Muhammad Abouzaid, Senior Civil  Engineer

Muhammad Abouzaid

Senior Civil Engineer

HUTA Foundation

Location
Saudi Arabia
Education
Bachelor's degree, construction
Experience
21 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 6 Months

Senior Civil Engineer at HUTA Foundation
  • Saudi Arabia - Jeddah
  • My current job since December 2011

 King Abdulaziz International Airport development project in Jeddah.

Consultant: DAR ALHANDSA
Main contractor: SAUDI BINLADIN GROUP(ABCD)
Tests (Integrity, Static and Cross hole Sonic(.

Scope of Work: Executed Works-Deep Foundations (Hundreds of Secant piles Dia120cm depth around 25m in( Zon A, B&C) Contract No. 421.

Executed Works-Deep Foundations (Hundreds of Secant piles &Bored piles Dia 120 cm depth around 35m in Railway Station) Contract No 422.
Supervising on Subcontractor (Ameco ) in Piles (Railway Station).

Executed Works-Deep Foundations ( Hundreds of Secant piles with Anchoring Dia 120 cm about depth 30m in Arterial 4 ) Contract No 422
Supervising on Subcontractors ( Altmsah Co. & Dar Altkamol Co.) in Secant piles with Anchoring in Arterial 4 .

Supervising on Subcontractors ( Kazkatach Co. & NSCC Co.) in Diaphragm wall with Anchoring depth around 35m in Arterial 4 .

Remaining Working piles in Separated sites by Subcontractors Altmsah Co. .

 King Abdullah Foundation Project in Riyadh.

Cleint: ARAMCO.
Consultant: ALDYAR AL SAUDIA
Main contractor: SAUDI BINLADIN GROUP(ABCD)
Tests (Integrity, O Cell, Static and Cross hole Sonic(.


Executed Works-Deep Foundations (320 Bored Piles Dia 120 cm &100 cm depth 30 m)

 HOLY HARAM EXPANSION -MINARET 1 - ZONE 12

Consultant: DAR ALHANDSA
Main contractor: SAUDI BINLADIN GROUP(ABCD)
Tests (Integrity&Static (.

Executed Works -Deep Foundations (193 Bored Piles Dia120cm depth 11m in Rock)


 First Ring Road in Project in Makkah ( Umm Alquraa Street Shoring System ) .
Consultant: DAR ALHANDSA
Main contractor: SAUDI BINLADIN GROUP(ABCD)
Tests (Integrity)

Executed Works -Deep Foundations (137 Contiguous Piles with Anchoring Dia 120cm depth 12m in rock)

 Khurais Interchange Project in Riyadh .

Consultant: DAR ALHANDSA
Main contractor: SAUDI BINLADIN GROUP(ABCD)
Tests (Integrity, Static, Crown and Cross hole Sonic(.


Executed Works-Deep Foundations (250 Bored Piles Dia 120 cm depth 35m)

 First Ring Road in Project in Makkah ( lowering of Jabal ALkaba Road )

Consultant: DAR ALHANDSA
Main contractor: SAUDI BINLADIN GROUP(ABCD)
Tests (Integrity)


 Executed Works-Deep Foundations (93 Contiguous Piles with Anchoring Dia 80 cm depth 35m )

 Kudi Towers project in Makkah.


Consultant: DAR ALHANDSA
Main contractor: SAUDI BINLADIN GROUP(ABCD)

Executed Works (20Bored Piles Dia 120 cm depth 18m in Rock)

 Jabal Alkaba Station Project.

Consultant: DAR ALHANDSA
Main contractor: SAUDI BINLADIN GROUP(ABCD)

Execute -Deep Foundations -Shoring System (Berliner Wall) 500 soldier piles Dia 80 cm & HEB600 depth 14m .

 STC Holy Name Towers .

Cleint:STC
Executed-Deep Foundations ( Micro piles Dia 30 cm )

Building manager at  SAUDI BINLADIN GROUP (Public Buildings & Airports).
  • Saudi Arabia - Riyadh
  • June 2009 to November 2011

 GIRLS UNIVERITY PROJECT ( KING SAUD UNIVERSITY ) in Riyadh
Consultant: Saudi Consultants

Project DATE: Jun 2009 until 25 Nov 2011
Project Value: 320000000 SR
MY POSITION: Building Manager

(pharmacy college ) B8 Area (8500 m2 ) at one floor & all area (50000 m2)
 Demolish & rebuilding Shear wall Cores ( 5th floors ) floor height 4.8m
 ( Precast works ) erected precast members ( Columns, beams, hollow core slabs & cladding )
 ( Reinf. concrete Works) Executed ( footings, retaining wall, shear wall, stairs, columns, beams(barbet), solid slab & structural screed )
 ( Remedial works ) for ( Corbels, shoulders & jacket for ( Columns & Cores )
 ( Finishing works ) executed ( terracotta Tiles, Aluminum composite cladding, Arch. Screed, Marbles, Gypsum board, Epoxy, Porcelain, Ceramic Tiles, curtain wall, ….etc.)
 ( Steel works ) executed ( Skylight & steel structure(portal frame)

 Sub contractor ( Beach Village Co. ) SAUDI BIN LADIN GROUP

 GIRLS UNIVERITY PROJECT ( KING SAUD UNIVERSITY )
 Building no.9(Area=8290m2) reinforcement concrete works (Raft foundation, slab on grad, sub tunnel foundation, isolated footings, retaining walls ( height (4, 7m)) & all shear walls ( cores) Consists of (stair case) & (elevator case) (height (24m) )- precast members are bearing on shear wall.
 Building no.12( Area=6020m2 )reinf. concrete works (slab on grad, sub tunnel foundation, isolated footings, strip footings, retaining walls ( height (4, 7m)), all shear walls ( cores) Consists of stair case & elevator case (height (24m) ) precast members are bearing on shear wall .
 Building no.5 ( Area=2300m2 ) rein. concrete works ( column, shear walls, 3rd floor slab & roof slab ) at part 5.

