Head of Piling Department
Gulf Sun Foundation & General Contracting Est.
Total years of experience :19 years, 7 Months
• • Company Setting Up
Started the company from scratch
1- Procure the machines and equipment from the local and international market.
2- Processed the registrations on the government required establishment (Municipality, Labor office, Banks, Customs etc….)
3- Recruited and trained the competent staff for administration and operations.
4- Analyse the market for prospective projects and prepare business development planes.
5- Build up the market communication and relations to take off with the company.
6- Successfully win several projects with (ADCB, First Gulf Bank, Al Dar Properties, NBH, Swiedi & Shams Cont., Urku Cont., DAMAC)
• Operations Management
1- Supervise the operations, Site organization, and team work execution planes with the operations management team.
2- Review Subcontractor work packages and instruction for assigned work
3- Contractor, as well as Consultant progress meetings and discussions follow up
4- Review Scheduling project’s progress, resources, duration, phases (Primavera project planner, Microsoft project manager).
5- Review Implementation of the HSE planes and risk assessments
6- Prepare contract documents and revise the contract conditions
7- Review Quantity surveying for the projects material
8- Review Site logistics and equipment distribution as per the operation requirements
9- Discuss and Review the proper machines required for the operations from the market as well as communicating and finalizing agreement with the subcontractors if Required
10- Preparing tenders and quotations for projects with Tendering Team
11- Review the invoice for payments
12- Prepare and Review monthly Profit and loss reports to monitor the company development and implement development plans accordingly
Some of the Projects Executed
• Al Amry Commercial Building (3B + G + M + 7) Abu Dhabi, UAE
Contractor: ADCB
Consultant: City Plan Engineering
Works: Shoring Secant Wall, Strut System, Foundation Piles with Tests
Value: 1, 550, 000 AED Time: 2.5 months
• Thani Khalifa Commercial Building (2B + G + M + 10) Abu Dhabi, UAE
Contractor: ADCB
Consultant: Al Reef Engineering
Works: Shoring Secant Wall, Strut System, Foundation Piles with Tests
Value: 1, 800, 000 AED Time: 2.5 months
• Al Janahi Residential Building (2B + G + M + 5), Abu Dhabi, UAE
Contractor: AL Sweidi & Shams General Contracting L.L.C
Consultant: Adnan Safarini Engineering & Arif & Bintoak
Works: Shoring Secant Wall, Strut System, Foundation Piles with Tests
Value: 2, 200, 000 AED Time: 2 months
• Al Raha Beach Residential Tower (3B + G + M + 12 + R) AL Raha Beach, Abu Dhabi, UAE
Contractor: AL Dar Properties
Consultant: MAKAN Engineering
Works: Enabling work including (Shoring Secant Wall, Strut System, Foundation Piles, Capping Beams, Excavation and Dewatering) with Tests
Value: 9, 500, 000 Time: 6 months
• Al Qamzi Commercial Building (3B + G + M + 7) Abu Dhabi, UAE
Contractor: ADCB
Consultant: Four Dimension Engineering
Works: Shoring Secant Wall System, Strut system, Anchor System, H-Beam Retaining Wall, Foundation Piles with Tests
Value: 2, 500, 000 AED Time: 3 months
• • Company Setting Up
Started the Branch in Oman and manage the operations in Dubai and Saudi Arabia
1- Use Kyungin Branded Machines and its unique Technology
2- Processed the registrations on the government required establishment (Municipality, Labour office, Banks, Customs etc….)
3- Recruited and trained the competent staff for administration and operations.
4- Analyse the market for prospective projects and prepare business development planes.
5- Build up the market communication and relations to take off with the company.
6- Successfully win several projects with (Jafza, Al Ghaith General Contracting, Samsung Contstruction, Daewoo Cont., KS. Engineering, Hyundai Industrial, Astaldi Cont., Ozkar Constr., Abu Dhabi Land Gen. Cont., SK Engineering)
• Operations Management
1- Supervise the operations, Site organization, and team work execution planes with the operations management team.
2- Review Subcontractor work packages and instruction for assigned work
3- Contractor, as well as Consultant progress meetings and discussions follow up
4- Review Scheduling project’s progress, resources, duration, phases (Primavera project planner, Microsoft project manager).
