Total Years of Experience: 30 Years, 1 Months
May 2020
To Present
Sr. Project Manager
I found this job using Bayt.com
at Al Rabiah Project Management & Engineering Services Co. Dammam, Saudi Arabia
Location :
Saudi Arabia - Duba
Project :
EPC of Neom Modular Building “Circular Economy Pavilion”, NEOM NC-1 Sharma, KSA
Includes Engineering Design, Procurement & Construction (EPC); the modular building consists of all earthwork, civil, structural, architectural finishes, MEP system, power & lighting, telecom, CCTV, firefighting, fire alarm system, access control, BMS, test & comm and hand over documents, etc. works.
Client : Neom PMT
Responsible for managing overall project contract control and monitor from commencement to completion ■ Lead project team including subcontractors, motivate & inspire to accomplish project goal ■ Selecting subcontractors/vendors & negotiate scope of works, engage after Client’s approval & supervise ■ Review design and drawings ■ Oversees implementation process of Project Execution Plan, Procurement Plan, Subcontracting Plan, Health and Safety Plan, Quality Assurance/Quality Control Plan, and other documents & deliverables as required ■ Claiming variations, Construction progress along the way in an efficient, timely, and cost-effective manner ■ Review the bids technical and commercial documents for the new works submission ■ Motivate team for successful completion of fast-track project in coordination with client ■ Punch listing and hand over documents ■ Reporting project director and management.
PROJECT MANAGER
Projects :
Construction of Infrastructure for Housing Units 300 Villas, Jubail, KSA
Royal Commission Standards, Project value SAR 215 million.
EPC of Community Centre Buildings, Jubail KSA
Royal Commission Standards, Project value SAR 38 million.
Client - SATORP PMT, EPC Contractor - Khonaini International Co. DHPD, Jubail, KSA
Main Responsibilities :
• Worked as the Client’s/PMC representative for managing all EPC contractors project execution works.
• Responsible for overall project management from early planning to final development & handover.
• Manage all aspects of the contract scope through engineering design, procurement construction.
• Maintain the highest standards with respect to safety, quality, progress, and work performance
• Overseeing project activities, plan, direct, control & supervise contractors and third parties.
• Managing the project team EPM, design consultant/contractors, third parties motivate & inspire for project goal meeting schedule and handover.
• Ensuring project executed as per agreed standards, scope of work and contract documents.
• Review & approve all documents/technical submittals, design, deliverables, drawings and materials etc.
• Review interim payments BOQ, budget & actual cost, cash flow and mitigate overrun cost, variations & progress reports.
• Implement of Quality Control plan, ITP inspections, method statement execution with best practices.
• Ensure EHS safety plan, permits, work procedure, risks requirements properly implemented.
• Resolve the matters, problem areas and promote corrective actions.
• Conducted routine progress & quality audits & walkthrough surveillance to ensure the work was progressing as specification and initiated corrective actions.
• Supervising subcontractors, reporting to higher management with company policies & procedures.
• Lead meetings clients, sub & contractors/suppliers & internal tracking MOM agenda status.
EPC of Neom Modular Building “Circular Economy Pavilion”, NEOM NC-1 Sharma, KSA
Includes Engineering Design, Procurement & Construction (EPC); the modular building consists of all earthwork, civil, structural, architectural finishes, MEP system, power & lighting, telecom, CCTV, firefighting, fire alarm system, access control, BMS, test & comm and hand over documents, etc. works.
Client : Neom PMT
Responsible for managing overall project contract control and monitor from commencement to completion ■ Lead project team including subcontractors, motivate & inspire to accomplish project goal ■ Selecting subcontractors/vendors & negotiate scope of works, engage after Client’s approval & supervise ■ Review design and drawings ■ Oversees implementation process of Project Execution Plan, Procurement Plan, Subcontracting Plan, Health and Safety Plan, Quality Assurance/Quality Control Plan, and other documents & deliverables as required ■ Claiming variations, Construction progress along the way in an efficient, timely, and cost-effective manner ■ Review the bids technical and commercial documents for the new works submission ■ Motivate team for successful completion of fast-track project in coordination with client ■ Punch listing and hand over documents ■ Reporting project director and management.
PROJECT MANAGER
Projects :
Construction of Infrastructure for Housing Units 300 Villas, Jubail, KSA
Royal Commission Standards, Project value SAR 215 million.
EPC of Community Centre Buildings, Jubail KSA
Royal Commission Standards, Project value SAR 38 million.
