محمد البري, infrastructure engineer.

محمد البري

infrastructure engineer.

Saudi Arabian Parsons limited

البلد
مصر - الإسكندرية
التعليم
بكالوريوس, Civil engineering
الخبرات
14 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 8 أشهر

infrastructure engineer. في Saudi Arabian Parsons limited
  • المملكة العربية السعودية - الرياض
  • يناير 2013 إلى يناير 2016

2016 at the MOH Alkharg site as infrastructure engineer.
Project description
The project includes of construction all utilities for the site about 2.5 million m2 by length about 40 km including ( roads - potable water - irrigation line - sewer line - storm water - irrigation tank - sewer pump station )
My role description
• I was one from the team who making Revision for all drawing and document for the contract before the contractor starts the execution
•Revision all shop drawing and all data sheet for every utility from the contractor (Roads - storm water - sewer-Irrigation tank- telecom-potable water ) before the execution start
•Daily field supervision on actual execution of works according to drawings and specification and Carry out scheduled inspections to ensure that works are constructed in accordance with the contract documentation and method statement
•Coordinate with the inspectors for making inspection for every activity on the site (WIR )
•Taking the report and photo from the inspectors and prepare daily reports for inspection item and reported to my senior
•Link of site in YouTube https://youtu.be/8BwVWymrnkc

civil engineeer في Ministry of housing
  • المملكة العربية السعودية - الرياض
  • فبراير 2010 إلى فبراير 2013

• Design and revision all drawing for execution roads surface drainage
• Calculate the quantities required for leveling the site (cut- fill)
• Making for every site (longitudinal section -cross section- details of pavement and curbs) for every road
• design of storm drainage network(general layout plan - profiles - all details required for execution)
• Calculate the run off and intensity for every site and also the velocity in the pipe line and discharge for the pipeline
• prepare BOQ .and specifications for every site
• A list of some projects that I have designed during my work at the Ministry of Housing for the internal road network.

site engineer في construction of
  • الإمارات العربية المتحدة
  • أبريل 2009 إلى أغسطس 2009

take all the permission from Abu Dhabi Municipality
•Mange subcontractors, problem solving and filed issues.
Previous Job: in Egypt
•Working in directorate of roads and transport in Egypt

site engineer في Western Bainoona Group
  • الإمارات العربية المتحدة
  • يناير 2008 إلى يوليو 2009

site engineer from 25-12-2007 until 28-03-2009 in projects :-
1-Project Sewage treatment plant in Dubai Jabel Ali with company Al AHMADIAH Actor in the works of embankments and roads
• Excavated all areas to the formation level using ( excavator -dozer - JCB)
• Remove all material by trucks to stock pile and mix material
• Take the material to the filling area and compacted using (grader - roller -tanker )
• Prepare the sub grade before put sub base road base and asphalt layers for the interior roads
• Quantity surveying and prepare the payment for every month
2-Wide of Dubai by Pass in Dubai with company Yuksell total length 24 km
• Add another lane by width 5.00 m including filling to formation level and put layer of subbbase@30cm and wet mix 20 cm
3-Establish road in Samah in Abu Dhabi total length 20 km (sub grade - sub base -prime coat - wearing surface)
4-GOLF GARDENS RESIDENTIAL COMMUNITY PROJECT in Abu Dhabi
Established net roads inside
(kerb stone- sub grade - sub base - prime coat - base course-tack coat -wearing surface)
Working in ALQIASER . Company in Abu Dhabi as a site engineer in construction of
2 villa in Abu Dhabi Mohammed Ben Zaied city from 01/04 /2009 to 01/08 /2009
• take all the permission from Abu Dhabi Municipality
• Mange subcontractors, problem solving and filed issues

Actor في Al AHMADIAH
  • الإمارات العربية المتحدة
  • يناير 2008 إلى يناير 2009

in the works of embankments and roads
•Excavated all areas to the formation level using ( excavator -dozer - JCB)
•Remove all material by trucks to stock pile and mix material
•Take the material to the filling area and compacted using (grader - roller -tanker )
•Prepare the sub grade before put sub base road base and asphalt layers for the interior roads
•Quantity surveying and prepare the payment for every month
2-Wide of Dubai by Pass in Dubai with company Yuksell total length 24 km
•Add another lane by width 5.00 m including filling to formation level and put layer of subbbase@30cm and wet mix 20 cm
3-Establish road in Samah in Abu Dhabi total length 20 km (sub grade - sub base -prime coat - wearing surface)
4-GOLF GARDENS RESIDENTIAL COMMUNITY PROJECT in Abu Dhabi
Established net roads inside
(kerb stone- sub grade - sub base - prime coat - base course-tack coat -wearing surface)
Working in ALQIASER . Company

Supervision في directorate of roads and transport
  • مصر - الإسكندرية
  • يناير 2001 إلى يناير 2008

at all the stages to establish the roads (cut - fill-
•Formation - sub base - layers of asphalt)
•Take all the leveling in longitudinal and cross direction
•take all tests required to finish every stage
•Design the required thickness to sub base asphalt
Quantities surveying to (filling - cut - sub base - asphalt

الخلفية التعليمية

بكالوريوس, Civil engineering
  • في Alexandria UniversityAlexandria university
  • يناير 2000

courses: Graduation Project: • Soil mechanic design foundation for building and bridges and studies of properties of soil under foundation High studies: •Diploma in " High Way "

Specialties & Skills

Infrastructure Projects
ADOBE PHOTODELUXE
DIRECTING
FILE MANAGEMENT
GRAPHIC DESIGN
MICROSOFT
MICROSOFT WORKS
PROBLEM SOLVING
SUPERVISORY SKILLS

اللغات

العربية
متمرّس
الانجليزية
متمرّس