Total Years of Experience: 21 Years, 2 Months
August 2017
To September 2020
Project Construction Manager, PMP®
at Alghanim International Co. ( ALG Int.), http://www.falghanim.com
Location :
Kuwait - Al Zour Mina Saud
Project's involved were Mosque, Cafeteria and Training Centre building's @ Al-Zour "NRP" new Refinery Project ( $19bn ), under the Supervision of Fluor's Joint venture FDH JV team which was selected by (KIPIC) as (EPC) Contractor.
Job Duties & Capability :
___To Oversee total Constr. Execution & Progress on timely or earlier Completion and within budget.
___To Follow-up and implement Safety and Qa/Qc Procedures.
___To Ensure adherence with Company, Client, Project Policies, Procedures and Standards.
___To Lead a large Constr. Team with different skills & Categories, Improve Team’s Performance.
___To Raise potential Time Cost Impact and Variation Report, and to Evaluate Value Engineering with Cost saving performance.
___To Ensure Harmonious and Successful Operation of Construct and Problem resolution.
___To Provide direction to Planning, Scheduling, Engineering and Construction functions.
https://www.fluor.com/projects/engineering-construction-al-zour-refinery-kuwait
Job Duties & Capability :
___To Oversee total Constr. Execution & Progress on timely or earlier Completion and within budget.
___To Follow-up and implement Safety and Qa/Qc Procedures.
___To Ensure adherence with Company, Client, Project Policies, Procedures and Standards.
___To Lead a large Constr. Team with different skills & Categories, Improve Team’s Performance.
___To Raise potential Time Cost Impact and Variation Report, and to Evaluate Value Engineering with Cost saving performance.
___To Ensure Harmonious and Successful Operation of Construct and Problem resolution.
___To Provide direction to Planning, Scheduling, Engineering and Construction functions.
https://www.fluor.com/projects/engineering-construction-al-zour-refinery-kuwait
July 2012
To August 2017
Construction Project Manager, PMP®
at Arabian Construction Co. ( ACC ), http://www.accsal.com
Location :
Lebanon - Beirut
Construction of B11 - Residential Bldg 2014-2017 http://www.b11beirut.com, a Landmark Project at Centre Ville _ Beirut (First bldg to Obtain LEED with Gold rating)
Construction of M1 _ Mika-1 Offices Bldg 2011-2014
http://www.m1building.com, at Down town _ Beirut, a Landmark Project at Centre Ville
Construction of M1 _ Mika-1 Offices Bldg 2011-2014
http://www.m1building.com, at Down town _ Beirut, a Landmark Project at Centre Ville
February 2010
To July 2012
Construction Manager, PMP®
at GROUP-3 Engineers Contractors LLC Since 1972 ( Gr.3 ), http://www.g3cons.ae
Location :
United Arab Emirates - Abu Dhabi
Construction of Capital Centre Tower, In Exhibition Center Area (ADNEC) Abu Dhabi; The International Tower (US$100Million), http://www.internationaltower.ae
7 Fl Parking (770 Cars), ( 4B+Gr+P1/2+28 Fl) Multi-stories Office bldg, Area=84000M2, H=115M covered 16000M2 Unitize Glaz Syst & 3000 Alum Clad.Panels, built with 42000M3 & 8200Ton, having 12 HS Lifts (6 M/Sec) & 1 Serv. Lift (4 M/Sec).
7 Fl Parking (770 Cars), ( 4B+Gr+P1/2+28 Fl) Multi-stories Office bldg, Area=84000M2, H=115M covered 16000M2 Unitize Glaz Syst & 3000 Alum Clad.Panels, built with 42000M3 & 8200Ton, having 12 HS Lifts (6 M/Sec) & 1 Serv. Lift (4 M/Sec).
November 2004
To December 2009
Construction Manager / Project Engineer, senior
at Al-HAMAD Construction & Developments Co.WLL. ( AHCD ), http://www.al-hamad.com
Location :
Bahrain - Manama
---From Jul-2008-2009...@ Villamar project @ Bahrain Financial Harbor (3 HR twisting towers of 57 Stories with 30, 000M2 Podium & SkyVilla 7 Stories, Total Area 250, 000.M2 at Cost US$ 430 Millions), http://www.villamarharbour.com
---From Apr-2007-2008 ...@ Marriot Hotel project (2HR towers of 22 Stories Residential_188 Aparts, 34, 000.M2 Area at Cost US$ 52 Millions), http://www.marriott.com/hotels/travel/baher-marriott-executive-apartments-manama-bahrain
---From Nov-2004-2007...@ Bahrain Financial Harbor project (2 HR towers of 52 Stories Office Bldgs, 124, 000.M2 Area at Cost US$ 190 Millions), http://www.bfharbour.com
---From Apr-2007-2008 ...@ Marriot Hotel project (2HR towers of 22 Stories Residential_188 Aparts, 34, 000.M2 Area at Cost US$ 52 Millions), http://www.marriott.com/hotels/travel/baher-marriott-executive-apartments-manama-bahrain
---From Nov-2004-2007...@ Bahrain Financial Harbor project (2 HR towers of 52 Stories Office Bldgs, 124, 000.M2 Area at Cost US$ 190 Millions), http://www.bfharbour.com
February 2001
To November 2004
Project Engineer / Site Engineer
at Fujairah National Construction Co.LLC. ( FNC ), http://www.fnc.ae
Location :
United Arab Emirates - Dubai
---From Sep-Nov 2004...@ Trust International officeTower, Bahrain (22 Story office bldg, cost $ 22 Millions), http://www.smehboob.com/portinternational7.html
---From Feb-Sep 2004...@ Ahli United Bank new head Quarter, Bahrain (7 Story bldg, cost $ 17.5 Millions), http://www.ahliunited.com/bhabout.html
---From Apr-2002-2004...@ Al-Moayyed Tower, Bahrain (47 Story bldg, cost $ 52 Millions), http://www.designbuild-network.com/projects/almoayyed/
---From Feb-2001-2002...@ Garden Village, Dubai-Jebel Ali (28 Bldgs of 3 story & 36 flats each, cost $30 Millions)
---From Feb-Sep 2004...@ Ahli United Bank new head Quarter, Bahrain (7 Story bldg, cost $ 17.5 Millions), http://www.ahliunited.com/bhabout.html
---From Apr-2002-2004...@ Al-Moayyed Tower, Bahrain (47 Story bldg, cost $ 52 Millions), http://www.designbuild-network.com/projects/almoayyed/
---From Feb-2001-2002...@ Garden Village, Dubai-Jebel Ali (28 Bldgs of 3 story & 36 flats each, cost $30 Millions)
August 2000
To February 2001
Civil Site Engineer
at Arabian Construction Co. ( ACC ), http://www.accsal.com
Location :
Lebanon - Tripoli
---Reconstruction of Housing Lebanon, Tripoli ( US$ 20 Million) 78 residential building of total 980 units with school, shops etc....... In Charge of Steel Yard for the project.
July 1999
To July 2000
Site Engineer - Officer in Military
at Lebanese Army in Beirut - Lebanon
Location :
Lebanon - Beirut
Reconstruction of Military Warehouses, include all type of
Maintenance, In charge of Aluminum, Glass, Steel, Wood & Block work Workshop for all Military Job in Lebanon ( Supply & Installation ); Controlling more than 50 Skilled / Unskilled Soldiers.
Maintenance, In charge of Aluminum, Glass, Steel, Wood & Block work Workshop for all Military Job in Lebanon ( Supply & Installation ); Controlling more than 50 Skilled / Unskilled Soldiers.
Share on Facebook
Share on Twitter
Share Via Email