Electrical Site Engineer
Phi co. for Electrical and Mechanical works
Total years of experience :8 years, 6 Months
I am an Electrical site Engineer and worked for a well known Electrical and Mechanical projects in Cairo as an Electrical Site Engineer like:-
1- HAYPER-ONE solaymaniya ( cairo - alex ) desert road
---- In this project i was responsible for :-
-The power station set up including Transformers, Generators, Cables, Control panels, Lighting and Power sockets and Earthing.
-------------------------------------------------------------------------
2-FOOD AND BEVERAGE COMPLEX - ALGAZERA MALL - Elsheikh Zayed city - Cairo -
---- In this project i was responsible for :-
A-The power station set up including Transformers, Generators, Cables, Control panels, Power cables from MCC panels to VRF Apparatus and Fresh& Exhaust Fans and the control methods of the Motors like D.O.L & Star-Delta connection and the control of the MCC panels, Power cables from FIRE PUMPS, DOMESTIC PUMPS AND SUBMERSIBLE PUMPS including their methods of starting, Lighting and Power sockets and Earthing..
B- I was responsible for the LOW CURRENT SYSTEM by connecting power and data cables from the equipment to the control Apparatus in the I-T room for :-
1-CCTV system
We connect a cat 6 cable to a normal camera and connect the power cable beside data cable for a PTZ cameras .
2-Sound system
We connect sound cables from the outlet to the rack
3-Fire alarm system
We connect the begin and the end of the loop to the fire alarm rack through a control module and an isolated module
4-Telephone system
We made 100 pair racks in the site and collect all cables to the IT room
5-BMS system
We have a lot of control apparatus to control the Electrical and Mechanical equipment in the project according to the data point schedule .
6- Calculating the total load of the UPS apparatus and connect the cables from UPS to loads.
---------------------------------------------------------------------------
3 - Helwan Factory for NON-FERROUS Industries - Designed by VITKOVICE MECHANIKA a.s. - CZECH REPUBLIC .
---- In this project i was responsible for :--
A-The power station set up including Transformers, Generators, Cables, Control panels, Power cables from MCC panels to VRF Apparatus and Fresh& Exhaust Fans and the control methods of the Motors like D.O.L & Star-Delta connection and the control of the MCC panels, Power cables from FIRE PUMPS, DOMESTIC PUMPS AND SUBMERSIBLE PUMPS including their methods of starting, Lighting and Power sockets and Earthing..
B- I was responsible for the LOW CURRENT SYSTEM by connecting power and data cables from the equipment to the control Apparatus in the I-T room for :-
1-Fire alarm systemWe connect the begin and the end of the loop to the fire alarm rack through a control module and an isolated module
2-Telephone systemWe made 100 pair racks in the site and collect all cables to the IT room