MOHD MOINUDDIN, PROJECT ENGINEER

MOHD MOINUDDIN

PROJECT ENGINEER

AL Mazroui Medicals & Chemicals Supplies

Location
United Arab Emirates
Education
Diploma, DIPLOMA IN MECHANICAL ENGINEERING
Experience
15 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 9 Months

PROJECT ENGINEER at AL Mazroui Medicals & Chemicals Supplies
  • United Arab Emirates - Abu Dhabi
  • My current job since October 2015

• Attend Progressive and Technical meeting with the consultant /Client/Contractors for analyzing site progress and dealing activities with suppliers .
• Ensure the job is constructed according to the project specifications, Medical gas system standards, in a profitable way.
• Installation, Design and estimation of Medical Gas Pipeline as per HTM 02-01, 2022.
• Responsible for the Installation of Cryogenic Tanks, Vaporizers, Medical Air Plant, Medical Vacuum Plant and Cylinder Manifolds .
• Installation of the Modular Operation Theatre and Drafting of M.O.T through Auto Cad .
• Knowledge of Installation of Pneumatic Tube System, Hortig, Air log,
• Responsible for the Installation and execution of the complete Medical Gas Pipeline system as per coordination Drawing.
• Coordination with the Contractors /Consultants design, commercial, Procurement, construction, planning, and safety departments.
• Responsible for the Execution of The Laboratory Gas Piping L.P.G and other Lab gases .
• Preparing All Tender documents, Material Submittals, Compliance Sheet as per Tender specifications for approvals from Client or Consultant.
• Prepare Full project Schedule and planning for Project completion as per schedule .
• Responsible for all document control and preparation including: drawing revisions, RFI’s, submittals and permits
• Preparing the B.O.Q for medical Gas Pipeline, Lab Gas and Pneumatic Tube system.
• Daily activity report to Project Manager and Execution Head .
• Preparing Daily work schedule and daily work report for smooth running of Project .
• Supervision on site to all technicians and sub-contractor to finish work as per schedule

PROJECT ENGINEER at GULF DRUG LLC
  • Saudi Arabia - Tabouk
  • February 2015 to August 2015

• Responsible for the installation of the Medical Gas Pipeline complete system .

• Responsible for the erection and commissioning work of pneumatic tube system in hospitals.

• Responsible for the Installation of Medical Gas Pipelines, Brazing, Testing and Commissioning .

• Installation of the Modular Operation Theatre, Designing and Drafting .

• Project Management and coordination with client and consultant .

• Preparing Daily Site activity reports and manage all the employee at the site .

• Responsible for the Installation of Cryogenic Tanks, Vaporizers, Instrument Air Plant, Medical Air Plant.

• Preparing the BOQ, Pipe size and DOT for the Medical Gas Pipeline .

PROJECT ENGINEER at MODULAR CONCEPT INDIA PVT LIMITED
  • India - Delhi
  • February 2013 to January 2015

• Responsible for the installation of the Modular Operation Theatre.

• Responsible for the erection and commissioning work of pneumatic tube system in hospitals.

• Preparing the BOQ quantity of material for the Medical Gas Pipes, wall outlets, Fittings and

Bed Head Unit.

• Responsible for the drawings for Medical Gas Pipelines, Bedhead Unit and Wall Outlet Design through AUTO-CAD .

• Responsible for the Installation of Medical Gas Pipelines, Brazing, Testing and Commissioning

in the Project site.

• Responsible for the Installation of Cryogenic Tanks, Vaporisers, Instrument Air Plant, Medical

Air Plant.

D.C.S Operator & Operation Supervisor at NATIONAL INDUSTRIAL GAS PLANTS
  • Qatar - Doha
  • January 2011 to January 2013

 . Responsible For the erection and commissioning of the Liquid Storage Tanks and Vaporizers .
 Installation Of Medical Gas Pipeline for oxygen in Al - Hamad Hospital ( Qatar)
 Responsible for the Operation Of Air Separation Plant, Carbon-Dioxide plant
 Responsible for the operation and maintenance of the Air separation Plants, Hydrogen Plant, , Nitrous Oxide Plant.
 Monitor process parameters and control within defined limits and take the necessary corrective action in case of emergencies or equipment breakdown to ensure the uninterrupted operation
 Site supervision during the installation and commissioning of the industrial gas plants .
Air separation Plants, Carbon-dioxide plant, Hydrogen Plant, Nitrous Oxide Plant.
 Inspection of the Piping system by studying GA Drawing, P & ID, Isometrics & support Details.
 Prepared daily site activity reports, coordinated site engineering meetings with the vendors and gave feedbacks and recommendations to senior engineers
 Supervise all Mechanical and Piping construction activities to ensure all the works are carried out as per project specification and schedule.

SITE ENGINEER at POLLUCON ENGINEERING SERVICES
  • India - Faridabad
  • August 2008 to January 2011

 Project co-ordination, Design, Erecting and Commissioning of Water, Sewage and Effluent Treatment Plants.
 Supervision on site during civil work and installation of mechanical items.
 Responsible for management of material and human resources on sites.
 Keep a record of the daily project development and submit it to the management head.
 Drafting of complete project drawing with, Assembly drawing, Layout Plan, Piping Details and P& I Diagram and G.A.Drawing using Auto Cad 2009.
 Responsible for preparing specifications and equipment sizing which includes tank & pipe sizing for water & waste water treatment plant layout and design.
 Preparing B.O.Q of materials

Education

Diploma, DIPLOMA IN MECHANICAL ENGINEERING
  • at ALIGARH MUSLIM UNIVERSITY
  • July 2008

I HAVE COMPLETED MY DIPLOMA IN MECHANICAL ENGINEERING WITH 69 %.

Specialties & Skills

Oil and Gas
Team Management
AutoCAD
Operational Control
Project Management
AUTO CAD
M.S.OFFICE
GAS PLANTS OPERATION

Languages

English
Expert
Hindi
Expert