Mohammed Elgohary, Senior project manager PMP

Mohammed Elgohary

Senior project manager PMP

ABV Rock Group

Location
Saudi Arabia
Education
Bachelor's degree, Civil engineering
Experience
17 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 1 Months

Senior project manager PMP at ABV Rock Group
  • Saudi Arabia - Dammam
  • My current job since June 2020

Position: Senior Project Manager (Managing an EPC team of 44 engineers, and +450 workers) for LSTK project.

Responsibilities
• Providing efficient and professional solutions in project management, Design, contracts, procurement, Estimation, Execution, Supervision, coordination, and successful completion of project.
• Coordinating with the Client, design Consultant, supervision consultant and Attend conferences, technical and progress meetings with clients/consultants as required to maintain proficiency.
• Ensure that all projects are delivered on-time, within scope and within budget.
• Assist in the definition of project scope and objectives, involving all relevant stakeholders and ensuring technical feasibility. Ensure adherence to the international QHSE standards.
• Develop a detailed project plan to monitor and track progress and manage changes to the project scope, project schedule and project costs using appropriate verification techniques
• Measure project performance using appropriate tools and techniques.
• Perform risk management to minimize project risks and maintain comprehensive project documentation and track project performance, specifically to analyze the successful completion of short and long-term goals
• Meet budgetary objectives and adjust project constraints based on financial analysis.

Projects:

1- RSLFAC Apache Construction Program in three military bases

Owner: Ministry of Defense, Royal Saudi Land Forces Aviation Command (RSLFAC)

Project management: United States Army Corps of Engineers (USACE), Department of Defense
Location: Dammam, Eastern Province, Kingdom of Saudi Arabia.
Tabuk, Tabuk Province, Kingdom of Saudi Arabia.
Khamis Mushait, Asir Province, Kingdom of Saudi Arabia.
Project budget: 70, 000, 000 USD
Position: Project Manager (design build project, EPC)
Scope of Work: Through the $1.5bn Apache Program, working on phase one of the design build contract as part of the US Foreign Military Sales Program (FMS). Responsible of the overall project management of Design, contracts, procurement, Estimation, Execution, Supervision, coordination, and successful completion of project. The Apache Program is a multi-phase design build programme, funded through the Ministry of Defense (KSA) and managed through the US Army Corps. The construction is for apache helicopter hangers, spare parts warehouse, ground support equipment facilities, infrastructure, electrical and telecom networks, water and sewer plants, helicopter runways, taxiways and airfield across three cities in Saudi Arabia.

Project manager at Takamul project management
  • Saudi Arabia - Khobar
  • October 2019 to May 2021

Responsibilities

• Providing efficient and professional solutions in project management, Design, Estimation, Execution, quality control (QC), quality assurance (QA), Supervision, coordination, and the successful completion of project.
• Coordinating with the Client/Consultant, Project Management Team of Main-contractors, Sub-contractors, and other service Contractors.
• Prepare and control the project cash flow including expenditures a revenue.
• Take all necessary measures to protect the company rights in all aspects including cost & time.
• Ensure that project is executed in line with the time schedule.
• Prepare weekly and monthly reports to management.
• Liaising with authorities like Municipality and Civil Defense, SECO for all the related works
• Prepare contractual documentation.
• Leading the project management, Commercial, projects controls, design & construction teams.
• Attending technical and progress meetings with clients and consultants.
• Ensure adherence to the international QHSE standards.



Projects:

1- Al-HARAMAIN (RADISSON BLU and PARK INN) Hotels

Owner: Al-Rajhi Investment
Design Consultant: Zuhair Fayez Partnership
Location: Mecca, Western Province, Kingdom of Saudi Arabia.
Project budget: 275, 000, 000 SAR

Scope of Work: Project Management services for design, procurement, tendering, and
construction till handover, for the duration of 28 months. A 4-star hotel (Radisson) that has a total capacity of approximately 196 rooms and another adjacent hotel (Park Inn) that have a total capacity of approximately 154 rooms. Both are high-rise buildings that consist of a basement, ground, and 19 floors including services, reception, prayer hall, kitchen/dining, 14 floors for guest rooms, and other facilities. Total BUA of 20, 292 m² on a 1400 m² land located 1 km from Holy Haram.

2- AL-NASEEM Complex Tower (TILAL AL-NASEEM)

Owner: Al-Rajhi Investment
Consultant: Khatib and Alami
Location: Tilal Al-Naseem, Mecca, Western Province, Kingdom of Saudi Arabia.
Project budget: 1, 000, 000, 000 SAR

Scope of Work: Technical Assessment of Al Naseem Complex which is a mixed-use development comprises of several towers with a shared podium of 14 floors accommodating commercial facilities, offices, prayer, banquet, and restaurant floors and parking on a single plot. This podium carries four elevated towers of which three are H-shaped 11-story towers (1st to 18th-floor levels) interlinked via bridges and are of similar configuration, and a single 21-story (1st to 21st-floor levels) tower. The estimated built-up area for all is more than 380, 000 square meters (m²). the assessment was for structural stability, GRC cladding, waterproofing, elevators & escalators, and HSE.

