Mubin Mulla, qa electrical lead engineer

Mubin Mulla

qa electrical lead engineer

Saudi Basic Industries Corporation - Sabic

Location
India - Mumbai
Education
Diploma, Electrical Engineering
Experience
20 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 8 Months

qa electrical lead engineer at Saudi Basic Industries Corporation - Sabic
  • Saudi Arabia - Yanbu
  • May 2018 to December 2023
electrical site inspection site engineer at Saudi Basic Industries Corporation - Sabic
  • Saudi Arabia - Jubail
  • October 2017 to May 2018
electrical site inspection principal engineer at Saudi Basic Industries Corporation - Sabic
  • Saudi Arabia - Jubail
  • October 2015 to September 2017
Electrical Engineer at SABIC E&PM – SEP(saudi Elastomer project)
  • Saudi Arabia - Jubail
  • July 2014 to October 2015

Electrical : Supervision of

 Installation of MV & LV electrical equipment’s in substation .
 Installation and conducting testing for MV & LV cables within the project.
 Supervision for installation of all required electrical trays, conduits and components in field.
 Close follow up with EPC for over all Material
 Coordinate with EPC engineers & supervisors and ensure to complete the scheduled activities on time.

Instrumentation : Supervision of

 Installation of DCS, PLC, SIS & Network cabinets in RIB and RCB.
 Installation of FOC, MODBUS and PROFIBUS, FTE within the networks
 Coordination with interface projects Dept. for activities OSBL and ensure it to be done as scheduled.
 Installation of consoles desk & cabinets in main CB.
 Installation of different type of instruments in field & on vessels & Tanks
 Installations of Analyzers and its sample collection points through bundle tubing in the field.
 Installation of different Toxic and LEL gas detectors in the field.
 Coordination with EPC and different vendors per equipment’s installed in the field.

Pre-Commissioning: Supervision of

 Attending the walkthrough with the affiliates.
 Follow-up for energization of electrical equipment’s and instrument cabinets.
 Involved in loop check activities
 Follow-up of closing HCS punches as well as clearing the PSSR BUT list for Mechanical completion .

Electrical Engineer at SABIC E&PM – IBN Sina (MMA-PMMA PROJECT )
  • Saudi Arabia - Jubail
  • May 2014 to June 2014

Involved in and early designs & engineering issues
Involved in interface issues with other projects.

Electrical QA / QC & Instrument inspector. at SABIC E&PM - BMP- YANPET(Benzene Mitigation project )
  • Saudi Arabia - Jubail
  • November 2013 to April 2014

Electrical:
 Review and approval of schematics and drawings.
 Inspection and testing of all Electrical equipment’s, including LV cables, cable tray, LV panels and other related substation equipment’s.
 Inspection for installation and Testing of MV cables OF 4.16 kV TO 34.5 kV
 Inspection for Installation and testing of 2.5MVA TO 8 MVA, 34.5 kV/4.16kV and 4.16 kV/480V Substation Transformers
 Inspection for installation and testing of 34.5 kV & 4.16 kV power center Switchgears & MCC.
 Inspection of UPS, battery chargers and Its monitoring system
 Testing of motors for their insulation resistance, winding resistance and PI value, as well as conducting solo run test.
 Witnessing the Relay, CT, PT and Breaker testing as well as its setting as per project specifications.
 Conducting SAT for all electrical equipment.
 Review and Approval of Method statement & ITP.
 Inspection and testing of Electrical equipment’s and power cable termination in substation and field equipment, junction box, Local control station as well as distribution panels.
 Inspection of Cable tray Installations, Conduits and fittings in hazardous and non- hazardous areas.
 Inspection of installation of lighting fixtures and testing the illumination level.
 Witness for transformer testing and its protection schemes.

Instrumentation:

 Review and approval of drawings and document Like ILD’s & Loop folders etc..
 Inspection and witness the testing of GC Analyzer system
 Commissioning of Analyzer shelter.
 Inspection and witness of Instrument bench calibration and Installation per approved DATA sheets
 Involved in loop check with the end-user.
 Involved in PLC and DCS functional test following cause and effect Matrix.

