Mostafa El-Sayed Mohammad Hemeda, Senior Instrument Supervisor

Mostafa El-Sayed Mohammad Hemeda

Senior Instrument Supervisor

TÉCNICAS REUNIDAS

Location
Egypt - Alexandria
Education
Bachelor's degree, Communication & Electro-physics
Experience
13 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 6 Months

Senior Instrument Supervisor at TÉCNICAS REUNIDAS
  • Saudi Arabia - Eastern Province
  • April 2012 to July 2013

Técnicas Reunidas are an international general contractor, engaged in the engineering, design and construction of various types of industrial facilities for a broad spectrum of customers throughout the world, including many of the principal national oil companies as well as several multinational companies.

Highlights
•Gained solid exposure of Applied Standards (ARAMCO Standards “SAES & SAMS” - 2008, NEMA I, II, IEC etc.) to accomplish greater operational effectiveness.
•Recognized for bringing down operating cost on account of energy usage by more than 30%.
•Formulated Project Execution Plan and prepared Project Execution Process Manual.

Key Responsibilities
•Independently handled workshop drawings & facility equipments in addition to technical support for Instruments construction works for providing solutions to any unexpected technical difficulties.
•Coordinated with other disciplines using relevant supported documents “Mechanical Isometrics” for proper Installation to eliminate bottlenecks in maintenance.
•Meticulously handled the activities as per the project specification complete with their relevant technical papers (Certificates, Data sheets, wiring diagrams etc.) to deliver the project within defined time and costliness.
•Negotiated and contracted with contractors and suppliers for materials and services with the most competitive rates.
•Formulated a plan for the procurement of spare parts for the related equipments from the manufacturers for saving time.
•Responsible for crafting electrical estimation of electrical projects to eliminate bottlenecks in maintenance.
•Overseen all phases of project execution; approve engineering/design changes, troubleshot and resolved complex technical problems, consistently met project deadlines and highest possible quality standards.
•Instrumental in framing on-site and off-site Emergency Management Plans and conducted safety drills periodically to familiarize the personnel with Emergency Management Plans.
•Provided on-site Management and quality control to ensure projects met time and budget requirements, and are built in accordance with contract documents.

PROJECTS HANDLED

Title : SENIOR INSTRUMENTS SUPERVISOR
Project Duration : From 12th Apr 2012 Up to 15th Jul 2013.
Project : Manifa Co-Gen & Main Substations Project
Client : ARAMCO

E&I Project Engineer at Contracting and Services for Industry (CSI)
  • Egypt
  • February 2007 to March 2012

CSI is an engineering and contracting company found in 1992 and deals in a wide variety of construction services in all industrial sectors.

Highlights
•Credited for modifying the control system and reorganizing the wiring to be compatible with the new digital controller.
•Structured annual operational budget and implemented control measures to contain expenses within defined limits.
•Propagated Quality Circle movement and developed quality culture in the work force to achieve quality leadership in the industry.

Key Responsibilities
•Identified and finalized the workforce ensuring quality supply of materials for effective project development.
•Actively involved in Erection, Calibration, Testing, and Commissioning of Instruments. Ensured adherence to Safety standards in all functional areas and implementing measures for enhancing safety levels.
•Comprehension and assimilation of contractual obligations, rights, and scope of work. Engineered preparation of the MOU’s, Legal Drafting and other contractual documents.
•Drawn up plan for preventive maintenance, TPM, OEE concepts & instruments to increase machine uptime and equipment reliability.
•Deftly handled the erection, installation, testing & maintenance of field instruments including preparation of instrument layouts for the project as per the process needs.
•Efficiently managed a group of Technicians and Contractors for preventive maintenance, and breakdown maintenance.

PROJECTS HANDLED

Title : Instrument Supervision Engineer
Project Duration : 1st Apr 2011 - 01 Apr 2012
Main Contractor : MAS
Project : Oil Farms
Client : Total France

Project Duration : 10th Nov 2010 - 28th Mar 2011
Main Contractor : Technomont KT
Project : El Arish EMG Gas Compression Station - Phase II
Client : East Mediterranean Gas Co.