Client - SATORP PMT, EPC Contractor - Khonaini International Co. DHPD, Jubail, KSA
Main Responsibilities :
• Worked as the Client’s/PMC representative for managing all EPC contractors project execution works.
• Responsible for overall project management from early planning to final development & handover.
• Manage all aspects of the contract scope through engineering design, procurement construction.
• Maintain the highest standards with respect to safety, quality, progress, and work performance
• Overseeing project activities, plan, direct, control & supervise contractors and third parties.
• Managing the project team EPM, design consultant/contractors, third parties motivate & inspire for project goal meeting schedule and handover.
• Ensuring project executed as per agreed standards, scope of work and contract documents.
• Review & approve all documents/technical submittals, design, deliverables, drawings and materials etc.
• Review interim payments BOQ, budget & actual cost, cash flow and mitigate overrun cost, variations & progress reports.
• Implement of Quality Control plan, ITP inspections, method statement execution with best practices.
• Ensure EHS safety plan, permits, work procedure, risks requirements properly implemented.
• Resolve the matters, problem areas and promote corrective actions.
• Conducted routine progress & quality audits & walkthrough surveillance to ensure the work was progressing as specification and initiated corrective actions.
• Supervising subcontractors, reporting to higher management with company policies & procedures.
• Lead meetings clients, sub & contractors/suppliers & internal tracking MOM agenda status.
September 2015
To April 2020
Projects Manager (Projects Director)
at Abdullah Al Khaledy Contracting Co. (AFAC), Al Khobar , Saudi Arabia
Location :
Saudi Arabia - Khobar
Projects :
Construction of Substation RMU Building & Site Developments, Jubail
Saudi Aramco North & South Gas Compression Plant Pipe Lines 60 Km, Remote Headers Concrete Structure, Mass Earth filling works etc. at Haradh & Hawiyah.
Client - Saudi Aramco PMT, EPC - China Petroleum Engg. Corp. (CPP), Qatif, Dammam, and EPC - Saipem, Petrojet Co. Al Khobar.
Main Responsibilities :
• Manage overseeing multiple projects activities, plan, direct and developing operations related initiatives to achieve objectives.
• Responsible for overall progress managing and operations with cost & time norms.
• Ensure all projects meet budgets, time schedule, quality and safety standards.
• Identifying the risks and developing mitigation plan.
• Review cost performance reports and prepare action plan for negative variance.
• Prepare HR plan mobilization and demobilization of manpower on regular basis.
• Preparing and providing cash in/out to finance on monthly basis.
• Provide leadership for strategic planning, Support accomplishment of project team targets.
• Measures and strategic company’s goals, and subcontractors’ progress.
• Correspond with various other departments, discussing plans on future initiatives.
• Make strategic decisions and direction for project managers to implement those decisions.
• Estimate of new items for cost assessment, claims variations (change orders), pricing/bidding.
• Planning project control, schedules, expedite progress, labour productivity & recovery for delays.
• Controlling running expenses, resources manpower, equipment, materials as per budgeted cost,
• Interface directly material procurement for the best & most cost effective way to procure, evaluate quotations and review materials procurement schedule for long lead items.
• Ensuring entire site operation, team, organization and delegating assignments as required.
• Assisted in development of effective construction plan, technical problem solving.
• Direct to site team for project activities in advance from mobilization to demobilization etc.
• Participation in preparation of company annual business plan.
• Reporting senior board level, contractual obligations, rights & evaluations of technical problems.
• Implementing specification, SOW and IKTVA etc.
• Overseeing preparation of monthly progress reports for engineering, procurement, construction & commissioning activities.
• Conducting progress meeting to review project time management, projects cost performance, change orders, project obstacles & other vital concern & issues (like cash flow, subcontractors and client payments etc.)
During Period (Sep’2015 - Dec’2016) Worked as a Project Manager with Al Fanar Construction Co. (Bena) on Project EPC-LSTK Contract Construction Technical Industrial Buildings in Power Plant No. 13, Dhurma, Riyadh City. Precast Concrete Elements Supply & Installed by RANCO. Project value is SAR 224 million.
Client - Saudi Electricity Co. (SEC), PMT - WorleyParsons Arabia Ltd. Riyadh
Engineering & Design By : Al Dar Consulting Engineers, Riyadh
Construction of Substation RMU Building & Site Developments, Jubail
Saudi Aramco North & South Gas Compression Plant Pipe Lines 60 Km, Remote Headers Concrete Structure, Mass Earth filling works etc. at Haradh & Hawiyah.
