Total Years of Experience: 15 Years, 1 Months
June 2011
To Present
Inspection Engineer
at SABIC
Location :
Saudi Arabia - Jubail
Inspection of inservice and newly fabricated static equipment.
Giving inspection strategy of piping and static equipments using RBI methodology through Meridium.
Support maintenance and operation in technical issues and providing the appropriate recommendation to resolve that issue.
Giving inspection strategy of piping and static equipments using RBI methodology through Meridium.
Support maintenance and operation in technical issues and providing the appropriate recommendation to resolve that issue.
June 2010
To January 2011
QC engineer
at JGC Gulf International Ltd
Location :
Saudi Arabia - Khobar
• Coordinates inspection and testing activities of procured equipment and materials for the project.
• Reviews requisitions of equipment and materials intended for a specific project and incorporates inspection and testing requirements as required by the applicable Client specifications and related International Codes and Standards.
• Performs Vendor documents reviews.
• Participates in the procurement Kick-Off Meetings (KOM). Clarifies issues related to the inspection and testing requirements.
• Compiles, prepares and issues Inspection Assignment Packages (IAP).
• Initiates Request for Inspection (RFI) to satellite offices.
• Conducts Pre-Inspection Meeting PIM with In-Kingdom (IK) Vendors for procured equipment and materials or delegates same to assigned inspector.
• Inspect materials and processes with IK Vendor shop .
• Conducts weekly meeting with clients to discuss the QC issues.
• Reviews requisitions of equipment and materials intended for a specific project and incorporates inspection and testing requirements as required by the applicable Client specifications and related International Codes and Standards.
• Performs Vendor documents reviews.
• Participates in the procurement Kick-Off Meetings (KOM). Clarifies issues related to the inspection and testing requirements.
• Compiles, prepares and issues Inspection Assignment Packages (IAP).
• Initiates Request for Inspection (RFI) to satellite offices.
• Conducts Pre-Inspection Meeting PIM with In-Kingdom (IK) Vendors for procured equipment and materials or delegates same to assigned inspector.
• Inspect materials and processes with IK Vendor shop .
• Conducts weekly meeting with clients to discuss the QC issues.
October 2008
To June 2010
QC inspector - piping
at Mohammad Almojil Group
Location :
Saudi Arabia - Khobar
TASNEE - Mechanical Engineer
• Worked in a SHUT DOWN for TASNEE Company and I had a recommendation certificate done by FLUOR Arabian Ltd. Company.
• Arranged the requirements for the shut down that involves Job Cards.
• Formed level 5 which includes all activities that have to be done along turnaround, pre and post. I also tracked the activities during shut down by daily reports with Project Control Department (PCD).
SASREF Project (ULSD) - Mechanical Engineer
• Work in this project with Engineering Department in piping discipline and I performed our duties that include solving problems which delay the project progress in piping, in general, such as misalignment, complication in piping as per drawing, obstacles in fabrication such as scaffolding.
• Monitor with piping foreman & once I get like these problem, I try to solve in the site & then raise QUERY, approved from Engineering Manager, to the client by the that problem & my suggested solution.
MMG Steel Factory - Quality Control Inspector - Piping Inspector.
09th September 2009
• Inspect materials received with MRR (material receiving report) & by RFI (request for inspection) as per ASME SEC II and client specification.
• Inspect fabricated piping spools, flanges and fittings in accordance with client specifications and international codes and standards such as ASME B31.3
• Inspect piping fit-up and give the approval to Production Supervisor for beginning welding operation.
• Work on reviewing packages of Spools Production Order SPO before releasing to project site to compare its details with drawings and specifications.
• Last period, I was leading SAP system changes as a leader of Master Data Team of in QA/QC department. I was leading the Quality Management team (QM) to adapt the procedures and modifications generated & I coordinate with all associated departments to reach the optimum solutions.
• Worked in a SHUT DOWN for TASNEE Company and I had a recommendation certificate done by FLUOR Arabian Ltd. Company.
• Arranged the requirements for the shut down that involves Job Cards.
• Formed level 5 which includes all activities that have to be done along turnaround, pre and post. I also tracked the activities during shut down by daily reports with Project Control Department (PCD).
SASREF Project (ULSD) - Mechanical Engineer
• Work in this project with Engineering Department in piping discipline and I performed our duties that include solving problems which delay the project progress in piping, in general, such as misalignment, complication in piping as per drawing, obstacles in fabrication such as scaffolding.
• Monitor with piping foreman & once I get like these problem, I try to solve in the site & then raise QUERY, approved from Engineering Manager, to the client by the that problem & my suggested solution.
MMG Steel Factory - Quality Control Inspector - Piping Inspector.
09th September 2009
• Inspect materials received with MRR (material receiving report) & by RFI (request for inspection) as per ASME SEC II and client specification.
• Inspect fabricated piping spools, flanges and fittings in accordance with client specifications and international codes and standards such as ASME B31.3
• Inspect piping fit-up and give the approval to Production Supervisor for beginning welding operation.
• Work on reviewing packages of Spools Production Order SPO before releasing to project site to compare its details with drawings and specifications.
• Last period, I was leading SAP system changes as a leader of Master Data Team of in QA/QC department. I was leading the Quality Management team (QM) to adapt the procedures and modifications generated & I coordinate with all associated departments to reach the optimum solutions.