Project Duration : 1st Nov 2009 - 20th Oct 2010
Main Contractor : Contracting & Services for Industry (C.S.I)
Project : 20 HN NITROGEN GENERATOR SPHINKX GLASS EGYPT
Client : Air Products Co. - England

Project Duration : 13th Jan 2009 - 15th Oct 2009
Main Contractor : Petrojet
Project : Burullus Gas Compression Station - Phase V
Client : Burullus Co.

Project Duration : 1st Feb 2008 - 12th Jan 2009
Main Contractor : Contracting & Services for Industry (C.S.I)
Project : 6th of October SILPA 140 - Air Separation Unit
Client : AIR LIQUIDE Co.

Project Duration : 1st Feb 2007 - 31st Jan 2008
Main Contractor : KTI
Project : El Arish EMG Gas Compression Station
Client : East Mediterranean Gas Co.

Instrument Field Engineer at BONATTI
  • Libya
  • July 2005 to June 2006

Bonatti is an International General Contractor which provides Engineering, Procurement, Construction and Operation & Maintenance Services to the Oil & Gas and Power Industry.

Highlights
•Framed strategies for various Civil and Mechanical sub-stations related activities to ensure best value for the company in compliance with HSE & quality requirements.
•Initiated the system of WOW (War on Waste) & Quality Circle.
•Designed and developed cost & energy saving techniques/measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget.
•Organized various training sessions for the team to enhance their performance.

Key Responsibilities
•Investigated the Design site requirements & resolved the Primary Design matters and other operational problems.
•Maintained effective coordination between sub-contractors & client, in addition to coordinating the installations and erection inspection requirements to ensure cost effective workability.
•Donned the responsibility of review, modification & maintenance of QMS manual.
•Devised effective strategies for overall general maintenance of process plant and equipments on electro & an electronic control system.
•Built & nurtured relations with Government Authorities and obtained approvals for the projects.
•Entrusted with the onus of preventive maintenance of the HT / LT System, DG, UPS, DC power plants to ensure 100% uptime.
•Established plan for preventive maintenance of the Distribution System, Meters & other equipments and enhanced machine up time & equipment reliability.
•Formulated detailed budget for commissioning project, planned schedule of activities, and mobilized resources - materials and manpower for successful execution.

PROJECTS HANDLED

Company : BONATTI - LIBYAN BRANCH
Title : INSTRUMENT FIELD ENGINEER
Project Duration : From 19th Jul 2005 up 3rd Jul 2006
Main Contractor : Snamprogetti Lummus Gas Ltd.
Project : West Libya Gas Project Mellitah Plant (WLGP)
Client : AGIP Gas BV Co.

E&I Engineer at Carlo Gavazzi Egypt
  • Egypt
  • January 2001 to June 2005

July 2006-November 2006: E&I Engineer

PROJECTS HANDLED

COMPANY : CARLO GAVAZZI EGYPT
TITLE : INSTRUMENT SUPERVISION ENGINEER
Length of position held : 30th July 2006 - 30th Nov 2006
Main Contractor : SIEMENS AG
Project : Kureimat Power Station II, 1X750 MW (Normal) Combined Cycle
Client : Upper Egypt Electricity Production Co.

Length of position held : From 19th Jul 2005 up 3rd Jul 2006
Main Contractor : BONATTI - Under supervision of Snamprogetti Lummus Gas Ltd.
Project : West Libya Gas Project Mellitah Plant (WLGP)
Client : AGIP Gas BV Co.

Project Duration : From 24th Nov 2004 up 12th Jul 2005
Main Contractor : SIEMENS AG.
Project : Nubaria Power Station I&II, 2X750 MW (Normal) Combined Cycle.
Client : West Delta Electricity Production Co.

Project Duration : From 5th Dec 2003 up to 23rd Nov. 2004
Main Contractor : DLC
Project : Damietta LNG Tanks.
Client : Spanish Egyptian Gas (SEGAS)

Project Duration : From 25th May 2003 up to 4th Dec. 2003
Main Contractor : Carlo Gavazzi - Egypt.
Project : Rashid Petroleum Co. Rosetta Gas Field Development Phase 1A.
Client : Rashid Petroleum Co.

Project Duration : From 25th Feb. 2003 up to 24th May 2003
Main Contractor : Bechtel Intec. Consortium
Project : West Delta Deep Marine Concession Scarab / Saffron Field Development
Client : Burullus Gas Co.

