Mechanical engineer
Al khayyat Contracting and Trading
Total years of experience :14 years, 4 Months
Execution of all Mechanical works related to HVAC, Plumbing, Drainage and Firefighting works.
• Reviewing the Concept design/ IFC drawing.
• Review the Shop Drawings & As built drawings and submits it to consultant for approvals.
• Co-ordinations with civil department, MEP department, Finishing department, Consultants and Sub contractors.
• Ensure that all site activities are conducted under controlled conditions as per shop drawings, method statements, specification and work plan.
• Ensure safe work environments, control the use of material and avoid damages and waste and issue daily instructions as per the work plan.
Air Conditioning Heat Loss calculations Using HAP software.
• Duct designing using duct sizer software
• Duct system design, supervision, duct fabrication and installation of the ductwork
• Site supervision of all Air-conditioning works.
• Ensure smooth commissioning of the erected HVAC projects.
• Ensure that all HVAC site activities are conducted under controlled conditions as per shop drawings, method statements, and specification and work plan.
• Ensure safe work environments, control the use of material, avoid damages and waste, request material, tools and equipment needed for the projects and issue the foreman daily instructions as per the work plan
• Maintaining records and archives to company standards.
Review the Shop Drawings & As built drawings
• Checking the Quality of work by using NDT Technology.
• Checking the welding crack in Pressure Vessel and other products with UV Test.
• Ensure that all site activities are conducted under controlled conditions as per shop drawings, method statements, specification and work plan.
• Assigning works to the supervisor.
• Maintaining records of Test and materials.