Total Years of Experience: 20 Years, 0 Months
June 2019
To April 2020
OPERATION AND MEAINTENANCE LEAD
at General Electric - United Arab Emirates
Location :
Egypt - Asyut
Lead all activities of Operation and maintenance team during Steam turbine and HRSGs Reliability tests and performance tests and normal operation
January 2019
To April 2019
STEAM TURBINE MECHANICAL COMMISSIONING TFA
at General Electric - United Arab Emirates
Location :
Oman - Sohar
Carried out STG ALSTOM commissioning activities.
Bentley Nevada system RAK configurations.
Steam Turbine valve tightening test.
Steam Turbine Startup and over speed test.
Synchronization up to base load.
Turbine load rejection test.
Bentley Nevada system RAK configurations.
Steam Turbine valve tightening test.
Steam Turbine Startup and over speed test.
Synchronization up to base load.
Turbine load rejection test.
May 2011
To September 2011
PROJECT LOCATION
at TOSHIBA PLANT SYSTEMS & SERVICES CO
Location :
Egypt
July 2007
To March 2009
MECHANICAL MAINTENANCE ENGINEER
Location :
Egypt
RESPONSIBILITY : Plan and execute Maintenance and overhauling of boiler feed water pumps, feedwater heat exchanger large
capacity, large vertical pumps (circulating water pumps, condensate extraction pumps, different types of valves including assembly,
disassembly, and inspection.
capacity, large vertical pumps (circulating water pumps, condensate extraction pumps, different types of valves including assembly,
disassembly, and inspection.
July 2004
To June 2007
MECHANICAL MAINTENANCE ENGINEER
at DOHA
Location :
Kuwait
PROJECT :
January 2000
To June 2004
OPERATION ENGINEER
at UEEPC
Location :
Egypt - Asyut
PROJECT LOCATION : ASSUIT THERMAL POWER PLANT 2*325MW /EGYPT
AL -KURAIMAT THERMAL POWER PLANT 2*625MW/ EGYPT
AL -KURAIMAT THERMAL POWER PLANT 2*625MW/ EGYPT