Sr. Technical Professional Piping/ Pipeline
KBR-AMCDE
Total years of experience :16 years, 9 Months
Follow up and coordinating with various Engineering
disciplines and Purchase department for interflow of required
information for timely completion of Engineering activities
* Attending technical discussions with sub-contractors on
equipment and piping items and implementing site
modifications
* Review of deliverable progress including client model
reviews
* Endorsing documents and drawings from Sub contractors
* Check and Approve cost & man-hour estimates from Sub
contractors
Layout
* Preparation of Equipment Layout
* Develop the Plot Plan & Equipment Layouts based on the
process and client requirements.
* Issuing Nozzle orientation of Storage Tanks, Drums &
Pressure Vessels
* Piping Studies, Issuing of Nozzle orientation, Pipe routing in
PDS/PDMS
* Responsible for the Planning, Checking and Issuance of Piping
Deliverables for IFR, IFA & IFC
* Vendor drawing checking and commenting
* Issuing Drawings for Inter Disciplinary Check (IDC)
* Review & Providing Inter Disciplinary comments on PID’s,
Civil/ Structural drawings. Mechanical GA Drawings,
Instrument Data Sheets
* Piping General Arrangement Drawing
* FEED verification & preparation of FEED deficiency report.
* Identify, verify and detail all FEED tie in points and associated
long leads
Stress and Supports
* Stress calculation report evaluation
* Node Marking (Load Map) input for structure design
* Selection of pipe support as per Stress calculation
* Support design of non-critical lines
Materials
* Preparation of Piping Material Specification (PMS)
* Material Study & Checking against Client Spec
* Estimate bulk material (MTOs)
* Floating Material requisition and Supply requisition
* Valve data Sheets
* Technical evaluation of bids (TBE)
* NMR Reviews
* SP Item data sheets
Responsible for Reviewing Storage Tank Drawings & Calculations from Saudi Electric Company (SEC) Approved Design Contractor, Technical Bid Evaluation, Liaison with Client, Design Contractor and Piping Material Purchaser.
Projects
1. Installation of Crude Charge Heater for Howe Baker’s Unit, Rawalpindi, Pakistan.
Capacity: 6500 BPSD, Consist of Crude Charge Heater and its associated Piping
Responsible for reviewing vendor drawings for Crude Charge Heater, Issuance of Nozzle Orientation, Review & Approval of Piping General Arrangement
Drawings, Stress Analysis, Isometrics & Material Take Off, Site Modifications, Participated in
HAZOP, and Prepared Punch List for Commissioning of Crude Charge Heater.
2.Installation of 1000 SCFM Instrument Air Compressor, Rawalpindi, Pakistan.
Capacity 1000 SCFM, Skid Mounted Instrument Air Compressor Package and its associated Piping.
Responsible for reviewing vendor drawings for Instrument Air Compressor Package, Preparation of In house design package for Instrument Air Piping, Preparation of Plot Plan, Equipment Layout, Piping GA Drawings, Isometrics, Material Take Off.
3. Installation of High Capacity Pumps at Product Metering Station, Rawalpindi, Pakistan.
Capacity 750 GPM, Three Centrifugal Pumps and its associated Piping
Responsible for reviewing Vendor drawings for Centrifugal Pumps, Preparation of In house design package for Piping of High Capacity Product Metering Station, Preparation of Equipment Layout, Piping GA Drawings, Isometrics, Material Take Off.
4. Up-gradation of Attock Refinery Limited Fire Water Network, Rawalpindi, Pakistan.
Fire Water Pumps and Fire Water Network for Attock Refinery Limited.
Review of Study Reports for Upgradation of Fire Water Network, Preparation of ER Estimate, Preparation of In house design package.
5. Construction of Storage Tank for Naphtha, Rawalpindi, Pakistan.
Capacity 42, 000 BBL Floating Roof API-650 Tank and its associated Piping
Piping Design Engineer, Review of Vendor Drawings/ Calculations for Floating Roof Tank, Preparation of ER Estimate, Preparation of In house design for Storage Tank Piping
Administrative and technical control of Paint Shop regarding Quality Control, Cost
Control, KAIZEN activities (process of continuous improvement), Production, Planning
and Monitoring of special projects by optimizing the annual CAPEX.
* Human resource management of a crew of about 150 staff including Technicians, Assistant
Technical Officers & workers.