Client - Saudi Aramco PMT, EPC - China Petroleum Engg. Corp. (CPP), Qatif, Dammam, and EPC - Saipem, Petrojet Co. Al Khobar.
Main Responsibilities :
• Manage overseeing multiple projects activities, plan, direct and developing operations related initiatives to achieve objectives.
• Responsible for overall progress managing and operations with cost & time norms.
• Ensure all projects meet budgets, time schedule, quality and safety standards.
• Identifying the risks and developing mitigation plan.
• Review cost performance reports and prepare action plan for negative variance.
• Prepare HR plan mobilization and demobilization of manpower on regular basis.
• Preparing and providing cash in/out to finance on monthly basis.
• Provide leadership for strategic planning, Support accomplishment of project team targets.
• Measures and strategic company’s goals, and subcontractors’ progress.
• Correspond with various other departments, discussing plans on future initiatives.
• Make strategic decisions and direction for project managers to implement those decisions.
• Estimate of new items for cost assessment, claims variations (change orders), pricing/bidding.
• Planning project control, schedules, expedite progress, labour productivity & recovery for delays.
• Controlling running expenses, resources manpower, equipment, materials as per budgeted cost,
• Interface directly material procurement for the best & most cost effective way to procure, evaluate quotations and review materials procurement schedule for long lead items.
• Ensuring entire site operation, team, organization and delegating assignments as required.
• Assisted in development of effective construction plan, technical problem solving.
• Direct to site team for project activities in advance from mobilization to demobilization etc.
• Participation in preparation of company annual business plan.
• Reporting senior board level, contractual obligations, rights & evaluations of technical problems.
• Implementing specification, SOW and IKTVA etc.
• Overseeing preparation of monthly progress reports for engineering, procurement, construction & commissioning activities.
• Conducting progress meeting to review project time management, projects cost performance, change orders, project obstacles & other vital concern & issues (like cash flow, subcontractors and client payments etc.)
During Period (Sep’2015 - Dec’2016) Worked as a Project Manager with Al Fanar Construction Co. (Bena) on Project EPC-LSTK Contract Construction Technical Industrial Buildings in Power Plant No. 13, Dhurma, Riyadh City. Precast Concrete Elements Supply & Installed by RANCO. Project value is SAR 224 million.
Client - Saudi Electricity Co. (SEC), PMT - WorleyParsons Arabia Ltd. Riyadh
Engineering & Design By : Al Dar Consulting Engineers, Riyadh
December 2007
To August 2015
QC Manager / Construction Manager / Project Manager
at Azmeel Contracting Company, Jubail, Saudi Arabia
Location :
Saudi Arabia - Jubail
Projects :
EPC-Short Form Contract Construction of Office Buildings & Warehouse, Aramco Offshore Support Division, Tanajib Al Khafji, KSA
Sub-Contractor - East Build Contracting, Dammam, Client - Saud Aramco, PMT.
CONSTRUCTION MANAGER
SASREF Refinery Field Auxiliary Buildings Construction & Control Room Renovation Works, Jubail, KSA
Subcontractor Precast Concrete production, supply and installation by Qanbar Dywidag Co.
Client - SASREF, PMT/Consultant - SASREF PMT/WorleyParsons Arabia Ltd.
QA/QC MANAGER (Technical Manager) (Dec’ 2007 - Feb’ 2010)
GOSI Housing & Multi-storied Apartment Buildings Construction, Jubail consists of residential units 350 Villas and 17 Apartment multistorey, all interior and exterior architectural finishes, precast concrete superstructures over cast-in place concrete raft foundations, MEP Telecom Firefighting works, internal road and parking, ground improvement/densification (stone columns-piles), lift station, site developments, infrastructure works etc. The project value was SAR 970 million.
Client - GOSI General Organization of Social Insurance,
Consultant - SOFCON Group Engineering as Project Management Consultant Al Khobar,
Project Supervising PMT - Royal Commission Jubail.
Main Responsibilities :
• Managing overall project quality control/assurance with reference to contract scope.
• Fully implemented Royal Commission (RC) standards and guidelines specifications.
• Prepare & implementation of project quality control plan (QCP), Inspection Test Plan (ITP).
• Leading quality department and staff, resolve QC issues and respective actions etc.
• Impose site construction as per approved procedures, specification & standards.
• Submission of all technical submittal’s materials, drawings, method statement/procedure.
• Preparing technical quarries, review design drawings concerned shop drawings prior to submittal.
