MEP Drafts
GMP Technical Services LLC
Total years of experience :10 years, 4 Months
Project details In Dubai UAE:-
* Project : G+2+ Residential Villas-14Nos
POST APPLIED FOR : MEP CO-ORDINATION / HVAC
Quoz 4th
, Dubai U.A.E
Designation : HVAC & MEP Co-Ordination Draughtsman.
* Project : G+1+R, Sienna Views Villas-35Nos
Jumeira Golf Estates Dubai U.A.E
Designation : HVAC & MEP Co-Ordination Draughtsman.
* Project : G+M+R, Multipurpose Work Shop
Project : 2B+G+21, Residential Building Burj Pacific
Conversion AutoCAD MEP 2D drawings into 3D Revit MEP model.
Checking Clashes report using Revit & Navisworks Manage.
Responsible for implementing Revit standards, templates and Revit family creation.
Provided Revit support the MEP department on design & technical issues.
Experienced collaborating 3D models with Structural, Architectural and MEP for coordination
reviews.
Preparing MEP Drawing in Revit & AutoCAD.
Having Experience in Builders Work Drawing & Shop Drawings.
I can make all types of Drawing as per markups.
Having Experience in Microsoft Excel & Microsoft Word.
Preparation As Built Drawings for all MEP services.
Preparation of all the internal Coordinated services Layout and making Reflected Ceiling plan
layout.
Preparation of HAVC Equipment section drawing as per instruction.
Preparation Of Schematic Drawings.
Preparation & Maintaining of Drawing Register
Creating sections for critical areas and coordination between different disciplines for level and
routes.
All types of Building services coordinate with Architectural & Structural.
Utilizing Building Information Modeling (BIM) at the corporate and projects levels.
Drafting - Piping, Ducting, Plumbing, Sanitary, Electrical Tray, Lighting, Power & Fire
Fighting 3D modeling & coordination on Revit Software. Mechanical/ETS/Plant rooms Details.
Various high rise Residential, Office and Hotels Buildings under the supervision of the
concerned Senior Mechanical Design Engineer, and drafting using AutoCAD & Revit MEP
software.
Supervised the installation of the HVAC system during the construction, In accordance with
technical, quality and safety requirements.
Preparing piping specifications.
Preparing pipe support.
Responsibility for Duct designing and drafting
Working out Bill of Material for piping & HVAC system.
Good knowledge of reading P&I diagram.
Preparation of Bill of Quantity and Technical specification for Chiller, Pump, AHUs and
Ventilation fans.
Drafting of general piping and Chilled water piping layouts.
Calculating of Heat load, ducting, grill’s sizes and piping.
Piping and structural project including piping and pipe line from boiler house to process plant