Talha Tariq, Project Lead Engineer (Control Systems - Onshore and Offshore)

Talha Tariq

Project Lead Engineer (Control Systems - Onshore and Offshore)

ABB AS

البلد
النرويج
التعليم
بكالوريوس, Electronics & Communication
الخبرات
18 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 9 أشهر

Project Lead Engineer (Control Systems - Onshore and Offshore) في ABB AS
  • النرويج - Stavanger
  • أشغل هذه الوظيفة منذ أكتوبر 2018
Senior Project Engineer (Control Systems - Onshore and Offshore) في ABB AS
  • النرويج
  • مارس 2013 إلى سبتمبر 2018

Office and On-Site Work:
- Installation, Commissioning, Service, Upgrade and Programming of Control Systems.
- Integration of Electrical System (MCCs, Switchgears, Breakers, Relays & Measuring Devices).
- Integration of Field Devices using Protocols like Profibus, Profinet, Modbus, Drivebus & OPC etc.
- Substation Automation using IEC61850 interface with ABB Relays.
- Installation, Configuration and troubleshooting of Ethernet and Fiber Optic switches and networks.
- Network designing using Domain Controllers and Workgroup based Windows Servers and Systems.
- Preparation of System Design and Specification documents based on site surveys.
- Understanding of Loop Drawings, P&IDs, PFDs, Single Line diagrams, GA Drawings & Network Drawings etc.
- Supervision of sub-contractors for installation, de-commissioning / commissioning of control equipment and
mechanical work in conjunction with the installation of electrical components.
- Project Management of minor/mid-sized Service and Control System upgrade projects in Oil Refinery, Gas
Processing Plant, Petrochemical Plants, Power Plant, GOSP and Sea Water Processing Plants.

Softwares Worked on:
- Technical: ABB System 800xA, Visual Basic for Graphics, SQL Database, Composer 5.0, GPI3.0, KwikEdit,
PlantGuard ToolSet, RSview32, Allen-Bradley RSLogix5000, Allen-Bradley RSLinx, ENI Utility, Rosemount Win
OPI & Win setup for Auto Tank Gauging System, Honeywell E.B.I Software for Fire & Gas
- Programming: Visual Basic for Graphics (HMI), C/C++
- Planning: MS Project, Primavera P3
- Operating Systems: Windows XP, Windows 7, Windows Server 2003/2008,
- Office: MS Office, Lotus Notes

Hardware Worked on:
- PLC/DCS: ABB System 800xA, ABB Harmony Infi90, ABB PlantGuard ESD, Compact Logix5000 PLC
- F&G System: Honeywell Delta Net FS90 Controller
- Field Instruments: SAAB Rosemount Tank Gauging System, Various Field Instruments
- Computers: Dell/Compaq Servers & workstations.
- Computer Network: Cisco/Ruggedcom/Hirschmann Network Switches. Fiber Optic

Senior Projects & Service Engineer - Control Systems في ABB Automation Co. Ltd.
  • المملكة العربية السعودية
  • مايو 2008 إلى فبراير 2013

- Troubleshoot hardware, software and performance related issues of Control System on-site.
- Control System modifications and additions, both on-line and off-line.
- Creation of new Process Graphics or editing old HMI displays/screens for new additions.
- Installation, Commissioning, Preventive and corrective maintenance of PLC / DCS Systems.
- Design and define Control System components including GA/IGA Drawings, Architecture Drawings, Wiring
Diagrams, Signal Lists, Tag Database and HMI.
- Prepare system integration/interface documents, system specification, FAT and SAT documents.
- Conduct Control System pre-commissioning, commissioning, Startup and perform Site Acceptance Tests.
- Clarify and seek customer approvals on project deliverables.
- Assist project manager in resolving any scheduling conflicts to achieve project delivery requirements.
- Assist Proposal Engineering team on system engineering efforts.
- Actively participate in Department’s growth plans by identifying opportunities to provide additional services
in the installed base.

Project Engineer (Electrical & Instrumentation) في DESCON Engineering
  • الإمارات العربية المتحدة - أبو ظبي
  • نوفمبر 2006 إلى مارس 2008

- To review Equipment and Instruments datasheets for preparation of method statements / procedures for Site Installations.
- Supervise mechanical and electrical sub-contractors, and instrumentation de-installation / reinstallation
- Managing and developing list of deliverables by reviewing project drawings.
- To report regularly to the Client on project progress, potential problems and solutions to any such problems by raising Technical Queries.
- To act as the focal point for communication with Project Site and Client.
- To prepare project schedule and external / internal progress reports.
- To attend external and internal progress review meetings.
- To get document and material approvals from client as per contract documents.
- To ensure that project works are executed safely, with quality, schedule and cost objectives with mutual satisfaction of the customer and the company.

Trainee Engineer (Instrument & Control) في Attock Oil Refinery Limited
  • باكستان - روالبندي
  • يوليو 2005 إلى نوفمبر 2006

- Work with plant engineers, process operators and instrument technicians to investigate and troubleshoot upsets regarding field instruments, DCS, Auto Tank Gauging System, Fire & Gas system and related plant.
- Implement control strategies for new and existing plant processes.
- Develop procedures for plant maintenance, Instrument Calibration, System upgrade and Installation.
- Coordinate with consultants and contractors regarding site modification and installations.
- Participate in maintenance activities during plant shutdowns by coordinating the execution plans for pre-shutdown, shutdown and post-shutdown activities.
- Prepare local and foreign inquiries for procurement of instruments/equipments.
- Communicate with equipment vendors, resolving issues concerning latest technology and up gradation of equipments.

الخلفية التعليمية

بكالوريوس, Electronics & Communication
  • في National University of Science and Technology (NUST),
  • مايو 2005

Bachelor of Electrical Engineering

Specialties & Skills

Technical Issues
Hardware 2FSoftware Installation
Control System Design
Preventive Maintenance
System Specification
Commissioning and Service of Control Systems
Substation Automation using IEC61850
Control System (PLC, DCS, Fire and Gas, Electrical Control)
Automation

اللغات

الانجليزية
متمرّس
العربية
مبتدئ
النرويجية
مبتدئ