Senior Project Manager at Al-Othman holding - MOC
  • Saudi Arabia - Khobar
  • February 2015 to October 2019

1- The main role was to Manage all listed below projects in the same time assuring the highest control of cost, quality, and time.

2- Interface and coordinate with clients, engineers and contractors to ensure synergy at all levels.

3- Efficient management of procurement, programming of works, and ensuring consistent adherence to health and safety regulations.

4- Performing a complete handover process for our clients.

5- Revision of material submittal records, design & shop drawing submittals, procurement monitoring sheets, and work progress with the team.

6- Providing on-site management and quality control to ensure projects meet time and budget requirements and are built in accordance with the contract documents, international standards, and specifications.

7- Assessing risk factors for ensuring no hindrance in project work.

8- Working in close coordination with the top management and concerned departments to maintain the delivery of all resources within the set time schedule.

Projects:

1- Kempinski Al-Othman hotel (five stars’ luxury hotel)

Owner: Al-Othman holding
Main contractor:  Mohammad Abdullah Al-Othman trading and contracting company
Location:  Al-Khobar, Eastern Province, Kingdom of Saudi Arabia
Project budget: 1, 000, 000, 000 SAR
Scope of Work: Turnkey project for a 218-key hotel which is being developed by Al-Othman Holding Company. The hotel consists of 9 luxurious restaurants and cafés like Enab Beirut, OKKU, Salero, etc. 141 guestrooms measuring between 42 and 47 square meters each, 57 suites including one Presidential Suite, one royal suite, and an opulent 250-square meter penthouse, in addition to 20 elegantly appointed serviced apartments. All feature superior quality furniture and fittings and advanced guest convenience technology, also, eleven meeting rooms are included in the hotel

The project includes also a separate structure which is WEDDING HALL FOR 2500+ SEATS as two 15, 000 square-foot ballrooms comprising entire floors that will accommodate major social and business events as part of this luxurious hotel.
The hotel is part of Al-Othman Holding complex which contains also a 24 floors’ adjacent matching office tower including basements, Ottoman signature hotel, parking building, meeting rooms.

2-Al Mohammadia residential compound

Owner: Al-Othman holding
Main contractor:  ASMAEL contracting company.
Location:  Al-Khobar, Eastern Province, Kingdom of Saudi Arabia
Project budget: 150, 000, 000 SAR
Scope of Work: Turnkey project which is situated between the cities of Al Khobar and Dammam over 80, 000 m2, phase (1) has been completed with 96 units and phase (2) is under construction with more 166 units that are divided into three different types ranging between villas, two-bedroom apartments, and studios in addition to recreation building with outdoor swimming pool, multipurpose court, play areas, landscaping, infrastructure, etc.….

3- Saudi ARAMCO company offices (Fit-Out project developed under the supervision of Al-Othman holding)

Owner: SAUDI ARAMCO
Location:  5 Floors (5th to 9th) in Al-Othman holding office tower.
Scope of Work: A turnkey development provided the tenant with spaces that are completely fitted
Out with Raised floors, suspended ceilings, distribution of electro-mechanical services, internal surface finishes, final finishes, low current systems, installation of specialist facilities in meeting rooms, board rooms, conference rooms, and so on.
Fitting out reception areas too, installation of equipment, kitchen, furniture, etc.…..

4- Various Fit-out projects

- Offices of Al-Othman Holding, SSBS, Al-Qantara & gulf desert chemicals companies at Al- Othman business park- Al Khobar city.

- WALAA insurance company in AL Khobar city.

- TAKWEEN company in Al-Othman holding office tower.

project manager at AFNIAH consultants engineering office
  • Saudi Arabia - Khobar
  • May 2010 to January 2015

Projects:

1- Dammam storing Silos complex and ancillary buildings in King Abdul-Aziz port.

