Lead Electrical Engineer (Operation and Maintenance) في Air Liquide
  • المملكة العربية السعودية - ينبع
  • أشغل هذه الوظيفة منذ أغسطس 2016

•Electrical Maintenance Leader responsible for Engineering and Maintenance of Electrical Systems at Air Liquide Hydrogen generation unit Yasref Refinery
•Currently involved in creation of PM, Job Plans and SOP for Hydrogen Plant. Formulation of Preventive Maintenance Schedule and Procedures.
•Developed maintenance regime of all system and incorporated in CMMS, Maximo.
•Responsible for creating maintenance standard procedures (MSP’s) for electrical equipment including Transformers, Switchgear, PDB’s, MV and LV Motors, Startup Heaters and UPS.
•Implementation and Commissioning of MOC's(VFD's and ENMCS)
•Develop and maintain Electrical integrity related KPI’s
•Successfully completed Major Turnaround and achieved all planned goal well ahead of time for Electrical Activities.
•Responsible for Vendor coordination and TAR planning.
•Development of new Asset Policies and maintenance Strategy
•Task list / Job Plan & Maintenance Plan development
•Assist spare parts planning

Electrical Maintenance Engineer في ISS International SPA
  • الإمارات العربية المتحدة - أبو ظبي
  • سبتمبر 2014 إلى أبريل 2016

ADCO BAB Gas Compression Plant for Gas Station#1, 2, 3 and Water Clusters
•Electrical Maintenance Engineer responsible for Engineering and Maintenance of Electrical System of ADCO (Abu Dhabi Company for onshore oil operations).
•Currently involved in creation of Preventive maintenance work instructions for Gas Station of ADCO. Formulation of Preventive Maintenance Schedule and Procedures for Electrical Creation and development of Asset register
•Responsible for creating maintenance standard procedures (MSP’s) for electrical equipment including 440Kv/132Kv, 132Kv/33KV, 3.3KV and 415V Transformers, Switchgear, PDB’s, Motors and UPS.
•Asset Register as per company tagging philosophy / ISO14224
•Technical Data Collection & Assignment on Taxonomy pinnacle as per ISO 14224
•Development of new Asset Policies and maintenance Strategy
•Review of existing Asset policy and maintenance Strategy thru FMECA
•Identifying Safety critical equipment by using Criticality Analysis
•Task list / Job Plan & Maintenance Plan development
•Assist spare parts planning

Commissioning & Startup Engineer في Petrofac International
  • الإمارات العربية المتحدة - أبو ظبي
  • يوليو 2012 إلى سبتمبر 2014

• Report to Lead commissioning Engineer for Pre Comm and Commissioning of all electrical systems associated with NGL Gas Plant.
• Co-ordination with multi-national vendors & Subcontractors.
• Production of test procedures, check sheets and associated job cards.
• Commissioning and startup of Siemens (1) 132Kv & (1)33Kv GIS Switchgear, ABB (5) 11kv, (6) 3.3kv and (12) 415v Switchgear.
• Commissioning & Testing of (3) 132/33kv, (6)33/11kv, (4)33/415Kv, (10)11kv/415v transformers and AVR panel.
• Responsible for solo and load run testing of HV & LV motor and compressor’s up to 34 MW and integrate it with ECS and DCS.
• Responsible for doing REF, stability test, End to end checking, Bus Bar Diff, Transformer Diff, Line Diff, Motor Protection, ATS MTS function and synchronizing check for switchgear.
• Commissioning and startup of Gutor Schneider Electric UPS of 110VDC, 240VAC and 415VAC.