Project Duration : From 02nd Jun. 2002 up to 24th Feb. 2003
Main Contractor : Techint Chimi Montubi (T.C.M).
Project : Port Said Power Plant
Client : E.D.F Egyptian Engineering Co. (3ec)

Project Duration : From 24th Sep. 2001 up to 1st Jun 2002
Main Contractor : Techint Chimi Montubi (T.C.M)
Project : Suez Gulf Power Plant
Client : E.D.F Egyptian Engineering Co. (3ec)

Project Duration : From 15th Jan. 2001 up to 23rd Sep. 2001
Main Contractor : Foster Wheeler France
Project : AMOC Lube Oil Expansion
Client : Alexandria Mineral Oil Company (AMOC)

Highlights
•Introduced several modifications to reduce incidences of breakdowns.
•Established plan for ensuring compliance to all HSE activities and practices.
•Nominated as an “Incident Controller” to respond to the crisis within the shortest possible time, and guide the staff to handle the crisis in a safe and effective manner.
•Designed & developed SOP’s & SMP’S and ensured its implementation.

Key Responsibilities
•Closely monitored different electrical activities that included MV/LV Switchgear installation, LV Bus duct assembling, Cables Laying, Termination and Testing (MV, LV, Control), Cable Ladders, Conduits Fabrication and Installation, Grounding & Lightning System, Cathodic Protection System, and Lighting System.
•Systematically got prepared and maintained documents specially Test Certificates, Drawings & Manuals for completion of the project.
•Ensured fixation of suitable/experienced Vendors for various Annual Maintenance contracts of systems/equipments and recommended spares by various equipment manufacturers/suppliers.
•Drove the efforts for loop and logic checking of instruments and its protected systems during the commissioning of the plant.
•Effectively liaised with OEM for modifying the arrangement.
•Strategized and initiated plan for inspection, shutdown jobs preparation & execution, Breakdown analysis & action plans and preparation of annual maintenance plans.

E&I Engineer at Contracting & Services for Industries
  • Egypt - Alexandria
  • July 1999 to December 2000

PROJECTS HANDLED

Project Duration : From 1st Nov 1999 up to 31st Dec 2000
Main Contractor : Technip-Italy
Project : Naphtha Reformer Complex
Client : Alexandria Petroleum Company (A.P.C.)

Project Duration : From 7th June 1999 up to 3rd Oct. 1999
Main Contractor : Siemens AG.
Project : Flat Steel Project (F.T.M/F.S.M./F.P.W)
Client : Alexandria national Iron steel Dekhela (ANSDK)

Education

Bachelor's degree, Communication & Electro-physics
  • at Faculty of Engineering, Alexandria University
  • June 1999

Graduation Project •CDMA Mobile System (Code Division Multiple Access). •Graduation Project Grade: "Excellent" TRAINING •Alexandria petroleum company (A.P.C.) - Electrical section (power & communication) •El-Nile for Matches Company - Maintenance Department COURSES •PLC (Siemens S7-300/400) Basics

Specialties & Skills

Project Management
Instrumentation
Commissioning
Installation
Maintenance Management
Instrumentation, Instruments Installation with relevant process & pneumatic hook up
Strategic Planning, Technical Consulting, Functional Test, Product Testing, Project Management
Work Shop Drawings, Operations/Maintenance, Quality Control/Testing, Erection/Fault Analysis
Cables Laying & Termination, Cable Trays Fabrication & Installation, Loops Folders Preparation
Fire & Gas system Installation, Low Current System (Telecommunication), Indoor Installation
Crisis Management, Self-motivated, Time Management, Motivation, Communication
Critical Thinking, Decision Making and Problem Solving, Operations Management, Risk Management
Team Building, Techno-commercial Expertise, Manpower Management, Contract Administration
Troubleshooting, Training & Development, Cross Functional Coordination, Client Servicing
Pre-commissioning & Commissioning, Measurement & Control Instrumentation, Technical Data Design
Computer related skills: MS office, AutoCAD, MS Project
Fire Fighting System, Liaison/Negotiations, Energy Conservation, Procurement, Quality Assurance
Shift Management, MIS, HSE, Materials Management, Vendor Development, Electromechanical Activities

Languages

Arabic
Expert
English
Expert
French
Intermediate