process lead engineer
Velosi Asset Integrity limited
Total years of experience :11 years, 9 Months
• Analyzing, interpreting & optimizing individual well performance; Identifying well intervention opportunities, employing various production surveillance techniques to monitor and optimize well productivity.
• Managing operations of Natural and Artificial Lift Oil wells such as Hydraulic Rod Pump, Electrical Submersible Pumps and Jet Pumps and maintaining Injection water and chemical target.
• Ensuring targeted Chemical EOR (Polymer) is injected and in-line with sub-surface team.
• Reduced unplanned breakdowns by tracking and analyzing performance of producer wells.
• Implementing & optimizing Automated Process Control system for ESP wells and process controls.
• Coordinating and monitoring Drilling, Work-over and Completion work to track various stage of wells, for SIMOPS; taking over well for commencing production.
• Monitoring wells' oil and gas production; performing root cause analysis if production is low and determining & employing method to augment amount being extracted
• Reviewing & analyzing production plan and well integrity; identifying problem areas/shortcomings and recommending to Maintenance Dept. for corrective measures including modification/fabrication works, and so on.
• Participating in project execution, management
of manpower and MOC preparation for future plant expansions to improve on design and operation.
• Performing routine pipeline Pigging operation of crude oil and injection water pipelines.
• Preparing & publishing Daily Progress Reports including Production Data, Test Data, documenting bypass of Interlock Logics and Detectors, JSA and Incident Reporting.
• Developing, directing and managing shift routine & non-routine daily operation activities, including troubleshooting, plant turnarounds and controlling different operating parameters/variables
• Driving well productivity management & improvement initiatives and delivering support to subsurface/development team.
• Leading preparation of technical and commercial justification for well interventions & work overs and preparing input for partners meetings and annual production reports.
• Observing third party in support of project execution providing supervision, support, coaching and guidance to other engineers as and when required.
• Observing safeguard and management of the production / injection well operating envelope and performance interfaces well optimization opportunities in conjunction with Reservoir Engineers and D&C Engineers.
• Performed HPHT Well Head Operations including: o Well Pressure Testing; Well Head Integrity; Hydrate and Corrosion Inhibitor Injection; Tubing Liquid Unloading; Annulus Pressure Maintenance; Well Head Equipment service and maintenance.
• Troubleshoot various Gas Production Systems including: o HP Separation System; Gas Dehydration System; Condensate Separation System; Produced Water Conditioning System; Pig Launcher and utilities like Hot Oil System, Fire Water, Tempered Water and Sea Water Systems.
• Led entire gamut of Gas Plant Operation activities: o Hydraulic WHCP system operations; well activation, well up-line, handovers, choke changes as per production requirement o DCS monitoring in Control Room, PIG Launching and Receiving Operations. o Asset Integrity. o Gas Dehydration and export, condensate
stabilization and export and prepared DPR.
• Monitored production and utility systems; managed operating parameters and equipment operations of Offshore Platform of 200 MMSCFD capacity.
• In-charge of Field Operations with safety as utmost priority.
• Performed Startup & shutdown of plant and units in normal operation and emergency situations.
• Monitor and observe parameters in field and coordinate with panel engineer to ensure smooth and safe operations.
URL removed due to policy violation. Please contact support for further information.