• Preparing handover documents snag list, as-built drawings, QC dossier, T&C reports and manuals & warranties etc.
• Manage submission of materials & work inspections (MIRs & WIR’s) for all disciplines.
• Conduct audits and routine surveillances over site observations, corrective actions accordingly.
• Coordinate with Consultant for approval each discipline RFI and other documents.
• Cooperate for final resolution of any Non-Conformities (NCR) with concerned responsible.
• Prepare & review material specification compliance sheet for all disciplines submittals & approval.
• Ensuring quality supervision of subcontract works, managing independent laboratories and reports. Overall coordination with Client and Consultant and meetings etc
EPC-Short Form Contract Construction of Office Buildings & Warehouse, Aramco Offshore Support Division, Tanajib Al Khafji, KSA
Sub-Contractor - East Build Contracting, Dammam, Client - Saud Aramco, PMT.
CONSTRUCTION MANAGER
SASREF Refinery Field Auxiliary Buildings Construction & Control Room Renovation Works, Jubail, KSA
Subcontractor Precast Concrete production, supply and installation by Qanbar Dywidag Co.
Client - SASREF, PMT/Consultant - SASREF PMT/WorleyParsons Arabia Ltd.
QA/QC MANAGER (Technical Manager) (Dec’ 2007 - Feb’ 2010)
GOSI Housing & Multi-storied Apartment Buildings Construction, Jubail consists of residential units 350 Villas and 17 Apartment multistorey, all interior and exterior architectural finishes, precast concrete superstructures over cast-in place concrete raft foundations, MEP Telecom Firefighting works, internal road and parking, ground improvement/densification (stone columns-piles), lift station, site developments, infrastructure works etc. The project value was SAR 970 million.
Client - GOSI General Organization of Social Insurance,
Consultant - SOFCON Group Engineering as Project Management Consultant Al Khobar,
Project Supervising PMT - Royal Commission Jubail.
Main Responsibilities :
• Managing overall project quality control/assurance with reference to contract scope.
• Fully implemented Royal Commission (RC) standards and guidelines specifications.
• Prepare & implementation of project quality control plan (QCP), Inspection Test Plan (ITP).
• Leading quality department and staff, resolve QC issues and respective actions etc.
• Impose site construction as per approved procedures, specification & standards.
• Submission of all technical submittal’s materials, drawings, method statement/procedure.
• Preparing technical quarries, review design drawings concerned shop drawings prior to submittal.
• Preparing handover documents snag list, as-built drawings, QC dossier, T&C reports and manuals & warranties etc.
• Manage submission of materials & work inspections (MIRs & WIR’s) for all disciplines.
• Conduct audits and routine surveillances over site observations, corrective actions accordingly.
• Coordinate with Consultant for approval each discipline RFI and other documents.
• Cooperate for final resolution of any Non-Conformities (NCR) with concerned responsible.
• Prepare & review material specification compliance sheet for all disciplines submittals & approval.
• Ensuring quality supervision of subcontract works, managing independent laboratories and reports. Overall coordination with Client and Consultant and meetings etc
May 2003
To December 2007
Project Control Engineer (Planning & Scheduling)
at Saudi Oger Limited, Riyadh, Saudi Arabia
Location :
Saudi Arabia
Projects :
Construction of Community Package consists of Commercial, Residential Buildings 300 Villas, Clinic, School, Mosque, Underground Utilities, roads, parking areas, Site Developments & Infrastructure Works, Al Khafji, Project value was SR 350 million.
MTD Works & Other Facilities Package involves construction of administrative buildings, central warehouse complex area, security forces, prisons room, substation, chiller room, garages etc.
Client - Aramco KJO Khafji Joint Operations PMT - Dar Al Handsah Shair & Partners Co. and Project Management Consultant Zuhair Fayez Partnership Engineers Co. Riyadh.
Main Responsibilities :
• Turning out overall planning and scheduling works as per project requirements & PMT.
• Development of plan, construction schedule, progress updating, monitoring & reports.
• Drive project resources, guide & direct resolution of project problems corrective action.
• Plan, schedule, progress tracking plan verse actual monitoring & reports.
• Cross check project budget cost and actual expenses in time effective manner.
• Determine design change and schedule slippage impact proactive action accordingly.
• Ensure timely addressing of project contractual deliverables, sub-contract documents.
• Encompass operational, quality, environmental and safety aspects within the design.
• Minimize non-recoverable and risk management issues of the company.
• Review performance and offer personnel development for employees.
• Recommend and customize project control systems to satisfy project requirement.
