calibrate the Ultrasonic machine as per the requirement.
•Test the welded joint and record the flaws and cracks.
Professional Excellence:
•Appreciation from M/S Gulf Steel Works for delivery 80 Chemical injection Skid on time in 2016.
•Appreciation from M/S Gulf Steel Works for delivery 60 Heat exchanger on time in 2017.
•Received Performance Appraisal 86% in March 2020.