Owner: Grain silos and flour mills organization (Ministry of Agriculture).
Main contractor: Nahdet Al-Emaar contracting company
Location: King Abdul-Aziz port, Dammam, Eastern Province, Kingdom of Saudi Arabia
Project Contract: 339, 000, 000 SAR
Position: Project Manager (june2012-till now)
The scope of Work: Turnkey project for construction of new grain storing silos complex with total lot area of 40, 000 sq. meter consisting of 80 wheat silos with total capacity equals 140000 ton (51 meter height and 8 meters diameter for each one by slip formwork systems), High rise head house building (72 meter height by slip formwork systems), Intake pit building, Wheat bulk out loading building, Ship unloading conveying system, administration building, warehouse, mosque, fence and many other auxiliary buildings including Design and construction of all Civil, Structural, Electrical, Mechanical Works.
Construction included also infra-structure networks, Earthworks, all external works such as landscape, roads, storm drainage system, etc...

2- Makkah storing Silos complex and ancillary buildings.

Owner: Grain silos and flour mills organization (Ministry of Agriculture).
Main contractor: Haif Company
Location: Al-Jamoum, Mecca, Western Province, Kingdom of Saudi Arabia.
Project Contract: 819, 000, 000 SAR
Position: Project Coordinator (july2011-may2012)
The scope of Work: Turnkey project for construction of new grain storing silos facility with total lot area of 962, 700 sq. meter consisting of 64 wheat silos with total capacity equals 250000 ton (40 meter height and 13 meters diameter for each one by slip formwork systems), Two high rise head house building (61 meter height by slip formwork systems), Two flour mills with total capacity 1200 ton/day, Intake pit building, Wheat bulk out loading building, warehouses, water treatment plant, sewage treatment plant, Electrical substations, Emergency generators station, two administration buildings, employee villas, labor housing, laboratories, two mosques and many auxiliary buildings including Design and construction of all Civil, Structural, Electrical, Mechanical Works.
Construction included also infra-structure networks, Earthworks, all external works such as landscape, roads, storm drainage system, flood protection channels, etc...

3- Weatherford new facility in KSA

Owner: Weatherford international (Oli and Gas Company)
Main contractor Arnaout Contracting Establishment (ARCON)
Location: 2nd industrial zone, Dammam - Abqaiq road, Eastern Province, Kingdom of
Saudi Arabia
Project Contract: 200, 000, 000 SAR
Position: Project Manager (June 2010- June 2011)
The scope of Work: Turnkey project for construction of the new Weatherford Base in the kingdom with a total lot area of 100, 000 sq. meters. consisting of main workshop, power plant, Electrical substations, water treatment plant, sewage treatment plant, head administration building, accommodation building, cooking and dining area, recreation area, simulation area, Multipurpose playing courts and many auxiliary buildings including Civil, Structural, Pre Engineering, Electrical, building management system (BMS) and Mechanical Works including chiller system, Firefighting and plumbing networks, etc...

Project Manager at AFNIAH consultants
  • Saudi Arabia - Khobar
  • May 2010 to May 2011

4- Ammar high rise tower
Owner: Ammar Real Estate Company
Main contractor Tarek al-Jaafari contracting company
Location: Prince Turki Street, Corniche district, Al Khobar, Eastern Province, Kingdom of
Saudi Arabia
Project Contract: 50, 000, 000 SAR
Position: Project Coordinator (july2011-may2012)
The scope of Work: Turnkey project for construction of a multi-story residential and commercial tower
with a total built-up area of 1200 sq. meters. Consisting of two basements, ground floor, mezzanine
floor and another 14 floors above ground including Pre-Engineering, Civil, Structural, Electrical, IT,
access and security control, Mechanical Works such as HVAC, Firefighting and plumbing networks,
etc...
Construction included also Earthwork and all external works. Also, elevators, flooring, partitions
installation, walls finishing, wooden, aluminum, steel works, cladding, and curtain walls, etc...

5- Al-Bassam villas compound
Owner: Al-Bassam family
Main contractor Wadi Al-Abrakaen contracting company
Location: Almuraekpat district, Dammam, Eastern Province, Kingdom of
Saudi Arabia
Project Contract: 35, 000, 000 SAR
Position: Project Coordinator (july2011-may2012)
The scope of Work: Turnkey project for construction of a private family compound with a total lot area
of 9400 sq. meters. consisting of 7 villas with a different design, swimming pools, landscape
walkways, fence, garages, etc.… including Pre-Engineering, Civil, Structural, Electrical, access and
security control, Mechanical Works such as HVAC, Firefighting and plumbing networks, etc...
Construction included also Earthwork, all external works such as landscape, walkways, irrigation
system. Also, swimming pools, elevators, block works, flooring, walls finishing, wooden, aluminum,
steel works, claddings, etc...