• Follow up procurement schedule process long lead items for in time deliveries.
• Interact with Clients and attend regular meetings and provide reports.
Construction of Community Package consists of Commercial, Residential Buildings 300 Villas, Clinic, School, Mosque, Underground Utilities, roads, parking areas, Site Developments & Infrastructure Works, Al Khafji, Project value was SR 350 million.
MTD Works & Other Facilities Package involves construction of administrative buildings, central warehouse complex area, security forces, prisons room, substation, chiller room, garages etc.
Client - Aramco KJO Khafji Joint Operations PMT - Dar Al Handsah Shair & Partners Co. and Project Management Consultant Zuhair Fayez Partnership Engineers Co. Riyadh.
Main Responsibilities :
• Turning out overall planning and scheduling works as per project requirements & PMT.
• Development of plan, construction schedule, progress updating, monitoring & reports.
• Drive project resources, guide & direct resolution of project problems corrective action.
• Plan, schedule, progress tracking plan verse actual monitoring & reports.
• Cross check project budget cost and actual expenses in time effective manner.
• Determine design change and schedule slippage impact proactive action accordingly.
• Ensure timely addressing of project contractual deliverables, sub-contract documents.
• Encompass operational, quality, environmental and safety aspects within the design.
• Minimize non-recoverable and risk management issues of the company.
• Review performance and offer personnel development for employees.
• Recommend and customize project control systems to satisfy project requirement.
• Follow up procurement schedule process long lead items for in time deliveries.
• Interact with Clients and attend regular meetings and provide reports.
December 1993
To February 2003
Civil Site Engineer, QS - Construction Manager
at Al Romaysa Contracting Co. Riyadh, Saudi Arabia
Location :
Saudi Arabia - Riyadh
Projects :
Project-6 : Construction of Private Palace at Riyadh, KSA Client : Private,
Consultant Zuhair Fayez Partners Co.
Project-5 : Extension and Renovation Works of Military Hospital at Riyadh, KSA
Project-4 : Construction of Airbase Facilities, Steel Shades & Hangers at Riyadh, KSA
Project-3 : Kingdom Tower high rise tower 300m tall, multidiscipline discipline works etc.
Main Contractor El Seif Establishment, Consultant - Omrania & Associates
Quantity Surveying works
Project-2 : YANPET Home Ownership Program, Construction of Housing Colony with annex buildings at Yanbu, KSA
Client - Yanbu Petrochemical Co., EPC Main Contractor - Thinet International Engineering Contractor, Consultant - Al Zamil Turbag Consulting Engineers.
Project-1 : Govt. Military Training Institute Construction, Buraidah Al Qassim, KSA
Construction of military facilities and annex buildings concrete & pre-engineered structures, internal roads, infrastructure other miscellaneous works etc.
Main Responsibilities :
• Performed work for the above construction projects with different roles as Site Engineer, QS, Project Engineer to Construction Manager executing from commencement to completion with reference to the specification, approved drawings considering time schedule, quality & safety.
• Also carried out quantities take-off for materials procurement, actual quantities of executed items for periodical invoices and preparing contractual variations for cost assessment claims.
Project-6 : Construction of Private Palace at Riyadh, KSA Client : Private,
Consultant Zuhair Fayez Partners Co.
Project-5 : Extension and Renovation Works of Military Hospital at Riyadh, KSA
Project-4 : Construction of Airbase Facilities, Steel Shades & Hangers at Riyadh, KSA
Project-3 : Kingdom Tower high rise tower 300m tall, multidiscipline discipline works etc.
Main Contractor El Seif Establishment, Consultant - Omrania & Associates
Quantity Surveying works
Project-2 : YANPET Home Ownership Program, Construction of Housing Colony with annex buildings at Yanbu, KSA
Client - Yanbu Petrochemical Co., EPC Main Contractor - Thinet International Engineering Contractor, Consultant - Al Zamil Turbag Consulting Engineers.
Project-1 : Govt. Military Training Institute Construction, Buraidah Al Qassim, KSA
Construction of military facilities and annex buildings concrete & pre-engineered structures, internal roads, infrastructure other miscellaneous works etc.
Main Responsibilities :
• Performed work for the above construction projects with different roles as Site Engineer, QS, Project Engineer to Construction Manager executing from commencement to completion with reference to the specification, approved drawings considering time schedule, quality & safety.
• Also carried out quantities take-off for materials procurement, actual quantities of executed items for periodical invoices and preparing contractual variations for cost assessment claims.
Share on Facebook