mohmmad anas saidalavi k k koduvaparamban koderi, Project Engineer Electrical

mohmmad anas saidalavi k k koduvaparamban koderi

Project Engineer Electrical

Al Khalejia Co. For Mech. & Electrical Proj.(KAHROMIKA)

Location
Qatar
Education
Bachelor's degree, ELECTRICAL AND ELECTRONICS
Experience
12 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :12 years, 10 Months

Project Engineer Electrical at Al Khalejia Co. For Mech. & Electrical Proj.(KAHROMIKA)
  • Qatar - Doha
  • My current job since April 2014

Role and Responsibilities

• Supervision and Coordination for the execution of 11KV KAHRAMAA Schemes.
• Installation of 11KV (Indoor and outdoor) substations and per Kahramaa rules and regula-tions (Installation Switchgear panels, 11KV RMU, Transformers up-to 2500KVA, 3.3KV Panels and battery chargers).
• Supervision of UG XLPE 11kV cable Laying Jointing and termination.
• Testing & Commissioning of UG XLPE 11kV cable (IR testing, Hi-Pot, Live-phasing test).
• Control wiring Scheme Designing and Execution.
• Supervision of Testing and commissioning of Switch gears and TX.
• Coordinating for the stage wise inspections with Client Inspector and getting approval for completed work.
• Co-ordination with the Shutdown engineer during Sub-Station Energization.
• Clearing punch list given by Consultant/Inspector on time and raising request for re- inspection.
• Daily planning and scheduling the work and Man power management.
• Monitoring of Sub-contractors work and confirms the work is completed as per the re-requirements and specifications.
• Attending Client weekly meeting for the updating the status of work.
• Submitting Daily updated Report to the client.
• Coordinating with the shut down activities.
• Ensuring that all work is carried out as per the site safety rules and regulations.

Projects Handled

1. Project Name :- Student Housing project (Qatar University)
Project Details: - HV Substation Installation Testing and commissioning
Client: - Bluestar W.L.L
2. Project Name :- Sheraton Hotel Renovation Project
Project Details: - HV and LV Cable Installation, Jointing, Termination, Testing and Com-missioning.
Client: - EFECO Qatar
3. Project Name :- Raf A2 desalination project
Project Details: - HV and LV Cable Installation, Jointing, Termination, Testing and Com-missioning.
Client: - Toyo -Thai Corporation
4. Project Name :- Raf A3 Reverse Osmosis Project
Project Details: - HV and LV Cable Installation, Jointing, Termination, Testing and Com-missioning.
Client: - Toyo -Thai Corporation
5. Project Name :- Msherib Down Town Project (Phase -1C)
Project Details: - Complete 11KV network Installation Testing and Commissioning.
Client: - Brrokfield Multiplex
6. Project Name :- Al Shahaniya Road Project
Project Details: - Complete 11KV network Installation Testing and Commissioning (Distri-bution S/S - 19 Nos and HV Cable works).
Client: - Qatar building Company

ASSISTANT ENGINNER at KERALA STATE ELECTRICITY BOARD
  • India
  • September 2012 to April 2014

• All individual tests of Power transformer, Current transformer, Voltage transformer, Circuit breaker
 Tan δ test for transformers, CT, Transformer bushing and CVT.
 Control panel including
• Alarm annunciations & Synch-check scheme.
• Dc battery discharge test.
• Testing and commissioning of protection relays and their respective schemes including.
• Distance protection scheme and auto-reclose scheme.
• Trip circuit supervision schemes of ABB, ALSTOM and CROPMTON GREEVES.
• Circuit breaker failure scheme of ABB, ALSTOM and CROPMTON GREEVES.
• 220kv/110kv autotransformers and 110kv/11kv transformers protection schemes.



Projects Handled

(1) 220kV AREACODE SUBSTATION-11KV PANEL REPLACEMENT-10 No’s

*Whole project scheduling and coordinating.
*All individual tests of Current transformer, Voltage transformer, Circuit breaker, Bus-bar.
*Testing of 11 kV Cables.
*Done the whole control wiring.
*Verification of CT & PT circuits through primary and secondary injection.
*Stability of bus bar protection by verification of stable and unstable conditions.
*Interlocking of circuit breaker, disconnecting/earthling switch

(2) 110kV MALAPPURAM SUBSTATION- 48V, 200AH LEAD ACID CELL INSTALATION

*Inspection and Installation of Batteries in appropriate manner.
*Setting the charging current of charger & Duration of it.
*Time to time inspection of each aspects.
*Discharging the battery.
*Final Inspection & Commissioning.
*Report preparation along with its efficiency calculations

Graduate Engineer Trainee at POWER GRID ELECTRICAL ENGINEERING & CONTRACTORS
  • India
  • July 2011 to September 2012

 Designing Physical layout, Schematic diagram and Earthling designing according to the projects.
 Supervising the whole project including the site.
 Work management according to the schedule.
 Testing of the insulation resistance, earth resistance, continuity, polarity.

Education

Bachelor's degree, ELECTRICAL AND ELECTRONICS
  • at LBS COLLEGE OF ENGINEERING
  • June 2011
High school or equivalent, SCIENCE,MATHEMATICS,ENGLISH
  • at KMHSS
  • April 2006

Science, mathematics

High school or equivalent, ELECTRICAL AND ELECTRONICS ENGINNERING
  • at JAMIA SALAFIYA ENGLISH SCHOOL
  • April 2004

Specialties & Skills

Electrical Maintenance
Electrical Testing
Electrical Engineering
Electrical CADD
Electrical Safety
control wiring of panels
substation equipment maintanenece
electrical cadd
Testing power equipments
Trouble shooting
Testing and commissioning of Power cables

Languages

English
Expert
Malayalam
Expert
Hindi
Intermediate
Arabic
Beginner
Tamil
Intermediate

Training and Certifications

• Electrical Supervisor Grade B license (PERMIT NO: 11207) (Certificate)
Date Attended:
April 2014
Valid Until:
April 2019

Hobbies

  • Trouble shooting, control wiring designing, watching movies, travelling.