Technical Office Head, 03/2016 to Current AFCO STEEL - MEMBER OF MITWALLI STEEL GROUP
Streamlined office operations by implementing efficient administrative procedures. • Fostered a positive work environment for improved employee morale. • Improved communication flow with introduction of team meetings. • Enhanced productivity through implementation of effective delegation strategies. • Managed staff rosters for optimal work distribution. • Implemented new data management systems for increased efficiency. • Ensured compliance with industry standards, resulting in fewer audit findings. • Boosted customer satisfaction with prompt and accurate response to queries. • Maintained high standards of accuracy and quality in data entry and recordkeeping.Created and submitted progress reports to upper management. Resolved team conflicts and assisted with identified problems to maintain sense of teamwork. Estimation and design of steel structures and preparing commercial offers for steel projects in market using best economical sections Preparing/reviewing 2D or 3D Analysis Model with detailed calculation report and full connections design to be submitted for consultant approval Preparing/reviewing proposed design drawings using CAD to clients Preparing/reviewing Shop drawings using TEKLA & send to workshop for fabrications Creating/reviewing Material list for purchasing after using Nesting softwares Following up with erection team in site and solving site problems Projects executed with AFCO: Design, Detail, coordinate, fabricate, preparing technical material submittals and follow up all steel structure works and fit outs in SEVEN projects at Seven ABHA (3500 ton), Seven Jazan (5300 ton), Seven Kharj (3000 ton), Seven Taif (2450 ton), and Seven Makkah (3600 ton) Jeddah's Islamic Biennale, Design, Coordination, Fabrication, Fireproof Painting, Supply, Installation for 10 Steel Structure Buildings with steel composite metal decking and sandwich panels & miscellaneous works for total built up area 30, 000 sq with total tonnage 4500 tons in 4 months. Design, coordination, detailing and leading the technical team to finish all technical submittal in 40 days with modifying as per client request in the middle of work Al ULA FILM STUDIOS & SOUND STAGE PROJECT, 1800 tons. MBC Studios Phase 1 at Riyadh, 1000 ton. Neom Construction Villages 5K & 10K for 104 PEB buildings. Formula F1 Grand prix Jeddah, Pedestrian Bridge and Vehicle bridge. DEVELOPING & REHABILITATION OF PILGRIMS TENTS AND UTILITIESAT HOLY MENA - MAKKAH NEOM NEC STRUCTUAL UPGRADE Jubail 3A Independent Water Plant -RO RACKS & ERD STRUCTURE Holy Haram Makkah Extension - Marwa Bridge & Balcony Project (current) - 4000 ton project - redesigning steel connections and preparing shop drawings and erection drawings Jeddah's Pedestrian Bridges KING ABDULLAH UNIVERSITY OF SCIENCE AND ARTS ( KAUST) Jeddah's advertising flag pole boards National Guard Hospital Projects in Qassim, Taif, Riyadh and Jeddah under NESMA for all Steel elements like platforms, linking bridge, Internal Glass Partitions, Trench covers, Stairs, Shafts, car park sheds, … etc Design and detailing of Gharbiya Steel Factory (20, 000 m2) with concrete works (done) & Gharbiya Steel Mill Factory - 1200 ton - (under design) Al Bakri Hotel, Jeddah - making design, coordination and shop drawing for 8 story Hotel (suspended) King Salman International Convention Center (KSICC) - design and shop drawing for all steel catwalk & platforms • 2 different Pre Engineered Built-up cold store warehouses (80x250m xheight 16m) each one 20, 000 m2 in third industrial city for KGL company - design and shop drawingsDesign steel systems supporting movable cranes for ACE-cranes as our factory has jv with ACE
Design and shop drawing for Iron melting factory 'Majalat Steel' with area 70x111 m and height of 22m The factory has 10 cranes starting from 10 ton to 50 ton, also with design of concrete works for foundations and else
- مجال الشركة:
- الهندسة المدنية
- الدور الوظيفي:
-
الهندسة المدنية