Engineer - Water Network
Abu Dhabi Distribution Company
Total years of experience :12 years, 6 Months
• Monitoring day-to-day operations and running arrangements in the water distribution network
• Steering efforts to support the integrity and security of the distribution network
• Detecting & pinpointing leaks on supply pipe and distribution network
• Utilizing provided Leak Noise Correlator to verify points of interest
• Using supplied technology record acoustic sound files across a water distribution network using digital equipment
• Managing preparation & maintenance of Pipe Line Leak Detection records, plans, maps, files & related maintenance
materials
• Directing the activities of assigned Operators and ensuring smooth functioning and error-free workflow
• Investigating reason of breakdown/shutdown/emergency and focusing towards minimizing repetition as well as
commonly occurring problems
• Ensuring safety goals are achieved on the project and supervising implementation of safety procedures
• Conducting inspection of valves of water network and specially fire hydrants, both types to maintain operational conditions, in case of emergency
• Administering Work Orders through company’s ERP System (Maximo), following up on customer complaints to reduce the mean time to repair customer complaints
• Utilizing CC&B to secure the plot details for customer complaints
• Suggesting innovative measures to improve conditions and operations of equipment
Water Network Operations Leak Detection Activities Data Analyst, Demand Forecasting Utility / Maintenance Operations Risk Assessment
Health & Safety Process Improvement Liaison & Coordination, Maintenance Planning Innovation / Automation Troubleshooting
• Generating daily & monthly reports, budget planning and budget accruals providing information such as work undertaken and accomplished including, type of works, location, emergencies and workers & material used
• Executing all customer facing transactions in line with ADDC customer strategy resulting in higher satisfaction and timely delivery of services
• Performing on-site field surveys and writing technical narratives to document processes, design changes and as-built documentation
• Managed production environment with initial onboarding, upgrades; followed production deployment procedures and design the best technical approach with network and access constraints
• Monitored Production Support Processes to document day-to-day support activities, contribute to knowledge base
• Created manufacturing drawings as per applicable standards
• Administered Fabrication Work of Sugar Hopper, Hydraulic Wood Cutting Machine, & S.S. Sugar Hopper Tray
• Arranged plant start-up & shut-down schedules to ensure minimum loss of production time and profits
Completed my graduation on may 2011 with 80.03% aggregate and without any backlogs
URL removed due to policy violation. Please contact support for further information.