Fire and gas detection system:
 Inspection of installation and testing of F&G detection system integrated with DCS .
 Functional testing and commissioning of F& G system as per approved matrix.
 Coordinate with the (sub) contractors and facilitate vendors on pre-comm.
 Verify the accuracy and completeness of the ‘as built’ drawings.
 Close monitoring the site work execution and Issue SSR & NCR for the violation of standards.
 Coordinate with main contractor to obtain the quality output of work
 Final review and approval of dossier.

Electrical QA / QC & cathodic protection inspector. at SABIC E&PM- HLPE(Hadeed long expansion project)
  • Saudi Arabia - Jubail
  • November 2011 to October 2013

Inspection and testing of all Electrical equipment’s, including cables, cable tray panels andFOC.
Testing of MV cables OF 11kV TO 34.5 kV
Inspection for Installation and testing of 2.5MVA TO 8 MVA, 34.5 kV/480 V Substation
Transformers and Inspection for installation and testing of 34.5 kV power center Switchgear
Testing of motors from 1KW to 700 KW for their insulation resistance, winding resistance and PI value, as well as conducting solo run test.
Review and Approval of Method statement & ITP.
Inspection and testing of Electrical equipment’s and power cable terminal in field equipment, junction box, Local control station and distribution panels.
Inspection of Cable tray Installations, Conduits and fittings in hazardous and non- hazardous areas.
Inspection of installation of lighting fixtures and testing the illumination level.
Witness for material& conduct Site acceptance test.
Witness for transformer testing with Operation team of plant.
Coordinate with the (sub) contractors and facilitate vendors on pre-comm.
Verify the accuracy and completeness of the ‘as built’ drawings.
Close monitoring the site work execution and Issue SSR & NCR for the violation of standards.
Coordinate with main contractor to obtain the quality output of work
Final review and approval of dossier.

Sr. QA/QC & Electrical Engineer at Gulf Power International for (Shoiba Power Plant)
  • Saudi Arabia - Jeddah
  • September 2010 to October 2011

* Inspection and testing of all Electrical equipment’s, Coordinate with 13.8 KV and 4.16
KV Substation Transformers and Switchgear installation and commissioning activities.
* Review and preparation of ITP.
* Low Voltage Switchgear (480 Volts) testing and pre- commissioning activities.
* Inspection and testing of Electrical equipments and power cable terminal in field equipment, junction box, Local control station and distribution panels.
* Inspection of Cable tray Installations, Conduits and fittings in hazardous and non-hazardous areas.
* Witness for transformer testing with project management team (PMT) and proponent.
* Visual inspection for Installation of Automatic Transfer Switch (ATS), Relay
Interfacing Panel (RP), Circuit Breaker Test Cabinet, Lighting Panels, Power Panels etc.
* Arrangement of utilities material to fulfill the requirements on site.
* Monitoring Workers for their workmanship as per standards.
* Coordinate with the (sub) contractors and facilitate vendors on pre-comm.
* Verify the accuracy and completeness of the ‘as built’ drawings.
* Final inspection for the documentation and as built drawings.
* Preparation of QC dossier for submission to the client.

Project Engineer at SABIC-E&PM- SAFCO SITE PROJECT MANAGEMENT TEAM
  • Saudi Arabia - Jubail
  • November 2008 to August 2010

SUMMARY OF PROJECTS EXECUTED: -

a) ICCP (Impressed Current CATHODIC Protection system )

b) Providing ELEVATOR in Granulation area SAFCO/IBN BAYTAR.

c) Upgrade & installation of new Emergency siren system for SAFCO/IBN BAYTAR.

d) Urea Prill Tower (Mega Project )

e) Different small projects with respect to Electrical.

