MOHAMMAD SAUD FAROOQUI, Associate Chief Engineer

MOHAMMAD SAUD FAROOQUI

Associate Chief Engineer

Technip Energies pvt. Ltd.

Location
India - Delhi
Education
Bachelor's degree, Mechanical Engineering
Experience
19 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 11 Months

Associate Chief Engineer at Technip Energies pvt. Ltd.
  • India - Noida
  • My current job since April 2011

Detailed Work history with Technip Energies-India

1. Project : ROGC-DBN Revamp Project, Reliance J3 Program-C2 complex, Jamnagar, India
Period : Jan 2022- Till date
Client : Reliance Industries Limited, India

Working as Piping lead for detailed engineering design for ROG Cracker-Revamp units and C3 Splitter & C5-C9 greenfield units, Jamnagar, India

Responsibilities:
• Leading a team of 35 engineers & designers.
• Preparation of Man-Hour estimations, preparation of man power mobilisation plans.
• Preparation of equipment layout and piping plans for Revamp units and green field units.
• Participation in layout reviews with all disciplines and client to review constructability, maintenance and operation requirements for new and existing equipment in the plant.
• To ensure that new equipments to be planned in brownfield plant to comply all HSE policies, procedures, guidelines in line with international standards, client guidelines and there should be minimum change in existing facilities, AG pipe routings and UG networks.
• Review of Tie-in location on existing line and to ensure minimum modification in existing AG line and UG network
• Planning, budgeting & control of piping engineering deliverables
• Participating in Risk assessment meetings and updation of risk register for piping department.
• Updation of piping activities progress in Janus.
• Preparation of piping DCI along with details related activity manhours/weightages and deliverables dates
• IDC commenting and review of vendor documents
• 3D Model Checking & Modelling using SP3D.
• Conducting & responsible for 3D Model Reviews with clients.
• Coordinating between disciplines for Closure of model review tags
• Resolution of piping engineering technical queries/issues raised either by task force or client.
• Responsible for direct answering to the client during Kick Off, Design review and comment closure meetings.
• Involved in MTO activities, to provide timely bulk MTO’s as per project schedules and to provided detailed Inch dia and inch meter to access piping work and to mobilise subcontractors to site for construction.
• Review & checking of isometrics

2. Project : APCI Hydrogen SM Reformer World Energy Paramount USA
Period : March 2020- Till date
Client : Air Products, USA

Working as Piping lead for detailed engineering design for Steam Methane Reformer, Paramount

Responsibilities:

• Complete detailed design and engineering of Reformer Inland.
• Responsible equipment layout and piping plan SM Reformer.
• Preparation of Man-Hour estimations, preparation of man power staffing plans
• Detailed engineering for Modules including weights, module piping quantities, piping ID’s, module dimensions etc.
• Review of Modules GA and ensuring compliance to module project philosophy
• IDC commenting and review of vendor documents
• Review/planning & checking of IFC isometrics.
• Conducting & responsible for 3D Model Reviews
• Responsible for direct answering to the client during Kick Off, Design reviews and comment closure meetings.
• Involved in MTO activities, to provide timely bulk MTO’s as per project schedules

3. Aramco (Svante) C02 Capture Process Skid, Saudia Arabia.

Feasibility study and skid layout development for Aramco CO2 capture unit

Responsibilities:

• Preparation of equipment layout
• Preparation of MTO and SOQ of piping items

4. Project : EPCC6-Hydrogen Generation Unit(HGU)
Period : Jun 2018 to July 2019
Client :
5. Project : Reliance-J3 Program-C2 Complex-ROG - Demo Furnace
Period : Jan 17 to Jun 2018
Client : Reliance, Industries Project : Reliance-J3 Program-C2 Complex-ROG Cracker
Period : From Nov 13 to Dec 2016

Sr. Executive at Siemens power pvt ltd
  • India - Gurgaon
  • November 2010 to March 2011

Project : UNOSUGEN Combined Power Plant, Gujrat

Main job responsibilities includes :
1) Preparation/ checking of piping deliverables
2) Providing guidance to team to follow project/ client requirement.
3) Checking of piping model so that modeling be done as per project instructions.
4) Clash report checking

