Instrument Field Operator
Sarens Nass
Total years of experience :13 years, 4 Months
Worked As An Instrument Field Operator Role Focused On Supporting Key Client Accounts Projects Complete Technical Trouble Shooting And Field Maintenance Understanding Of Well Site And Facility Shutdown Checks And Inspections Understand High Level Reporting Delineation Regulatory Requirements Measurement Best Practices Etc Proficient Problem Solver With Strong Attention To Detail Good Knowledge Of Process Systems In Regards To Conventional Oil & Gas Good Electrical & Instrument And Logical Reasoning Skills Effective Communication Both Verbal And Written And Reading Skills Working In A Strong Team Work Environment Work In Vicinity Of High Pressure Lines And Electrical Systems Instruments Maintenance Calibration And Troubleshooting Of Different Instruments Good Experience In The Plant Maintenance Knowledge And Good Experienced In The Management Plant Instrument Maintenance Well-Known With The Plant Running Predictive Preventive Breakdown And Corrective Maintenance.
I Have Good Knowledge And Experiences Related Our Jobs Every Day Receives Project Documentations And Understands Scope Of Work Related To His Discipline Report To Commissioning Team Leader As Per Project Organization Chart Lead A Team To Undertake Commissioning Activities In Big Projects Interfaces With Other Disciplines To Ensure Integration Of Activities Implement And Test The Subsystems As Per Project Commissioning Test Sheet Preparation Of Method Statements Procedures And Routines Where Required Interface To ward Pre Commissioning And Company Personnel Report And Work Progress Bringing To Notice Potential Or Delays And Recommends Solutions Assist Database Preparation For Pre Commissioning Status Index And Commissioning Technical Data base.
Co-Ordinate Monitor And Verify The Commissioning Activities Of Project Contractors Associated With E & I And Also To Coordinate With The Engineering And Operations Teams
Involve in calibration of field instrument like Rosemount. Smart
Family protocol transmitter, level transmitter, Flow transmitter Level transmitter, Control valve etc. Inspection of installation conduct, cable tray, cable lying from junction box to field instrument and field junction box to (RFI) as per project specification area, Classification requirement.
I Have Good Knowledge And Experiences Related Our Jobs Every Day Receives Project Documentations And Understands Scope Of Work Related To His Discipline Report To Commissioning Team Leader As Per Project Organization Chart Lead A Team To Undertake Commissioning Activities In Big Projects
Inspection And Testing Of Loops From Field Instrument Control Room DCS Signal Working As Per Data Based Check The Alarm Condition And Status Changing Of Digital And Analog Instrument Monitoring And Inspection Their Worked Performed By The Construction Group Conforms To The Approved Construction Drawings Asp Per Project Specification And Standards.
Knowledge E & I Requirements For Recompletion Of Construction And Testing Of All Instrument Installations Calibration Loop Checking And Pre Commissioning Procedure Knowledge And Experience Of Testing Pre Commissioning & Commissioning Start Up Shut Down Turn Over Practies Cabinet installation it’s cabling, L.V & H.V switch gears like PCC, MCC, EDB, LDB, Transformers etc. Air compressors, Instruments installation & its cabling, navigation lighting, termination of transmitters, Nucleonic level transmitter, control valves, pressure Transmitters, solenoid valves etc. Raising punch lists for all faults found which are not as per standards specs of the project.
Related Instrument