E&I ENGINEER في ROBT STONE (ME) LLC
  • الإمارات العربية المتحدة - أبو ظبي
  • نوفمبر 2011 إلى يونيو 2012

• Installation and commissioning of Electrical panels, SACP & ICCP System, ATS panel, Generator for back up.
• Responsible for generating electrical/technical submittals, shop drawings, value engineering proposals and RFI’s.
• Management and coordination on the whole on site of the Cabling, power / control / instrumentation, I/C including reporting and updating of the cable, Erection on the whole of cable trays.
• Ensure that all works are carried out as per the approved method statements and drawings.
• Commissioning of 415V UPS and Battery Banks.
• Installation of Lighting fixtures, Fire alarm Control System.

Startup and Commissioning Engineer في RA Engineering
  • باكستان - لاهور
  • يونيو 2011 إلى نوفمبر 2011

Installation and Commissioning of 15MW Power House.

Client: Sapphire Group Pakistan
• Installation & Commissioning of 8x1MW and 4x1.6MW caterpillar and Jenbacher Gas powered Gensets.
• Commissioning & Site acceptance test (SAT) of 11KV/415V transformers and AVR panel.
• Testing of CTs, PTs and CB.
• Responsible for Lock Out and Tag Out procedures at M.C.C and coordinating P.T.W, s.
• Supervision of the day-to-day witnessing of the installation of all electrical equipment as transformer, switchboard LV/HV, cabling, electrical motor, etc including those fitted as part of a unit.
• Carry out inspections, surveys and checks to ensure electrical equipment installation and testing is as per Project Specifications
• Controlling of GCB and MCB with ComAP PLC module in case of power Supply failure from Government.
• Responsible for supervision of commissioning technicians and allocation of daily work routines.

Assistant Manager E&I في Dandot Cement Company Limited
  • باكستان
  • نوفمبر 2010 إلى يونيو 2011

• Responsible for operation and maintenance of Mitsubishi 132/6.6kv switchyard, switchgear and transformer.
• Maintenance of various Transformers, M.V, L.V, Inverters, Batteries, Motors, and Motor operated dampers, Control panels, and Safe AC system.
• Responsible for maintenance and ensure smooth running of plant including Query, RAW Mill, Cement Mill, Kiln and coal mill.

Trainee Engineer في Gulshan Weaving Mill
  • باكستان
  • يونيو 2010 إلى فبراير 2011

Operation and troubleshooting of Gas Enginators.
Waukesha Gas Engine 1125 KVA x 9 (L5904LT)

الخلفية التعليمية

بكالوريوس, Electrical (Electronics)
  • في Bahauddin Zakariya University (BZU)
  • يوليو 2010

Specialties & Skills

Commissioning
Maintenance
Management
Asset Management
Commissioning
Installation
Prevantive maintenance
Electrical Maintenance
Maintenance

اللغات

الأوردو
متمرّس
الانجليزية
متمرّس

العضويات

Pakistan Engineering Council
  • Registered Pakistan Engineer
  • October 2009
Saudi Council of Engineers
  • Registered Electrical Engineer
  • August 2016

التدريب و الشهادات

ETAP (تدريب)
معهد التدريب:
ETAP
تاريخ الدورة:
August 2017
Sicam PAS troubleshooting (تدريب)
معهد التدريب:
Siemens Germany
تاريخ الدورة:
October 2017
المدة:
40 ساعة
Click to edit certification nameBasic First Aid (تدريب)
معهد التدريب:
GTSC (Gulf Technical & Safety Training Center L.L.C)
تاريخ الدورة:
November 2011
Basic Fire Fighting (تدريب)
معهد التدريب:
GTSC(Gulf Technical & Safety Training CenterL.L.C)
تاريخ الدورة:
November 2011
Permit To Work(PTW) (تدريب)
معهد التدريب:
Dolphin Energy
تاريخ الدورة:
June 2012
H2S/Breathing Apparatus (تدريب)
معهد التدريب:
GTSC (Gulf Technical & Safety Training Center L.L.C)
تاريخ الدورة:
November 2011
GASCO Permit To Work (PTW) (تدريب)
معهد التدريب:
GASCO
تاريخ الدورة:
February 2012