5- Review Implementation of the HSE planes and risk assessments
6- Prepare contract documents and revise the contract conditions
7- Review Quantity surveying for the projects material
8- Review Site logistics and equipment distribution as per the operation requirements
9- Discuss and Review the proper machines required for the operations from the market as well as communicating and finalizing agreement with the subcontractors if Required
10- Preparing tenders and quotations for projects with Tendering Team
11- Review the invoice for payments
12- Prepare and Review monthly Profit and loss reports to monitor the company development and implement development plans accordingly
Some of the Projects Executed
• Dualization of Bidbid Sur Road Project, Section 1 - Package 1A, Oman
Contractor: ASTALDI - OZKAR JV
Consultant: Dar Al Handasa Engineers
Works: Foundation Piles, Raked Foundation Piles, Retaining Nail System, Grouting, tests
Value: 28, 000, 000 AED Time: 1 year
• Ruwais Refinery Extension PKG 2, Abu Dhabi, UAE
Contractor: SK Engineering
Consultant: Parsons Engineers
Works: Foundation Piles, Sheet Piles
Value: 23, 875, 000 AED Time: 7 months
• Hyundai - Khalifa Port & Industrial Zone Project
Contractor: Hyundai Industrial
Consultant: Keo Consultant Engineers
Works: Foundation Piles
Value: 15, 059, 900 AED Time: 6 months
•1- Supervise the operations, Site organization, and team work execution planes
2- Prepare Subcontractor work packages and instruction for assigned work
3- Contractor, as well as Consultant progress meetings and discussions
4- Responsible for Scheduling project’s progress, resources, duration, phases (Primavera project planner, Microsoft project manager).
5- Implementation of the HSE planes and risk assessments
6- Prepare contract documents and revise the contract conditions
7- Responsible for ACAD construction design drawings.
8- Quantity surveying for the projects material
9- Site logistics and equipment destitution as per the operation
10- Responsible for getting the proper machines required for the operations from the market as well as communicating and finalizing agreement with the subcontractors.
11- Marketing for the company services
12- Preparing tenders and quotations for projects
13- Analyse the market for prospective projects and prepare business development planes.
14- Prepare and submit the invoice for payments
15- Prepare progress reports daily, weekly and monthly
• Falcon Eyes, Abu Dhabi Surveillance Cameras Foundation, Abu Dhabi, UAE
Contractor: MACE Electro mechanics & Infrastructure
Consultant: KEO Engineering
Works: Foundation Piles and Logistics
Value: 32, 650, 000 AED Time: 18 months
• 1- Supervise the operations, Site organization, and team work execution planes
2- Prepare Subcontractor work packages and instruction for assigned work
3- Contractor, as well as Consultant progress meetings and discussions
4- Responsible for Scheduling project’s progress, resources, duration, phases (Primavera project planner, Microsoft project manager).
5- Implementation of the HSE planes and risk assessments
6- Prepare contract documents and revise the contract conditions
7- Responsible for ACAD construction design drawings.
8- Quantity surveying for the projects material
9- Site logistics and equipment destitution as per the operation
10- Responsible for getting the proper machines required for the operations from the market as well as communicating and finalizing agreement with the subcontractors.
11- Marketing for the company services
12- Preparing tenders and quotations for projects
13- Analyse the market for prospective projects and prepare business development planes.
14- Responsibilities include Soil report analysis, Recommending borehole positions, and Drilling analysis.
15- Study groundwater flow with the soil settlement possibilities to recommend and design the proper dewatering system, Prepare the dewatering system requirements as per the availability of the market resources
16- Prepare and submit the invoice for payments
17- Prepare progress reports daily, weekly and monthly
Some of the Projects Executed
• Al Reem Island Costal Protection, Abu Dhabi, UAE
Contractor: Abu Dhabi Land General Contracting
Consultant: Alliance Engineering
Work: Costal Protection Shoring secant wall system supported with anchor pre-stressed Piling System, connected with pre-stressed concrete beams
Value: 80, 000, 000 AED Time: 2 years
• Mariam Al Remithy Residential Tower, Abu Dhabi, UAE
Contractor: Al Mezen General Contracting
Consultant: Al Swedi Engineers
Work: Cast in situ shoring system with anchor support System
Value: 2, 250, 000 AED Time: 3 months
• Al Ghaith Towers, Shaikh Zayed Street Dubai, UAE
Contractor: AL Ghaith General Contracting
Consultant: National Engineering Bureau
Work: Shoring Secant Wall, Anchor System, Foundation Piles
Value: 6, 450, 000 AED Time: 4 months
• Reporting directly to Head of Geological Department.
• As Geological Engineer I was responsible for describing drilled samples according to British standards.
• Give test recommendations, supervise and do laboratory soil tests.
• As Geotechnical Engineer I was preparing soil reports according to the BS.5930 Dubai Municipality requirements.
• Specifying soil profile and parameter accordance to building code 1997.
• Giving recommendations for the type of foundation depending on the type of structure and the laboratory test results.
• Responsible for plugging jobs (closing low rate production perforation zones using special hydraulic tools).
• Creating new perforation zones using explosive tools (Guns).
• Using Magnetic; Gamma ray; Ultrasonic; sonic tools for correlation to check the problems in closed productive wells.