assistant maintenance manager
PALM HELLS DEPARTMENT in NEW CAIRO
Total years of experience :11 years, 8 Months
My work now : Assistant Manager of maintenance department in EDARA SODIC in East Town project in New Cairo .
My job is managing maintenance works as emergency or preventive maintenance of all MEP works as infra electrical works transformers, cables, street lighting, demotic water pumps , irrigation water pumps sweet water networks and swage .. etc, also coordinating with clients in my scope .
(mobile) - 00201149254945 - 002 01094663348
B) EDUCATION
B.Sc. of Engineering in Electrical Power & Electrical Machine Department, Faculty of Engineering, Menoufiya University, Shebin-El-Kom branch, Egypt.
Accumulative Degree : good
Graduation Year : May 2005
Graduation Project :
Tittle: ON LINE MACHINE BY USING ( P . L . C )
Project grade: Excellent.
Work experience
1st: From 15/9/2005 to 30/6/2007 working in AQUA TREAT company for operation and maintenance of water stations and waste water stations and water network in ELSHROOK CITY
1st Project: The main water station in Elshrook city which has ground container with 30000 m3
Job description:
1- Supervisor during the daily works and tasks.
2- Responsible for making the Electrical Equipments Maintenance like Diesel Generator (Caterpillar), Transformers, Pumps, Sensors, Contactors, …etc.
3- Responsible for solving classic control circuits issues.
4- Responsible for solving all mechanical issues.
Note: This station has 12 pumps with different range of power from 160 KW to 400 KW.
2nd Project: Waste water station no.4 in Elshrook city
Job description:
1- Supervisor during the daily works and tasks.
2- Responsible for solving soft starter issues.
3- Responsible for solving power factor correction panel issues.
4- Responsible for solving all mechanical issues.
Note :- This station has 4 vertical pumps with power from 1 M W and 2 generators CAT has power 2.5 mw
3rd Project: The main water station in 10th of Ramadan city
2nd : From 1/7/2007 until 25/9/2010 working in TALAAT MOSTAFA GROUP in A.C.C (Alexandria for Constructions Company) in this company I work as site Engineer of execution for electrical works in construction and works of Preparations for the site (generators maintenance, lighting, and Assembly of panels and cables of all of this)
The projects that I worked it
1- three villaes projects each projects contained on approximate 200 villaes and Delivered to E.C.G total number 630 villaes
2- 40% of wall of madinaty club and Delivered to E.C.G
3- FINAL WORKS OF Swimming pool of MAY FIAR CLUB project
4- Technical office works as shop drawing and submittal of materials and customer modifications
5- Last position team leader on VGII section contain of 1200 villas as coordination between site and Technical office
3rd From 26/9/2010 to 31/1/2013 working in PALM HELLS DEPARTMENT in NEW CAIRO in project of 26 fd
6TH IN SAUDI ARABIA - ALJUBIL executive manager in Taaheel factory project from 23/2/2013 for all works as electrical / instrumentation work from constriction to operation from substation to MDBs room and panels to underground networks of cables to sub distribution panels to MCCs to cable trey network for completely plant and connection of all pumps and motors and nitrogen generator and air compressor and instrumentation full job for all valves on-off valves, control valves, and limit switches, and radars and RTDs and connect all these items to PLC and SCADA, system and additional jobs as civil works and finishing for buildings and roads works and some mechanical works for pumps and piping
7th :- EXECUTIVE MANAGER in CAIRO SHERATON HOTEL PROJECT WITH
MATCOM-ENGINEERING CO.
FROM 5/8/2014 to 30/4/2015 in Cairo Aldokki
My position now is executive manager of electrical works in Sheraton Hotel of Cairo, our scope main kitchen, BMS, substation, main kitchen and all panels
8th :- Senior engineer in EHAF consulting group from 2/5/2015 until now to 25/2/2016
in Palm Hills Katamya 230 fdn project
2nd: From 1/7/2007 until 25/9/2010 working in TALAAT MOSTAFA GROUP in A.C.C (Alexandria for Constructions Company) in this company I work as site Engineer of execution for electrical works in construction and works of Preparations for the site (generators maintenance, lighting, and Assembly of panels and cables of all of this)
NOTE: - FROM MOST IMPORTANT OF MY SKILLS ( I CAN MANEGE THE WORK OF GREAT SITES AND I CAN make dealing WITH CONTRACTORS AND SUBCONTRACTORS) THIS THING IS VERY IMPORTANT TO MANGE THE WORK Successfully
The projects that I worked it
1- three villaes projects each projects contained on approximate 200 villaes and Delivered to E.C.G total number 630 villaes
2- 40% of wall of madinaty club and Delivered to E.C.G
3- FINAL WORKS OF Swimming pool of MAY FIAR CLUB project
4- Technical office works as shop drawing and submittal of materials and customer modifications
5- Last position team leader on VGII section contain of 1200 villas as coordination between site and Technical office
1st: From 25/2/2007 to 30/6/2007 working in AQUA TREAT company for operation and maintenance of water stations and waste water stations and water network in ELSHROOK CITY
1st Project: The main water station in Elshrook city which has ground container with 30000 m3
Job description: 1- Supervisor during the daily works and tasks.
2- Responsible for making the Electrical Equipments Maintenance like Diesel Generator (Caterpillar), Transformers, Pumps, Sensors, Contactors, etc.
3- Responsible for solving classic control circuits issues.
4- Responsible for solving all mechanical issues.
Note: This station has 12 pumps with different range of power from 160 KW to 400 KW.
2nd Project: Waste water station no.4 in Elshrook city
Job description: 1- Supervisor during the daily works and tasks.
2- Responsible for solving soft starter issues.
3- Responsible for solving power factor correction panel issues.
4- Responsible for solving all mechanical issues.
Note: - This station has 4 vertical pumps with power from 1 M W and 2 generators CAT has power 2.5 mw
3rd Project: The main water station in 10th of Ramadan city
Job description: 1- Supervisor during the daily works and tasks.
2- Responsible for solving soft starter issues.
3- Responsible for solving power factor correction panel issues.
4- Responsible for solving all mechanical issues.
* B.Sc. of Engineering in Electrical Power & Electrical Machine Department, Faculty of Engineering, Menoufiya University, Shebin-El-Kom branch, Egypt. * Accumulative Degree: good * Graduation Year: May 2005 Graduation Project: Tittle: ON LINE MACHINE BY USING ( P.L.C) * Project grade: Excellent.