 Sub contractor Omnia Co. ( Beach Village Co. ) SAUDI BINLADIN GROUP.

King Abdullah Financial District .

 PARCEL 4.01 ( Area= 6700 m2) & PARCEL 4.02( Area=5200m2 ) reinforcement concrete works is started ( injection of soil, perforated pipe, Grid beam Mass concrete & RFT)

Safety & Quality Control Engineer at Jeddah Municipality
  • Saudi Arabia - Jeddah
  • January 2007 to May 2009

 Member in coordinator team for infrastructure projects (Services projects) in projects co-ordination office (PCO)
 Monitored and controlled excavations of infrastructure projects ( Drainage, water supply, communications, electrical power lines, ……etc. )
 Coordinating the excavation infrastructure projects in Jeddah .
Applying Safety regulations to all excavation project according to ( O.S.H.A. ) Standards.
 Applying Quality standards for all excavations projects and road constructions.
 Trained municipality stuff and Drainage contractors for quality planning, quality assurance and quality Control ( excavation work for infrastructure projects)

Site Civil Engineer at Hassan Allam Sons CO
  • Egypt - Cairo
  • November 2003 to December 2006

COSULTANT: Dr/ Algazali Kseeba
Project Date: JUN 2005 TO DEC 2006
Project Value: 500, 000, 000L.E.
MY POSITION: Site engineer

National Museum For Egyptian Civilization Project in cairo

 (Rienf. Concrete works) Executed (Part 6) Raft foundation, all shear wall (cores), retaining wall, columns, stairs & 1st floor is inclined slab (860m3)- 2nd floor (650 m3), Mezzanine (160m3) & roof is ( paneled beam) slab (600 m3 ).
 Executed (part 2) retaining wall, columns, stair& 1st floor.
 Executed (part 7) roof is (paneled beam) slab (300 m3), ( part 8) roof is (paneled beam) slab (300 m3) & ( part 4) roof is ( paneled beam) slab (450 m3) all the roofs its height 11m from 2nd floor.
 Executed Bus parking roof (part 3) is inclined slab (455 m3) & roof ( part 4 ) is inclined( paneled beam) slab (455 m3)

 (Wahab Co.).


Project Value: 50, 000, 000LE
Project DATE: FEB 2005 to MAY 2005
MY POSITION:Site&Tech Engineer

 Tower prestige Hotel Project (5th Stars) In Sharm El Sheikh

Executed (Rien. Concrete Works)in part D, E & Main building (isolated footings, columns , first floor slabs for part D, E, main building & second floor slabs for part D, E).

 (C.C.C. Co. (J.V.) Hassan Allam Sons CO.)

Consultant: PGESCo
Project Value: 320, 000, 000LE
Project DATE: Nov2003 to Feb2005
MY POSITION:Site Engineer

 Nobaria Power Station Project. Stage ( I & II ) S.T.G I & II - C.T.G I & II In Al Behera Governorate ( Consider biggest Power Station in EGYPT)
 Executed Rienf. Concrete works in ( S.T.G. II ) RFT Foundation, slab on grad, retaining walls (height 5.5m), piece wall (height 5.5m), column (dim. 2, 20m *2, 40m*11, 80 m) & STG II roof .
 Waterproofing works for STG II (primer coat over Rien. Concrete, Bituminous membrane, kartonal sheets, ……etc. )
 C.M.U Building (S.T.G I, II - C.T.G I, II - Control Building I & II - & Fire Building ) .
 (Int. & Ex.) finishing ( C.T.G I & II ), ( Pump House ) .

Site Civil Engineer at CONTRACTOR
  • Egypt - Alexandria
  • November 2002 to November 2003

 Service Buildings from Nov. 2002 to Nov.2003 (cost 3000, 000 L .E)

 Maintenance & repair Service Buildings (1st floor, 2nd floor, 3rd floor ) demolish walls &rebuilding it - repair column - demolish bathroom slabs & casted it - ………..etc .
 Isolated works for Bathrooms (Bituminous coat

Education

Bachelor's degree, construction
  • at Ain Shams Unversity _college of engineering
  • October 2002

Study Civil Engineering branches, especially construction of which over several years.It starts from the first year after the preparatory 1st Year where are intensively study design and study his theories in all fields of civil engineering and management, and the history of human evolution With the addition of each year to the area helps make links with all other branches of power and mechanics and extra courses for earthquakes and Project Management and Construction and construction laws

Specialties & Skills

AutoCAD 2D
SAP2000
I have the ability that will enable me to meet the requires of this job perfecty
Sap2000
Auto CAD
MS office ( Excel,Word&powerpoint)
primavera P6

Languages

English
Expert

Training and Certifications

OSHA CERT (Certificate)
Date Attended:
December 2004
QC (Training)
Training Institute:
AL AWAEL
Date Attended:
March 2007
Duration:
60 hours
OSHA (Training)
Training Institute:
Egyptian Center For Industrial Safety & Health
Duration:
30 hours
Sefety&Health (Training)
Training Institute:
AL AWAEL
Date Attended:
March 2007
Duration:
60 hours