electrical draftsman
Majees Technical Services LLC
Total years of experience :10 years, 3 Months
• Preparing ELV and BMS Schematic/ drawings. As per the instruction of design Engineers.
• Preparation of Power layout.
• Prepare shop drawings & documents related to site.
• Preparing containment drawings for the project team.
• Creating reflected ceiling drawings as per the instruction of design engineer.
• Preparing ELV shop drawings for the ELV projects,
• Taking BOQ from the detailed design and site drawings.
• Prepare as built drawings based on Red-Line markup.
• Preparation of lighting layout.
• Preparation of Power layout.
• Preparation of Parking Management system.
• Preparation of Fire alarm system.
• Preparation of Telephone (Voice) & Computer (Data) Layout.
• Preparation of Public Address system,
• Preparation of CCTV, Master Clock System, Access Control etc.
• Preparation of Distribution Board Detail.
• Showing the Control of Light & Conducting etc.
• Preparation of Detailing Drawing of Shop Drawings.
• Preparation of Cable Schedule, Cable tray and Trunking Schedule etc.
• Preparation of Point Chart (B.O.Q.) as well as Summary.
• Preparation of Single Line Diagram & Riser Diagram.
• sign. Discussing equipment with Designer to suggest the same to the client.
• Design of commercial Interior Lighting/Emergency Lighting/Landscape Lighting etc.
• Preparation of Raceway for data and voice etc.
• Preparation of Earthning layout.
• Working with the engineers on Estimation as well to get the Nos. of New Projects.
• Preparation of lightning layout.
• Preparation of Access Control System layout.
• Preparation of Pids system layout (Fence Controller).
Preparation of Lighting layout.
Preparation of Power layout.
Preparation of Fire alarm system.
Preparation of Telephone (Voice) & Computer (Data) Layout.
Preparation of Music system, CCTV, Access Control etc.
Preparation of Distribution Board Detail.
Showing the Control of Light & Conduiting etc.
Preparation of Detailing Drawing of Shop Drawings.
Preparation of Load Calculation as per the requirement of the client.
Preparation of Cable Schedule, Cable tray and Trunking Schedule etc.
Preparation of Point Chart (B.O.Q.) as well as Summary.
Preparation of Single Line Diagram & Riser Diagram.
Discussing equipment with Designer to suggest the same to the client.
Preparation of Raceway for data and voice etc.
Preparation of Earthing layout.
ALAWI TUNSI EST:
SAUDI ARABIA.
MAKKAH.
JULY 2009 TO AUG 2010
RESPONSIBILITIES:
From 01/08/2009 to 30/07/2010
PROJECT NAME: KING ABDUL AZIZ GENERAL HOSPITAL AL ZAHIR MAKKA SAUDI ARABIA.
Job Responsibilities:-
Preparation of all Electrical drawings as,
Ø Preparation of Lighting layout.
Ø Preparation of Power layout.
Ø Preparation of Fire alarm system.
Ø Preparation of Telephone (Voice) & Computer (Data) Layout.
Ø Preparation of Music system, CCTV, Access Control etc.
Ø Preparation of Distribution Board Detail.
Ø Showing the Control of Light & Conduiting etc.
Ø Preparation of Detailing Drawing of Shop Drawings.
Ø Preparation of Load Calculation as per the requirement of the client.
Ø Preparation of Cable Schedule, Cable tray and Trunking Schedule etc.
Ø Preparation of Point Chart (B.O.Q.) as well as Summary.
Ø Preparation of Single Line Diagram & Riser Diagram.
Ø Discussing equipment with Designer to suggest the same to the client.
Ø Preparation of Raceway for data and voice etc.
Ø Preparation of Earthing layout.
General Studies