• HVAC Construction at site (offshore facility).
• Managing the Subcontractors work and workforce.
• Coordinating at site for MEP, Structural & Fire Fighting disciplines.
• Area Authority for Permit to Work & Safety implementation at work site.
• Monitoring the work progress of the subcontractor and expediting as necessary.
• Reviewing Subcontractor planned activities with 30 days look ahead and making necessary arrangements to provide work front.
• Managing the Material resources at site and keeping a track of the timely requirement.
• Resolving the site construction issues in coordination to other disciplines.
• Regularly inspecting the Subcontractor works for the compliance with the Project Specifications.
• Raising Request for QC Inspection (RFI) for the completed works.
• Supporting the Preservation team for HVAC related preservation activities.
• MEP coordination in 3D model (for all the services including for structural and architectural coordination) and with the Site team
• Heat Load Calculations using Carrier HLC Software.
• Preparation and releasing of the HVAC Drawings to shop.
• 3D Model reviews with the Client and Main Contractor representatives.
• Supporting and guiding the Operations team for the proper installation of all services.
• Site Visits for resolving the site installation related issues.
• Monitoring of the Site Installation works.
• Ensure installation works in line to Project specifications and standards.
• Carryout duct leak testing, Pipe testing, work inspection for installation etc.
• Weekly meetings for Project Engineering progress with Main Contractor and Client representatives.
• Preparation of Weekly reports for Project with Area of Concern, Action Trackers etc. in coordination with Structural, Architecture, Electrical, Instrumentation, Telecom apart from HVAC, Plumbing and NOVEC.
• NOVEC 1230 system installation, drawings preparation and MTO preparation.
• Duct Designing and ESP Calculations.
• Preparation of MTO’s, Clarifications for Enquiries.
• HVAC Equipment Selection like Chiller, AHU, FAHU, FCU, DX Type etc.
• Site survey for new Projects data collection and new enquiries.
• Heat Load Calculations using Carrier HLC Software.
• Preparation and submission of MAR’s.
• Duct designing and ESP calculations.
• Preparation and releasing of the HVAC Drawings to shop
• Site Installation activities.
• Flushing and Pressure Testing of CHW Piping.
• Monitoring Project Progress in line to Project schedule and meet the requirements.
• Pre-commissioning and Commissioning of HVAC system.
• Site survey for new Projects and Enquiries.
• Maintenance of HVAC System.
• Refurbishment works of HVAC.
• Manpower allocation and Material resources management at site.
• Conducting Inspections at site along with Consultant and Client.
• Monitoring the Installation works at Project site.
• Allocation of manpower and various resources as required.
• Meeting with the clients for discussing project progress and schedule.
• Material Procurement.
• Preparation of BOQ/MTO.
• Heat Load Calculations using carrier HAP.
• ESP Calculations & Duct Sizing.
• Pre Commissioning.
• As Built Drawings preparation and submission.
Mechanical Engineering Graduation completed in June 2010. Prepared and presented Project for the Academic Final Year on "EMISSIVITY of the Objects" determining the heat transfer throught the surfae objects through Convection and Radiation and Calculated the amount of heat absorbed and raidated through Temperature measurements and heat radiation graphs.