Engineer Piping at SK E&C PVT LTD
  • India - Gurgaon
  • May 2010 to November 2010

Project : Jurong Aromatics Complex Project, Singapore

Worked as area lead for Sour Water Surge Unit

• Involved in preparation of Isometrics for MTO.
• Detailed design and development of Equipment & piping layout
• Equipment and piping modelling in S3D
• Review and commenting vendor drawings and commenting on civil IDCs

Associate design Engineer at Fluor Pvt ltd
  • India - Gurgaon
  • July 2008 to April 2010

Project: Marathon Detroit Heavy Oil Upgrade Project- Michigan (USA)

Worked as Area Lead Engineer(Handling a group of engineers and designers) for Coker Area (GR unit).

• Detailed design development of equipment and piping layout for Gas recovery unit.
• Squad Checking of Various drawing and document of different disciplines.
• Interaction with various disciplines, prime office and vendor.
• Involved in client model reviews and tag closure activity.
• Piping & Equipment modeling on PDS.
• Checking of 3D model using Smart Plan Review and Clash resolution.
• Study of steam tracing manifolds and line routing.


Project: Total Deep Conversion Refinery Project- Port Arthur, USA

Worked as Area Lead Engineer for PSA/Cogen Unit.
• Equipment and piping modeling in PDS as per process requirement and various project and international standards.
• Squad check of civil/structural and various vendor documents.
• Checking/ Preparation of Nozzle orientation, platform & ladder drawings.
• Rack design which includes rack width calculation, number of rack tiers & preparation rack load data for civil loading.
• Checking/Modeling support as per the project support standard in PDS.
• Checking/Modeling of Miscellaneous pipe supports (MPS).
• Detailed study and checking of piping and equipment layout as per project standards/requirements and international code & standards.
• Checking/Preparation of General Arrangement drawing in PDS drawing manager.
• Checking of isometrics, vendor documents, and equipment nozzle reports.
• Checking of 3D model using Smart Plan Review and Clash resolution.

ASSISTANT ENGINEER PIPING at GS ENGINEERING& CONST.
  • India
  • April 2007 to July 2008

Responsibilities:
• Involved in the tendering for prestigious projects like
 AN & MMA Project, Indonesia
 OSOS PBT Project (BDO & Acetal Unit), Yanbu-Saudi Arabia
 MRPL Phase- III Refinery Project (CDU/VDU Units) Mangalore- India
 Arabian Chlor Vinyl Project (EDC Unit), Saudi Arabia
• Preparation of tentative line routing and preparation of isometrics for tendering MTO calculation.
• Checking/ Preparation of Pipe Rack Load Data and civil information drawings.
• Checking/ Preparation of Nozzle orientation, platform & ladder drawings.
• Checking/ Preparation of Piping study drawings.
• Checking of 3D model using Smart Plan Review and clash resolution.
• Checking of Piping Deliverables like GAD, Isometric, MTO, etc.

MECHANICAL ENGG. at DESEIN PVT LTD
  • India
  • June 2004 to March 2007

Responsibilities: Worked as a Project Engineer (Mechanical) in Mechanical department of EPC division.
 Review/preparation of drawings/ documents, which includes
• Reviewing of drawings and documents related to piping such as Piping layout, quality plans, data sheets of valves and components, inspection reports etc.
• Review of piping material specification.
• Preparation of valve data sheets for EPC projects.
 Project/Engineering Coordination; which includes:
• Project Scheduling and updation on Prima Vera Project Planner.
• To monitor the project schedule periodically and ensure timely delivery of material at site.
• Vendor Approval & witness inspection & testing at vendor’s site.
• To prepare fortnightly, monthly and six monthly report of site progress.
• To furnish necessary data at appropriate stages to raise invoices for payments against the progress of project.

Education

Bachelor's degree, Mechanical Engineering
  • at ALIGARH MUSLIM UNIVERSITY
  • June 2004

PASSED B.TECH IN MECHANICAL ENGINEERING WITH 69.16%

Specialties & Skills

Modeling
Preparation
Refinery
B. TECH MECHANICAL+ PROCESS PIPING COURSE
PDS PIPING SOFTWARE
SPR and Navis works

Languages

English
Expert