 Dealing with the originator of the project.
 Preparation of FEEP (front end engineering package)
 Preparation of ITB (invitation to bid)
 Review and approve the drawings to issue for construction (IFC).
 Review & Prepare the ITP (inspection test plan).
 Inspecting the job as per the contractors submitted RFI.
 Monitoring and supervision of project.
 Preparation of pre-commissioning procedures.
 Witness for testing and commissioning of upstream Feeders, MV & HV cables.
 Witness for testing of LV, & Control cables.
 Witness for testing and commissioning of 0.480 kV & 4.16 kV Switchgear, MCC, VFDs, RMU, Transformers H.V cables etc..
 Review of MCC Schematics drawings.
 Involvement in preparation of transformers protection schemes.
 Supporting for preparation of panel termination Arrangement & preparation of ferule philosophy.
 Responsible for preparing /approving the final test reports.

QA/QC Electrical at FOSTER WHEELER, SHARQ 3rd expansion U&O project MMG, for SABIC
  • Saudi Arabia - Jubail
  • January 2007 to October 2008

Dealing with the originator of the project.
Preparation of FEEP (front end engineering package)
Preparation of ITB (invitation to bid)
Review and approve the drawings to issue for construction (IFC).
Review & Prepare the ITP (inspection test plan).
Inspecting the job as per the contractors submitted RFI.
Monitoring and supervision of project.
Preparation of pre-commissioning procedures.
Witness for testing and commissioning of upstream Feeders, MV & HV cables.
Witness for testing of LV, & Control cables.
Witness for testing and commissioning of 0.480 kV & 4.16 kV Switchgear, MCC, VFDs, RMU, Transformers H.V cables etc..
Review of MCC Schematics drawings.
Involvement in preparation of transformers protection schemes.
Supporting for preparation of panel termination Arrangement & preparation of ferule philosophy.
Responsible for preparing /approving the final test reports.

Electrical Engineer at Construction projects specialists
  • Saudi Arabia - Khobar
  • March 2006 to December 2006

 Erection of 1000 kVA, 34.5 kV - 480 / 220 V Xmer.
 Installation of MV switchgears.
 Installing of MDPS and testing it completely.
 Laying H T underground cables and tests on it.
 Laying of cables in cable trenches and on cable trays for machineries connection.
 Testing and commissioning of cables and installed equipments.
 Responsible for preparing the test reports.
 Preparation of as-built and revised drawings in projects with AutoCAD

Electrical Engineer at Mohammad Hussain Al Shammri Es
  • Saudi Arabia - Jubail
  • December 2004 to February 2006

Erection of 1000 kVA, 34.5 kV - 480 / 220 V Xmer.
Installation of MV switchgears.
Installing of MDPS and testing it completely.
Laying H T underground cables and tests on it.
Laying of cables in cable trenches and on cable trays for machineries connection.
Testing and commissioning of cables and installed equipments.
Responsible for preparing the test reports.
Preparation of as-built and revised drawings in projects with AutoCAD

Trainee Electrical Engineer at MRM Electrical services-Bhaba Atomic research center
  • India - Mumbai
  • May 2003 to December 2004

 Overall responsibility for rewiring of residential and commercial bldgs. Worked out in BARC.(Bhaba Atomic Research Center )
 Installation of LV switchgears.
 Installation of panels, change over switches etc.
 Testing and commissioning of cables and installed equipments.
 Preparation of revised drawings through CAD.
 Preparing of BOQ and procurement
 Projects scheduling, supervision, monitoring and planning

Education

Diploma, Electrical Engineering
  • at MSBTE
  • June 2003
High school or equivalent,
  • at Sacred Heart Convent High School
  • January 2000

from

Specialties & Skills

CABLEADO
CUSTOMER RELATIONS
DOCUMENTATION
ENGINEERING
LIGHTING
PROJECT MANAGEMENT
QUALITY
QUALITY CONTROL
SWITCHES

Languages

Arabic
Expert
English
Expert
Hindi
Expert
Urdu
Expert