Responsibilities in this Company:
1- Working as a consultant Project Manager and coordinator.
2- Preparing tender documents, bill of quantities, the scope of works, terms, and conditions of contracts
for main contractors and sub-contractors.
3 Management and construction supervision of large-scale projects with high-quality standards
such as (ARAMCO standards) and Governmental standards according to international codes, the first class of engineering practices & norms besides coordination between all project disciplines
(structural, architectural, electrical, mechanical, IT and security).
4- Review and approval of quantity survey sheets for all construction fields (structural, architectural
and MEP works).
5- Review and approval of Design drawings shop drawings, as-built drawings, material submittals,
technical brochures, manufacturer's data and specifications, certificates, warranties and other for all
civil, architectural, MEP work with the project team.
7- Full application of quality control and quality assurance systems.
8- Reviewing invoices, Project' periodical payments, change and variation orders and approving it.
9- Gaining Higher Communication skills in dealing with the client, the main contractor, subordinates.

Senior Civil Engineer at Dar for trading and contracting (Detac)
  • Egypt - Cairo
  • June 2009 to May 2010

Main experience in the Construction Field, Technical Office.

Projects: 1. Ahli United Bank Headquarter (AUBE).

Owner: Ahli United Bank of Egypt
Consultant: Al-Nour Consulting Group (NCG)
Location: 90th road, Fifth Community, New Project Contract: 150, 000, 000 LE.
Position: Senior civil engineer
The scope of Work:
The turnkey administrative project including construction, electro-mechanical and finishing works consisting of 7 floors with built-up area equals 25, 000 m2.
Construction included Earthwork, insulation, Foundations, concrete skeleton and steel structure, Post-tensioning system, and all external works. Also flooring, partitions installation, walls finishing, wooden, aluminum, steel works, elevations' cladding, and curtain walls, landscape.

Job description in this Company:
1. Construction of a large-scale project with high-quality standards and coordination between all
project disciplines (structural, architectural, electrical, firefighting, plumbing, HVAC and IT).
2- Preparing quantity survey sheets for all construction fields (structural, architectural and MEP
works).
3- Making bill of quantities, the scope of works, terms, and conditions of contracts for sub-contractors.
4- Producing shop drawings for all structural members such as (Footings, columns, beams, slabs,
stairs, formwork, tanks, post tension and pre-tension concrete, Itch).
5- producing shop drawings for all architectural items, for example (masonry, partitions, false
ceiling, flooring finishing, glass, wooden, steel, aluminum doors, and windows, Itch).
6- Preparation, arrangement, and control for all types of project documents.
7- Working in project cost control, price analysis, cost estimation, invoices, Project' periodical
payments, and variation orders.
8- Communication and coordination with client, consultant, subordinates, sub-contractors,
supervisors, and technicians.

Civil Engineer at New Vision for Constructions Company
  • Egypt - Cairo
  • May 2007 to May 2009

Main experience in Construction Field and Technical Office, cost estimation, planning.

Projects:

1. Construction of Villas compound (AUC faculty members compound)
Owner: American University in Cairo
Location: New Cairo, Egypt
Project Contract: 30, 000, 000 LE.
Position: civil engineer
The scope of Work: residential project including construction, electro-mechanical and finishing works
consisting of 30 villas with built-up area equals about 21, 000 m2.

2. Construction of MAC factory extension
Owner: MAK BRAKE LINING CO.
Location: Industrial Zone, 10th of Ramadan city, Egypt
Project Contract: 6, 000, 000 LE.
Position: civil engineer
The scope of Work: industrial project including earthwork, foundations, insulation, slabs on grade,
steel structure.

3- Construction supervision on finishing works in the new conference halls at National Institute of
Standards (NIS) - Cairo - Egyp

Job description in this Company:

1. Working as a site engineer for the main contractor.
2. Construction supervision and coordination of the subcontractor's works.
3. Preparing technical office works (bill of quantities, cost estimation, shop drawings, quantity
surveying and projects payments).
4. Management of several projects at the same time and coordination between it.
5. Structural Design of some projects and design review for outsourcing offices.

Education

Bachelor's degree, Civil engineering
  • at Faculty of Engineering, CAIRO
  • May 2007

GRADUATION PROJECT Structural Design of Reinforced Concrete Buildings This discussed: Design of (High rise multi-story building, Villas compound, Elevated Tank, underground tank and group of coastal chalets).

Specialties & Skills

Project Execution
Construction Consulting
Project Management
civil engineer
Engineering
designing with different structural softwares
communication
efficiency
cost control
leadership
management
planning
quality control and quality assurance

Languages

Arabic
Expert
English
Expert
German
Beginner

Memberships

Saudi Council of Engineers
  • Engineer
  • May 2010
Egyptian syndicate of Engineering
  • Engineer
  • July 2007

Training and Certifications

Project Management Professional (PMP) (Certificate)
Date Attended:
July 2021
Valid Until:
July 2024
structural design (Training)
Training Institute:
Arab Bureau For Design & Technical Consultations

Hobbies

  • reading , practicing sport